633 110TH Ave NE has 101 municipal building permits on file in Downtown. The latest recorded activity was a electrical no plan review permit dated Jul 14, 2026. Permits at this address represent $372M in total declared construction value. PropertyLabs also identified 40 mapped permits within 500 m of this address.

At this address
101
Nearby (500 m)
40
Latest activity
Jul 14, 2026
Total permitted value
$372M

Permit activity timeline

  1. Electrical No Plan ReviewIssuedProject value hiddenJul 14, 2026

    A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (165 T-Stat or HVAC Controls)

  2. Electrical No Plan ReviewIssuedProject value hiddenJul 14, 2026

    A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (150 T-Stat or HVAC Controls)

  3. Electrical No Plan ReviewIssuedProject value hiddenJul 14, 2026

    A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (11 T-Stat or HVAC Controls)

  4. Electrical No Plan ReviewIssuedProject value hiddenJul 14, 2026

    A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (11 T-Stat or HVAC Controls)

  5. Electrical No Plan ReviewIssuedProject value hiddenJul 14, 2026

    A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (10 T-Stat or HVAC Controls)

  6. Electrical No Plan ReviewIssuedProject value hiddenJun 5, 2026

    A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (542 T-Stat or HVAC Controls)

  7. Electrical No Plan ReviewIssuedProject value hiddenMay 26, 2026

    A Nonresidential New Structure Low Voltage Only Project Involving (2800 Telecommunications System)

  8. Electrical No Plan ReviewIssuedProject value hiddenMay 26, 2026

    A Nonresidential New Structure Low Voltage Only Project Involving (2960 Telecommunications System)

  9. Electrical No Plan ReviewIssuedProject value hiddenMay 26, 2026

    A Nonresidential New Structure Low Voltage Only Project Involving (202 Telecommunications System)

  10. Electrical No Plan ReviewIssuedProject value hiddenMay 26, 2026

    A Nonresidential New Structure Low Voltage Only Project Involving (3250 Telecommunications System)

  11. Electrical No Plan ReviewIssuedProject value hiddenMay 26, 2026

    A Nonresidential New Structure Low Voltage Only Project Involving (90 Telecommunications System), 718973 SEA105

  12. Electrical No Plan ReviewIssuedProject value hiddenMay 14, 2026

    A Nonresidential Alteration to Existing Structure Electrical Project Involving (58 Temporary Service)

  13. Electrical No Plan ReviewIssuedProject value hiddenApr 29, 2026

    A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (1 Security System)

  14. Electrical No Plan ReviewIssuedProject value hiddenApr 13, 2026

    A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (87 T-Stat or HVAC Controls)

  15. Electrical No Plan ReviewIssuedProject value hiddenMar 24, 2026

    A Nonresidential Addition to Existing Structure Low Voltage Only Project Involving (6 Control Wire)

  16. Mechanical No Plan ReviewIssuedProject value hiddenMar 24, 2026

    A Nonresidential Alteration to Existing Structure None Project Involving (1 Hydronic Piping Only)

  17. Mechanical No Plan ReviewIssuedProject value hiddenFeb 16, 2026

    A Nonresidential Alteration to Existing Structure None Project Involving (2 Hydronic Piping Only)

  18. Electrical No Plan ReviewIssuedProject value hiddenNov 7, 2025

    A Nonresidential Repair or Replacement Low Voltage Only Project Involving (1 Security System)

  19. ROW FranchiseIssuedProject value hiddenOct 20, 2025

    Use of ROW for traffic control On 110th Ave NE between NE 6th ST and NE 8th ST, Access existing Zayo manhole for fiber splicing.

  20. Permanent SignClosedProject value hiddenSep 19, 2025

    Installation of four illuminated signs (two wall mounted, two ceiling mounted) in the garage area., 25 118386 SA

  21. Permanent SignClosedProject value hiddenSep 8, 2025

    Installation of four exterior, illuminated, double-sided parking sign blades.

  22. ROW FranchiseIssuedProject value hiddenJul 9, 2025

    48ct & 24ct Fiber, .625 coax, 544' pulled through existing conduit.

