Building permit intelligence · Boston, MA
72 E Concord St has 211 municipal building permits on file in Ward 8. The latest recorded activity was a intren permit dated Jul 24, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 1 mapped permit within 2 km of this address.
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Electrical
Electrical
Fire Alarm
1 mapped permit within 2 km, shown on the intelligence map above.
5 other addresses on E Concord St with municipal permit records in Boston.
This address has 211 permit records in PropertyLabs' public history and is located in Ward 8. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 72 E Concord St is dated Jul 24, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 72 E Concord St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Fire Alarm
Fire Alarm
Electrical
Electrical
Plumbing
Plumbing
Electrical
Electrical
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Electrical
Electrical
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Electrical
Electrical
Electrical
Electrical
Rework existing lighting circuits throughout the building to emergency panels. BUMC479X
Electrical
Electrical
Low Voltage
Renovations - Interior NSC
Electrical
Electrical
Per conversations with ISD and BFD amendment is being pulled for ALT 1618261 building permit to clarify building separations (separation will be maintained for sprinkler and FA sys…
Fire Alarm
Low Voltage
Low Voltage
Low Voltage
Plumbing
Demolition of existing lab spaces and installing new finishes and MEP's. This entire space will be used as a simulation lab.
Electrical Work Associated With Tenant Fitout on the 6th Floor. Installation of New Light Fixtures, Lighting Controls & Receptacles throughout.
Fire Alarm
Reworking existing circuitry for new layout of existing lab equipment.
Renovations - Interior NSC
Demolition - Interior
Electrical
Other
Low Voltage
Electrical
Renovations to Room 505 on the 5th floor of R Building. Demo existing casework, drywall wall. Install new door in existing wall, build new soffit, replace Acoustical Ceiling, patch…
Class Rooms And LabsCertificate For Class Rooms At Room 405 (AKA 778 Harrison Ave. )ALT1268802 Issued December 20, 2021
Classrooms, Labs;Certificate;For;Med Labs 9th FloorALT1163931 Issued 3/31/2021, SF1163932 Issued 3/1/2021
Fire Alarm
Fire Alarm
Low Voltage
Electrical
Plumbing
Low voltage cabling install, programming and configuration of Audiovisual equipment in classroom.
Room L-102- Remove drywall at closet area, flooring, ceilings, lights. Install new ceiling, HVAC, Lighting, electrical outlets, millwork, sink and appliances. Install new glazed en…
Select Demo In [2] Rooms in the Basement of the Building
interior renovation Team Base Learning Center
Intreior renovation
Installation of 40 data locations on 4th floor L building
Demo of existing labs. Installation of 6 new bathrooms.
Interior renovation of existing classroom space on 4th floor. Work includes selective demolition, millwork, insulation, fire stopping, doors, new interior partitions, painting, flo…
Demo of gas to lab benches. Demo only.
Interior selective demolition only of existing non load bearing walls, flooring, acoustical ceilings, casework, and furnishings. per alt1268802
Office renovation
Interior renovation of 3 existing offices to include new partitions, flooring, painting, acoustical ceilings, doors, window shades, and lights.no structural work ,sprinkler or fire…
Installation of card access and camera devices for security purposes on the 10th floor.
Running low voltage wiring for audio/visual components.
Replace Lighting, Add Outlets ,Wire AC
Installation of 10 data outlets on 10th floor
R Building 780 Harrison St relocate 3 devices add 1
additions and alterations to existing system
72 East Concord St. BUMC - L10 Gross Anatomy Lab. Misc. Low Voltage HVAC Control Wiring - A.P - 219453
Install power and lights for new laser testing room
Interior lab renovation for BU Medical at Houseman Medical Research Center (778 Harrison Ave.), 9th Floor. Selective demolition, removal and replacement of interior finishes, fixtu…
Renovations to existing space with lighting and controls. (actual address 778 Harrison Ave Boston, MA)
*Demolition and layout only for pending permit ALT1163931* Interior lab renovation for BU Medical at Houseman Medical Research Center (778 Harrison Ave.), 9th Floor. Selective demo…
Lab renovation project on the 10th floor. The job entails cosmetic upgrades including flooring, painting, replacement of ceiling tiles, building new closets/shelving, replacing HVA…
Interior Renovations to Room 822/824. The Work will Include Electrical, HVAC, Plumbing, and Painting.
