Building permit intelligence · Bellevue, WA
633 110TH Ave NE has 105 municipal building permits on file in Downtown. The latest recorded activity was a electrical no plan review permit dated Jul 22, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 40 mapped permits within 500 m of this address.
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (1 Security System)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (1 Security System)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (1 Security System)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (1 Security System)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (165 T-Stat or HVAC Controls)
40 mapped permits within 500 m, shown on the intelligence map above.
This address has 105 permit records in PropertyLabs' public history and is located in Downtown. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 27, 2026.
PropertyLabs compiled this permit history from municipal public records for Bellevue, WA. The latest recorded permit activity at 633 110TH Ave NE is dated Jul 22, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 633 110TH Ave NE in the PropertyLabs platform, along with alerts when new permits are filed at this address.
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (150 T-Stat or HVAC Controls)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (11 T-Stat or HVAC Controls)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (11 T-Stat or HVAC Controls)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (10 T-Stat or HVAC Controls)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (542 T-Stat or HVAC Controls)
A Nonresidential New Structure Low Voltage Only Project Involving (2800 Telecommunications System)
A Nonresidential New Structure Low Voltage Only Project Involving (2960 Telecommunications System)
A Nonresidential New Structure Low Voltage Only Project Involving (202 Telecommunications System)
A Nonresidential New Structure Low Voltage Only Project Involving (3250 Telecommunications System)
A Nonresidential New Structure Low Voltage Only Project Involving (90 Telecommunications System), 718973 SEA105
A Nonresidential Alteration to Existing Structure Electrical Project Involving (58 Temporary Service)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (1 Security System)
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (87 T-Stat or HVAC Controls)
A Nonresidential Addition to Existing Structure Low Voltage Only Project Involving (6 Control Wire)
A Nonresidential Alteration to Existing Structure None Project Involving (1 Hydronic Piping Only)
A Nonresidential Alteration to Existing Structure None Project Involving (2 Hydronic Piping Only)
A Nonresidential Repair or Replacement Low Voltage Only Project Involving (1 Security System)
Use of ROW for traffic control On 110th Ave NE between NE 6th ST and NE 8th ST, Access existing Zayo manhole for fiber splicing.
Installation of four illuminated signs (two wall mounted, two ceiling mounted) in the garage area., 25 118386 SA
Installation of four exterior, illuminated, double-sided parking sign blades.
48ct & 24ct Fiber, .625 coax, 544' pulled through existing conduit.
A Nonresidential New Structure Electrical Project Involving (2 Generator Load Bank Test), none
Revision to the approved concise smoke control for Center of Energy TI 23 117895 BY. Keith Gordon requires new FH permit., 23 117895 BY
Installation of PV system on L5 & L45 composing of the following componenets: L5 99.22 kW - (242) Trina 410 Watt Modules, (1) SolarEdge SE80K-US inverter & (121) SolarEdge P960 Opt…
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (316 Security System)
Continued dismantling and removal of tower crane 2. Scheduled March work., 20 109133 TN
Dismantling and removal of tower crane 2. February scheduled work., 20 109133 TN
A Nonresidential Alteration to Existing Structure Electrical Project Involving (6 Temporary Service)
Installation of UL300 Captive Aire TANK and CORE kitchen fire suppression system
Addition of an interim condition phase to the existing approved design review of Bellevue 600 - Phase 2., 21106968
A Nonresidential Alteration to Existing Structure Electrical Project Involving (10 Temporary Service)
Switch from Temp Power to Permanent power from PSE Transformers
TI for floors 2-4, adding Power Supplies and Speaker/Strobes to meet code.
Need additional morning hours to remove tower crane 1 base, 09/30/2024 & 10/01/2024 5:00 AM to 7:00 AM. 20 109133 TN
EMERGENCY RESPONDER RADIO COVERAGE SYSTEM FOR NEW TOWER., 20 122442 BB 21 102439 BB
Construction noise application for 9/14-9/15 to complete tower crane 2 climb with trucks utilizing the ROW for loading and intermittent closures between 7am and 6pm, 20 109133 TN
Construction noise application for 9/21-9/22 to complete tower 1 removal with trucks utilizing the ROW for loading and intermittent closures between 7am and 8pm., 20 109133 TN
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (1076 Telecommunications System) *add on 151 UHF Das
Construction noise application for tower crane 1 jump on 8/17 and 8/18 with intermittent closures in the ROW., 20 109133 TN
Construction of two office towers with garage and retail functions., 20 101468 LP
Addition of an interim condition phase to the existing approved design review of Bellevue 600 - Phase 2., 21106968
Construction noise exemption to perform our TC2 crane climb on 6/29/24 and 6/30/24., 20 109133 TN
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (1625 Security System)
Installation of (4) water cooled condensing units, 23 117895 BY
Construction noise application for tower crane 1 climb scheduled for 6/1 and 6/2., 20 109133 TN
ext for final 5/20/25 kb. JUT - Project: B-600 Phase 2. TRENCH FROM J1 TO SWITCH VAULTS ON PRIVATE PROPERTY. TRENCHING ACROSS 110TH AVE NE FROM SWITCH VAULTS TO INTERCEPT POINTS IP…
2nd Partial sprinkler permit application for above-ground fully sprinklered office tower. 1 retail floor, 3 floors of Center of Energy (COE) Amenities, 39 shell office floors and o…
upgrade retail storefront at two locations
Construction noise permit application to jump tower crane 2 over the weekend of 4/20 and 4/21., 20 109133 TN
We are hanging 5 CaptiveAire Class1 exhaust hoods. We are setting in place 17 pieces of cooking equipment under the 5 hoods. We are not responsible for any mechanical or electrical…
A Nonresidential Repair or Replacement Electrical Project Involving (2 Heat Trace)
Plumbing work for new initial build-out of levels P1 through level 4., 23 117895 BY
Lighting and Electrical for the COE, which entails a kitchen on P1 and build out of levels 1-4 on the first phase of the Bellevue 600 tower., 20 123106 BG
Noise Variance to mobilize a 550ton mobile crane on 110th Ave NE near the intersection of NE 6th St to remove our tower crane 3 base. This mobile crane will take 5 hours to setup,…
Noise variance for Tower Crane jumps and Tower Crane 3 dismantle., 20 120612 TN
Project consists of TI of four amenity entry floors to corporate office building. Total square footage of 96,511. Floors P1 and 1 through 4.