  23. Electrical No Plan ReviewClosedProject value hiddenMay 28, 2025

    A Nonresidential New Structure Electrical Project Involving (2 Generator Load Bank Test), none

  24. Smoke Control SystemIssuedProject value hiddenMay 15, 2025

    Revision to the approved concise smoke control for Center of Energy TI 23 117895 BY. Keith Gordon requires new FH permit., 23 117895 BY

  25. Electrical Plan ReviewClosedProject value hiddenMar 4, 2025

    Installation of PV system on L5 & L45 composing of the following componenets: L5 99.22 kW - (242) Trina 410 Watt Modules, (1) SolarEdge SE80K-US inverter & (121) SolarEdge P960 Opt…

  26. Electrical No Plan ReviewClosedProject value hiddenFeb 7, 2025

    A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (316 Security System)

  27. NoiseClosedProject value hiddenJan 17, 2025

    Continued dismantling and removal of tower crane 2. Scheduled March work., 20 109133 TN

  28. NoiseClosedProject value hiddenJan 15, 2025

    Dismantling and removal of tower crane 2. February scheduled work., 20 109133 TN

  29. Electrical No Plan ReviewClosedProject value hiddenJan 6, 2025

    A Nonresidential Alteration to Existing Structure Electrical Project Involving (6 Temporary Service)

  30. Fixed Fire Suppression SystemsClosedProject value hiddenDec 26, 2024

    Installation of UL300 Captive Aire TANK and CORE kitchen fire suppression system

  31. Land Use ExemptionClosedProject value hiddenDec 10, 2024

    Addition of an interim condition phase to the existing approved design review of Bellevue 600 - Phase 2., 21106968

  32. Electrical No Plan ReviewClosedProject value hiddenDec 4, 2024

    A Nonresidential Alteration to Existing Structure Electrical Project Involving (10 Temporary Service)

  33. Electrical Plan ReviewClosedProject value hiddenNov 22, 2024

    Switch from Temp Power to Permanent power from PSE Transformers

  34. Electrical Fire AlarmIssuedProject value hiddenSep 27, 2024

    TI for floors 2-4, adding Power Supplies and Speaker/Strobes to meet code.

  35. NoiseClosedProject value hiddenSep 10, 2024

    Need additional morning hours to remove tower crane 1 base, 09/30/2024 & 10/01/2024 5:00 AM to 7:00 AM. 20 109133 TN

  36. Fire Service SystemsClosedProject value hiddenAug 29, 2024

    EMERGENCY RESPONDER RADIO COVERAGE SYSTEM FOR NEW TOWER., 20 122442 BB 21 102439 BB

  37. NoiseClosedProject value hiddenAug 28, 2024

    Construction noise application for 9/14-9/15 to complete tower crane 2 climb with trucks utilizing the ROW for loading and intermittent closures between 7am and 6pm, 20 109133 TN

  38. NoiseClosedProject value hiddenAug 26, 2024

    Construction noise application for 9/21-9/22 to complete tower 1 removal with trucks utilizing the ROW for loading and intermittent closures between 7am and 8pm., 20 109133 TN

  39. Electrical No Plan ReviewClosedProject value hiddenAug 19, 2024

    A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (1076 Telecommunications System) *add on 151 UHF Das

  40. NoiseClosedProject value hiddenAug 2, 2024

    Construction noise application for tower crane 1 jump on 8/17 and 8/18 with intermittent closures in the ROW., 20 109133 TN

  41. Land Use ExemptionClosedProject value hiddenJul 16, 2024

    Construction of two office towers with garage and retail functions., 20 101468 LP

  42. Land Use ExemptionClosedProject value hiddenJul 16, 2024

    Addition of an interim condition phase to the existing approved design review of Bellevue 600 - Phase 2., 21106968

  43. NoiseClosedProject value hiddenJun 27, 2024

    Construction noise exemption to perform our TC2 crane climb on 6/29/24 and 6/30/24., 20 109133 TN

  44. Electrical No Plan ReviewClosedProject value hiddenJun 17, 2024

    A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (1625 Security System)

  45. Mechanical Plan ReviewIssuedProject value hiddenJun 13, 2024

    Installation of (4) water cooled condensing units, 23 117895 BY

  46. NoiseClosedProject value hiddenMay 20, 2024

    Construction noise application for tower crane 1 climb scheduled for 6/1 and 6/2., 20 109133 TN