Interior fit out of two rooms for lab space. Work includes installing new door, patching existing drywall and flooring, installing ACT ceilings, painting, process water piping for…
remodel ,lights and outlets
install emergency eyewash station with shower and mixing valve for tempered water.
Disconnect and Reconnect ATM Santander Bank 72 East Concord St Boston University Student Center Lower Level Boston, MA 02118 (8-54897-08)
Installation of 20 data outlets
DISCONNECT GAS METER AND PIPING
internal office renovation
Renovation of office space located in rooms 912 and 913 on the 9th floor. Work includes selective demolition, three new doors, painting, flooring, window shades, HVAC, and electric…
Classrooms and Labs Certificate;For: Offices - 5th floor Alt846297 - 8/16/18 ;
Gas connection for replacement roof top unit
installation of card access devices for security purposes
installation of card access devices for security purposes
Classrooms, Labs Certificate for (6) Study Rooms, (2) Multi use Bath Rooms/ADA &;;connecting Stairwell between the12th and 13th floors - Only ALT857490 issued: 9/7/18
Installation of 6 data outlet locations
Install low voltage control wiring on L5 & L13 for Siemens building technology for HVAC equipment
Disconnect, remove, dispose and cap one kitchenette sink. Install rough sanitary waste/vent and hot/cold water piping from nearest available existing to; (1) floor drain with trap…
Internal renovation for student lounge
Select demolition of the existing 14th floor lounge and kitchenette. Construct new walls, floors, ceilings, toilet fixtures, power and lighting lights to create new rest room, serv…
5th floor remodal
Renovations to the 13th floor BU Medical learning center
BUMC - Housman Bldg -; Architectural upgrades to separate L Building from R building and upgrade R Building Fire Alarm System as agreed to;with the Boston Fire Department.; Work wi…
75 VOICE / DATA LOCATIONS
Select Demo of Counter, Cabinets and Desks. Supply and Install New Kitchen. New Ceiling Grid. New Lighting, Outlets and Tel/Data. New Flooring, Painting.
Renovation of the 13th floor BU Medical Learning Center
Renovation to 5th floor
BUMC L13 Library Add new Modules for temp heats
New core restroom in classroom building
Cosmetic renovation of the interior, consisting of (6) study rooms, (2) multi use bath rooms ADA, (1) single us gender neutral ADA and re-working the communicating stairwell betwee…
Renovate the 5th floor of L Building. Complete demolition of existing walls and finishes. Select demolition of Mechanical and Electrical Systems. Build new walls per new floor plan…
INSTALLATION OF 10 VOICE/DATA LOCATIONS
Select demolition of walls, floor and ceilings. Build new walls and install new finishes: doors, flooring, acoustical ceilings and paint. Upgrade lighting.
Installation of temporary heat detectors and associated wiring for the demo of walls and ceilings. Existing fire alarm devices will be removed except for elevator recall smokes, pu…
Replacing the fire detection and signaling system.
Relocate and replace with New #68 Sprinkler heads for new Tenant fit out. Add #8 new upright Sprinkler heads in areas w/o ceilings
Install 3 lab sinks- 2 water closets- 2 lavs - 3 emergency eyewash/shower - 1 lounge sink - 1 drinking fountain - 1 mop sink
Installing 2 gas turrets
Labs &; Classrooms Certificate for Offices (7th Floor). Alt625013 issued 9/22/2016 ;
BUMC L&R Bldg - 7th Fl Renovation, Misc. Low Voltage HVAC Control Wiring - AP, 163969
BUMC Building 4 FCUs, Misc. Low Voltage HVAC Control Wiring - AP, 163792
Plumbing renovation
Rework existing system on the 7th floor to install new pull stations, smoke detectors and audio/visual devices per drawings
Rework existing power on the 7th floor to install two new power panels, receptacle outlets and lighting per drawings
IInstall two cat6 cables to each location shown on the drawings. Terminate at desk location and headend
Interior renovation of existing lab and office space including interior finishes and new MEP systems.
REPLACE EXISTING SMOKE DETECTORS TO HEAT DETECTORS ON THE 7TH FLOOR IN THE CONSTRUCTION AREA ONLY.
PERFORM MAKE SAFE AND DEMO OF THE ELECTRICAL BRANCH CUITS AND LIGHTING. INSTALL TEMP LIGHTING AND TEMP DUPLEX RECEPTACLES.
Excavate area for bike racks, removing curb and removal of (2) parking spaces for bike rack
Make safe demolition of piping and fixtures on the 7th floor.
