Building permit intelligence · Boston, MA
700 Columbus Av has 40 municipal building permits on file in Ward 9. The latest recorded activity was a extren permit dated Jul 21, 2026. Permits at this address represent $100K–$500K in total declared construction value. PropertyLabs also identified 5 mapped permits within 2 km of this address.
Renovations - Exterior
Electrical
Fire Alarm
Fire Alarm
Fire Alarm
Renovations - Interior NSC
5 mapped permits within 2 km, shown on the intelligence map above.
12 other addresses on Columbus Av with municipal permit records in Boston.
This address has 40 permit records in PropertyLabs' public history and is located in Ward 9. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 700 Columbus Av is dated Jul 21, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 700 Columbus Av in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Renovations - Interior NSC
Low Voltage
Low Voltage
Electrical
Electrical
Fire Alarm
Fire Alarm
Fire Alarm
Renovations - Exterior
Renovations - Exterior
Renovations - Exterior
Renovations - Exterior
Renovations - Exterior
Other
Other
Plumbing
Gas
NFPA-70B EPM compliant Eversource Pad Mount Transformer Re-Energize Inspection
Low Voltage
Interior/Exterior Work
Electrical
Install 4 receptacles. Relocate other wiring
Install 4 V/D locations.
1st Floor renovation to existing proctor station. New millwork, paint, and carpet. No FA, or Sprinkler work. No egress change.
Install New Street Light/ cell Node
Install conduit & wiring for new Verizon Street Light pole with pole top antenna at the intersection of Columbus Ave and Davenport St. Install new handhole in the street. Wire ligh…
Replacement of hot water boilers
Replacement of hot water boilers.
Relocate 3 existing locations
Install lighting and outlets per plan. North Davenport A
Install new carpet/flooring, paint, and furniture in 3 ea. rooms at Northeastern Davenport A.
Erect (2) 30x45, (7)10x10, (45)9x10, (16)9x20, (3)14x14 and 12x12 tents beginning on 9/23/16. Removal on 9/24/16. Event is Beantown Jazz Festival.
erect temporary performance stage "Berklee Beantown Jazz Fest 2014" 9/26 - 9/27 33' x 20' mobile stage with roof 8' x 12' FOH platform
Install 3-10x20 tents, 1-20x20 tent, 1- 16x20 stage, and 1- 20x20 stage, 1-20x33 mobile stage, 1- 16x24 mobile stage. On 9/27-28 on Columbus Ave between Burke and Mass Ave
Electrical Low Voltage · LVOLT · Jul 20, 2026