Building permit intelligence · Minneapolis, MN
708 1ST St N has 42 municipal building permits on file in North Loop. The latest recorded activity was a plumbing permit dated Jun 10, 2026. Permits at this address represent $1MM–$5MM in total declared construction value. PropertyLabs also identified 1 mapped permit within 500 m of this address.
installing dishwasher and existing piping
Replace one natural gas water heater with new ASME rated 100 gallon, 270,000 BTU water heater
ComMin
ComMin
#241 replace dishwasher
Replacing existing heat pump unit.
1 mapped permit within 500 m, shown on the intelligence map above.
1 other address on 1ST St N with municipal permit records in Minneapolis.
This address has 42 permit records in PropertyLabs' public history and is located in North Loop. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 29, 2026.
PropertyLabs compiled this permit history from municipal public records for Minneapolis, MN. The latest recorded permit activity at 708 1ST St N is dated Jun 10, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 708 1ST St N in the PropertyLabs platform, along with alerts when new permits are filed at this address.
gas dryer #423
Replace A/C
replace dishwasher unit 421
Replace water heater
Replace A/C and air handler
New duct systems per plans. Suite 131 BLDG1064040
Suite 131/ kitchen sink. Add ice maker dishwasher
Refresh space for new tenant on main floor of building. certificate of occupancy required: no special inspections required: no const type: 2-B occupancy: B 2020 MSBC occupant load:…
Remove/Replace Deck Boards on 39 Balconies special inspections required: no occupancy: R-2 2020 MSBC windows with sill heights less than 36 inches above the floor shall be equipped…
REMODEL PLUMBING FOR TOILET AND SHOWER IN MASTER BATH
Install (2) 30 x 72 sump basins, (2) Effluent pumps for storm water/drain tile, (1) Sewage pump, (1) 4 floor drain, and Drain tile w/sock. Install all necessary sanitary waste,…
BATHROOM REMODEL IN CONDO UNIT #314. NO ALTERATIONS TO EXISTING FLOOR/CEILING OR WALL SEPARATIONS. DEMO EXISTING WC, SHOWER, AND TUB FIXTURES; RECONFIGURE EXISTING RAISED FLOOR ARE…
Replace gas dryer - unit 313
HPC - #511, A/C, REPLACE AC ONLY
HPC - #632 / REPLACE AC ONLY
HPC - #513, A/C, REPLACE AC ONLY
HPC - #524, A/C, REPLACE AC ONLY
HPC - #512, A/C, REPLACE AC ONLY
HPC - UNIT 312 - REPLACE AC ONLY
(DMH - ProjectDox) RECONSTRUCT 4 ROOFTOP DECKS TO CONDO UNITS 514, 524, 638, and 642 IN SAME LOCATIONS PER ENGINEER DRAWING FROM BEN SANDVIG, #53975 (ENCOMPASS) APPROVED PLANS AND…
Replacing existing air handling unit and condenser.
Replacing Split System
REPLACE MUA WITH LIKE FOR LIKE
NEW CONSTRUCTION PLUMBING MENS/WOMANS ROOM, DRINKING FOUNTAIN, KITCHEN
TENANT IMPROVEMENT SUITE 333. certificate of occupancy required: no ***** special inspections required: no***** const type: IV ***occupancy: B ***2015 MSBC***** occupant load: 69 *…
Tear off all materials to deck Install new isocyanurate roof insulation New 90 mil fully adhered EPDM roofing system complete with new flashing and trim. remove existing rooftop de…
CONCRETE REPAIR AND WATERPROOFING. ENGINEER = ENCOMPASS. BEN SANDVIG #53975 (JJL)
GAS RANGE #312
REMOVE AND REPLACE EXISTING LAMINATED WOOD FLOORING WITH NEW LAMINATED WOOD FLOORING IN UNIT # 221 OF EXISING CONDOMINUM MIXED-USED BUILDING. AAJ#2 SOUND MAT SPECIFICATIONS: STC RA…
Remove and replace insulation, tapered insul, 60 mil EPDM
OFFICE BUILDOUT (MAA #02) certificate of occupancy required NO mechanical plans required for certificate of occupancy mechanical plans/letter of means of compliance submitted\ spec…
dryer UNIT # 632
Tenant build-out Means of egress doors shall be readily distinguishable from the adjacent construction and finishes such that the doors are easily recognizable as doors. Mirrors or…
2nd floor breakroom sink and elec water heater
Add 22 apartment units in existing building; replace existing water heaters
SUITE 242 VENTILATION WORKADD DIFFUSERSAND TRANSFERS TO NEW OFFICES BEING BUILT IN EXISTING FINISHED SPACE SUITE 242 VENTILATION WORK - ADD DIFFUSERSAND TRANSFERS TO NEW OFFICES BE…