  47. ROW FranchiseClosedProject value hiddenMay 13, 2024

    ext for final 5/20/25 kb. JUT - Project: B-600 Phase 2. TRENCH FROM J1 TO SWITCH VAULTS ON PRIVATE PROPERTY. TRENCHING ACROSS 110TH AVE NE FROM SWITCH VAULTS TO INTERCEPT POINTS IP…

  48. Fire Sprinkler SystemsIssuedProject value hiddenMay 6, 2024

    2nd Partial sprinkler permit application for above-ground fully sprinklered office tower. 1 retail floor, 3 floors of Center of Energy (COE) Amenities, 39 shell office floors and o…

  49. Land Use ExemptionClosedProject value hiddenApr 8, 2024

    upgrade retail storefront at two locations

  50. NoiseClosedProject value hiddenApr 1, 2024

    Construction noise permit application to jump tower crane 2 over the weekend of 4/20 and 4/21., 20 109133 TN

  51. Mechanical Plan ReviewClosedProject value hiddenMar 20, 2024

    We are hanging 5 CaptiveAire Class1 exhaust hoods. We are setting in place 17 pieces of cooking equipment under the 5 hoods. We are not responsible for any mechanical or electrical…

  52. Electrical No Plan ReviewClosedProject value hiddenMar 8, 2024

    A Nonresidential Repair or Replacement Electrical Project Involving (2 Heat Trace)

  53. Plumbing Plan ReviewClosedProject value hiddenFeb 12, 2024

    Plumbing work for new initial build-out of levels P1 through level 4., 23 117895 BY

  54. Electrical Plan ReviewIssuedProject value hiddenFeb 2, 2024

    Lighting and Electrical for the COE, which entails a kitchen on P1 and build out of levels 1-4 on the first phase of the Bellevue 600 tower., 20 123106 BG

  55. NoiseClosedProject value hiddenJan 30, 2024

    Noise Variance to mobilize a 550ton mobile crane on 110th Ave NE near the intersection of NE 6th St to remove our tower crane 3 base. This mobile crane will take 5 hours to setup,…

  56. NoiseClosedProject value hiddenJan 24, 2024

    Noise variance for Tower Crane jumps and Tower Crane 3 dismantle., 20 120612 TN

  57. Tenant Improvement - New UseIssuedProject value hiddenJan 17, 2024

    Project consists of TI of four amenity entry floors to corporate office building. Total square footage of 96,511. Floors P1 and 1 through 4.

  58. Mechanical Plan ReviewIssuedProject value hiddenDec 19, 2023

    Mechanical work for new initial build-out of levels P1 through level 4. Includes kitchen areas, walk-in coolers, 23 117895 BY, 21-102504 BL, 24-103340 BL

  59. ROW Street UseClosedProject value hiddenDec 15, 2023

    Delivering a deck, 601

  60. NoiseClosedProject value hiddenNov 27, 2023

    Noise variance for tower crane jumps on 12/9 -10 for tower crane #1 and 12/16-17 for tower crane #2.

  61. Electrical No Plan ReviewClosedProject value hiddenOct 17, 2023

    A Nonresidential Repair or Replacement Electrical Project Involving (4 Heat Trace)

  62. Electrical No Plan ReviewClosedProject value hiddenOct 17, 2023

    A Nonresidential Repair or Replacement Electrical Project Involving (15 Heat Trace)

  63. Electrical No Plan ReviewClosedProject value hiddenOct 17, 2023

    A Nonresidential Repair or Replacement Electrical Project Involving (5 Heat Trace)

  64. Electrical No Plan ReviewClosedProject value hiddenOct 10, 2023

    A Nonresidential New Structure Low Voltage Only Project Involving (400 Energy Management, 6 T-Stat or HVAC Controls)

  65. NoiseClosedProject value hiddenJul 3, 2023

    noise variance to jump Tower Crane 1 and Tower Crane 2 on the dates listed below. TC#1: 7/22/23, 7/23/23, 7/29/23, 10/7/23, 10/8/23. TC#2: 8/5/23, 8/6/23, 8/12/23, 10/7/23, 10/8/23…

  66. Fire Sprinkler SystemsIssuedProject value hiddenJun 12, 2023

    Fire Sprinklers, standpipes, and fire pumps partial submittal for below-grade parking garage. Tower to be future submittal., 20 122442 BB

  67. ROW FranchiseClosedProject value hiddenJun 9, 2023

    Lumen to place conduit at the intersection of 110th Ave. NE & NE 6th St. as approved JUT Permit # 20 122373 GD. All work will be behind the construction fence.