Mechanical work for new initial build-out of levels P1 through level 4. Includes kitchen areas, walk-in coolers, 23 117895 BY, 21-102504 BL, 24-103340 BL
Delivering a deck, 601
Noise variance for tower crane jumps on 12/9 -10 for tower crane #1 and 12/16-17 for tower crane #2.
A Nonresidential Repair or Replacement Electrical Project Involving (4 Heat Trace)
A Nonresidential Repair or Replacement Electrical Project Involving (15 Heat Trace)
A Nonresidential Repair or Replacement Electrical Project Involving (5 Heat Trace)
A Nonresidential New Structure Low Voltage Only Project Involving (400 Energy Management, 6 T-Stat or HVAC Controls)
noise variance to jump Tower Crane 1 and Tower Crane 2 on the dates listed below. TC#1: 7/22/23, 7/23/23, 7/29/23, 10/7/23, 10/8/23. TC#2: 8/5/23, 8/6/23, 8/12/23, 10/7/23, 10/8/23…
Fire Sprinklers, standpipes, and fire pumps partial submittal for below-grade parking garage. Tower to be future submittal., 20 122442 BB
Lumen to place conduit at the intersection of 110th Ave. NE & NE 6th St. as approved JUT Permit # 20 122373 GD. All work will be behind the construction fence.
Safely jump tower crane #1 to increase the height., 20 122442 BB 6/10/2023 - 6/11/2023 7am - 6pm
Extended it until 7/23/2025 for final inspection only ext 7/25/24 kb. EXT 2/29/24 KB. No more extension MW "See email. EXT 7/27/23 KB.. EXT 2/3/23 KB. Open structures for conduit v…
Temporary installation of plumbing fixtures during construction of the building.
Plumbing package for 43 story/Penthouse new highrise tower located at 600 108th Ave NE.
Noise Variance Application to place the B600 Mat Footing. Sept 10, 2022 2am - 10pm
A Barnhart Mobile AT Crane will be staged to the East of the project on 110th Ave NE (See attached Site Plan). On the morning of Saturday 7/09/22, crews from Northwest Tower Crane,…
Noise Variance request to erect tower crane 1 on site. June 18, 2022 7am-8pm. June 19, 2022 7am-8pm.
Noise variance for expanded hours to set up mobile crane, safely erect tower crane, and break down mobile crane (crane 2). Proposed dates are 6-4-22 and 6-5-22.
2" Water Meter in the ROW. As part of B600 Ph1, 20 122422BB
Shell and Core networked addressable EST3 Fire alarm system with smoke control equipment monitoring, voice evacuation, sprinkler monitoring, emergency control interface with elevat…
Ziply to access MH UNK and trench approx. 106' from MH UNK to new 466MH and then on to private property. All other work and vault access has already been completed through other pe…
Above grade tower for new project located at 600 108th Ave NE
Post Revision # 2: Revised Traffic Control Plans. Post Revision # 1: Revised the conduit counts on page 5 has changed on notes 1 and 2 to contain (5) instead of (4) conduits. Addit…
Deliver and setup mobile office units on the job site., Bellevue 600
Mechanical for new building (garage & tower). TBP
Connect one (1) 8" PVC side sewer lateral from the street to the building., 20 122422BB
Phase 1 building permit foundations and structures to grade.
Clear and grade permit for final grading to ROW frontage and street improvements.
ext 12/11/24 kb. ext 5/2/24 kb. ext for 6 mos to schedule customer - kb. Post Revision # 6: Revised Plans & Clear and Grade Permit attached. Revised scope - adding a new pull vault…
Potelco Line crew will be cutting over existing underground system to the new underground system that is required for the relocation of multiple PSE facilities for new construction…
Installation of FARS throughout the building. 170-001
5506799_Access MH's to place microduct in existing Zayo conduit
CEC Job# 517330 Shell Core Electrical for Phase 1
Office tower with below-grade plumbing. 204080-001. Only for work below garage P6 slab (underground piping)
Demolition of interior tenant improvements on levels 1 through 10.
Shoring for future development located at 600 108th Ave NE.
We are installing an exterior 600AMP fused disconnect to refeed the building/
Conceptual Smoke Control Design for Bellevue 600 - 19 131761 LD Bellevue 600 - Phase One features a new office tower, meeting center, commons space, and retail uses at the…
1 8"x2" water tie in, 2 8x8 water tie in, 1 tie in to existing CB, 1 Connect to Existing SSM, 1 - 8" FDC, 2 - Fire hydrant assembly 2 - Connect to existing SDMH, 1 12" pvc storm co…
Utility extension work related to a future development.
Underground main service connections to the building. There are two connections (one on 6th and one on 110th)
Clear and Grade for early works (utility relocation) for future development.
CEC JOB# 517122- BELLEVUE 600 PHASE 1 TEMPORARY POWER
Post Revision # 38: 24-hour lane shift on the east side of 110th Ave. NE between NE 6th St. and NE 8th St. For tree removal including tree stumps, demolishing the existing sidewalk…
Electrical No Plan Review · Jul 20, 2026