  68. NoiseClosedProject value hiddenMay 15, 2023

    Safely jump tower crane #1 to increase the height., 20 122442 BB 6/10/2023 - 6/11/2023 7am - 6pm

  69. ROW FranchiseClosedProject value hiddenOct 7, 2022

    Extended it until 7/23/2025 for final inspection only ext 7/25/24 kb. EXT 2/29/24 KB. No more extension MW "See email. EXT 7/27/23 KB.. EXT 2/3/23 KB. Open structures for conduit v…

  70. Plumbing Plan ReviewClosedProject value hiddenSep 6, 2022

    Temporary installation of plumbing fixtures during construction of the building.

  71. Plumbing Plan ReviewClosedProject value hiddenAug 12, 2022

    Plumbing package for 43 story/Penthouse new highrise tower located at 600 108th Ave NE.

  72. NoiseClosedProject value hiddenAug 3, 2022

    Noise Variance Application to place the B600 Mat Footing. Sept 10, 2022 2am - 10pm

  73. NoiseClosedProject value hiddenJun 27, 2022

    A Barnhart Mobile AT Crane will be staged to the East of the project on 110th Ave NE (See attached Site Plan). On the morning of Saturday 7/09/22, crews from Northwest Tower Crane,…

  74. NoiseClosedProject value hiddenJun 14, 2022

    Noise Variance request to erect tower crane 1 on site. June 18, 2022 7am-8pm. June 19, 2022 7am-8pm.

  75. NoiseClosedProject value hiddenMay 9, 2022

    Noise variance for expanded hours to set up mobile crane, safely erect tower crane, and break down mobile crane (crane 2). Proposed dates are 6-4-22 and 6-5-22.

  76. Water ServiceClosedProject value hiddenApr 29, 2022

    2" Water Meter in the ROW. As part of B600 Ph1, 20 122422BB

  77. Electrical Fire AlarmIssuedProject value hiddenApr 21, 2022

    Shell and Core networked addressable EST3 Fire alarm system with smoke control equipment monitoring, voice evacuation, sprinkler monitoring, emergency control interface with elevat…

  78. ROW FranchiseClosedProject value hiddenFeb 24, 2022

    Ziply to access MH UNK and trench approx. 106' from MH UNK to new 466MH and then on to private property. All other work and vault access has already been completed through other pe…

  79. Major Commercial ProjectIssuedProject value hiddenFeb 24, 2022

    Above grade tower for new project located at 600 108th Ave NE

  80. ROW FranchiseClosedProject value hiddenJan 6, 2022

    Post Revision # 2: Revised Traffic Control Plans. Post Revision # 1: Revised the conduit counts on page 5 has changed on notes 1 and 2 to contain (5) instead of (4) conduits. Addit…

  81. ROW Street UseClosedProject value hiddenJan 6, 2022

    Deliver and setup mobile office units on the job site., Bellevue 600

  82. Mechanical Plan ReviewIssuedProject value hiddenDec 21, 2021

    Mechanical for new building (garage & tower). TBP

  83. Side Sewer ConnectionClosedProject value hiddenDec 9, 2021

    Connect one (1) 8" PVC side sewer lateral from the street to the building., 20 122422BB

  84. Major Commercial ProjectIssuedProject value hiddenDec 2, 2021

    Phase 1 building permit foundations and structures to grade.

  85. Clearing & GradingIssuedProject value hiddenNov 4, 2021

    Clear and grade permit for final grading to ROW frontage and street improvements.

  86. ROW FranchiseClosedProject value hiddenNov 1, 2021

    ext 12/11/24 kb. ext 5/2/24 kb. ext for 6 mos to schedule customer - kb. Post Revision # 6: Revised Plans & Clear and Grade Permit attached. Revised scope - adding a new pull vault…

  87. NoiseClosedProject value hiddenOct 27, 2021

    Potelco Line crew will be cutting over existing underground system to the new underground system that is required for the relocation of multiple PSE facilities for new construction…

  88. Fire Service SystemsClosedProject value hiddenOct 13, 2021

    Installation of FARS throughout the building. 170-001

  89. ROW FranchiseClosedProject value hiddenSep 14, 2021

    5506799_Access MH's to place microduct in existing Zayo conduit

  90. Electrical Plan ReviewIssuedProject value hiddenSep 14, 2021

    CEC Job# 517330 Shell Core Electrical for Phase 1

  91. Plumbing Plan ReviewClosedProject value hiddenSep 9, 2021

    Office tower with below-grade plumbing. 204080-001. Only for work below garage P6 slab (underground piping)

  92. DemolitionClosedProject value hiddenJul 6, 2021

    Demolition of interior tenant improvements on levels 1 through 10.

  93. Shoring PermitClosedProject value hiddenMay 17, 2021

    Shoring for future development located at 600 108th Ave NE.

  94. Electrical Plan ReviewClosedProject value hiddenApr 19, 2021

    We are installing an exterior 600AMP fused disconnect to refeed the building/

  95. Smoke Control SystemIssuedProject value hiddenApr 7, 2021

    Conceptual Smoke Control Design for Bellevue 600 - 19 131761 LD
Bellevue 600 - Phase One features a new office tower, meeting center, commons space, and retail uses at the…

  96. Side Sewer ConnectionClosedProject value hiddenMar 1, 2021

    1 8"x2" water tie in, 2 8x8 water tie in, 1 tie in to existing CB, 1 Connect to Existing SSM, 1 - 8" FDC, 2 - Fire hydrant assembly 2 - Connect to existing SDMH, 1 12" pvc storm co…

  97. Utility ExtensionsIssuedProject value hiddenMar 1, 2021

    Utility extension work related to a future development.

  98. Underground Sprinkler MainsClosedProject value hiddenFeb 20, 2021

    Underground main service connections to the building. There are two connections (one on 6th and one on 110th)

  99. Clearing & GradingIssuedProject value hiddenFeb 12, 2021

    Clear and Grade for early works (utility relocation) for future development.

  100. Electrical Plan ReviewClosedProject value hiddenFeb 1, 2021

    CEC JOB# 517122- BELLEVUE 600 PHASE 1 TEMPORARY POWER

  101. ROW Commercial DevelopmentIssuedProject value hiddenJun 12, 2020

    Post Revision # 38: 24-hour lane shift on the east side of 110th Ave. NE between NE 6th St. and NE 8th St. For tree removal including tree stumps, demolishing the existing sidewalk…

Development activity near 633 110TH Ave NE

40 mapped permits within 500 m, shown on the intelligence map above.

Browse recent permits near this address

633 110TH Ave NE in the Bellevue permit market

This address has 101 permit records in PropertyLabs' public history and is located in Downtown. The city figures below provide context without changing the focus of this exact-address record.

Explore Bellevue building permits
City address-linked rows
355,604
City, trailing 90 days
2,342
City, trailing 30 days
746

City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 20, 2026.

Permit questions about 633 110TH Ave NE

Are there building permits at this address?
633 110TH Ave NE has 101 municipal building permits on record, with the latest activity dated Jul 14, 2026.
What construction activity is nearby?
40 mapped permits were found within 500 m of 633 110TH Ave NE.
What is the declared permit value?
Permits recorded at 633 110TH Ave NE represent $372M in total declared construction value.

About this address record

PropertyLabs compiled this permit history from municipal public records for Bellevue, WA. The latest recorded permit activity at 633 110TH Ave NE is dated Jul 14, 2026. Municipal records can be corrected or updated after publication.

Sources and data notes

Contractors and applicants associated with these permits

See the contractors, applicants, permit holders, permit numbers, and project documents associated with 633 110TH Ave NE in the PropertyLabs platform, along with alerts when new permits are filed at this address.