Interior demolition of existing partitions, flooring, finishes and MEP equipment.
Audio visual installion of Speaker wire and Cat5 cables.
low voltage wiring of 10 voice/data locations
Demo existing walls, construct new walls. Install new lighting & power. Install new V/D. Install new HVAC. Install new flooring. Install new doors. Paint Turn down 3 sprinkler head…
relocate kitchenette and drain and vent
install new receptacles in 2 office space BU - L-10th Fl install new receptacles on kitchenitte new lighting circuit / OCC motions
Demo existing walls, build new walls to create new office space, install stick on drywall over block walls, replace existing ceilings, install new lighting, rework existing electri…
Remove existing roofing and install new adhered Sarnafil roof system over new insulation on flat roof that is not visible from the street -
The Applicant proposes to install a Head End Facility for its proposed Distributed Antenna System (DAS) Network pursuant to the plans provided herein. The current, proposed, initia…
Legal Occupancy:; Classrooms, Labs ALT17027/2011 COO for BU Medical Campus - 11th Floor - Testing Center ALT351704, Issued: 5/6/14
Added 4 smoke detectors and rearranged a few horn strobes.
8 LV Data Drops
Install 27 data cables
Renovation of the electrical power, lighting and communication system of the 11th floor library - changing library to a test lab.
This is actually for BMC @ 88 East Concord Street, Boston. System says address NOT FOUND??? Add Sink
BU Medical Campus - 11th Floor - Testing Center -; Removal of ceilings and carpet. Reinstall ceilings, carpet, vinyl flooring,;and glass walls.; Reinstallation of all existing Life…
**Filtered Water Cooler**
Legal Occupancy:; Classrooms, Labs doc#alt246010 COO for the BU Medical Center/Housman Medical Research Center Second Floor;Lab ALT286862, Issued: 9/26/13
**Filtered Water Cooler**
Low Voltage HVAC Control Wiring ~ BUMC R-10 Job #13-0911 (PAG)
3 data locations
new wiring in 2 office space , demo all old electrical
NEW LIGHTING CIRCUIT WIRING, INSTALL LUTRON LIGHTING SYSTEM , FEED FOR POWER FURNITURE, INSTALL 30 REC. LGHT, POWER FOR PROJECTOR SCREEN DEMO ALL OLD WIRING
Room 112 -Demolition of walls &; seating. Construction of new walls, rebuild existing platforms to accept new furniture. Installation of sheetrock over block walls &; existing ceil…
Selected demolition, Electrical and FA Renovation of a 600sq ft space on the second floor at Boston University.
Adding a fume hood.
Adding a hand sink an Emergency Eyewash and Add two floor drains
22 voice and data outlets.
Minor demolition of existing masonry and drywall partition installation of new drywall, HM frame, door and harware - paint cooridor side of new partition
low voltage voice/data
INSTALL 15 RECEPT. & 17 LIGHT FIXTURES ON R5-BLD
R Building room 811. Construct new walls. Install new ceilings, lighting, receptacles, V/D, flooring & doors. New controls for HVAC & add new duct work. Paint space.
R building 5th floor. Demo walls Construct new walls. Install lighting, doors, flooring, ceilings, & receptacles. Install new plaster traps. Demo old sink. Install new HVAC control…
Minor demolition of non load bearing block walls and drywall partitions, new metal stud and gyp partitions,new act ceiling,new wood doors and metal frames and new fire doors in the…
To fur out the existing block wall in the elevator lobby with metal stud and gyp board, infill existing door opening with metal stud and gyp board, install fire rated doors in the…
Install a sink in the 3rd floor
BU Medical Center - Housman Medical Research Center - cGMP Lab - 2nd Floor -; Demo of existing lab, fit out with new doors, millwork, finish carpentry,;floors, walls and ceiling.;…
NEW WIRING IN 3 OFFICE SPACE RM 518, DEMO ELECTRICAL NEW LIGHTING CIRCUITS, LIGHT FIXTURES AND OCC MOTION DETECTORS
12 voice/data locations
Demolition of walls to create new office space. Installation of new flooring, ceilings, walls lighting, doors, & diffusers. Paint space. Rework V/D & existing electrical
Remove existing sink, reinstall new sink in same existing spot
Demolition of existing non bearing interior partitions, Act ceilings and carpeting. New drywall partitions (58lf), new act ceiling, new lighting and new vinyl plank flooring and ca…
to increase the level of occupancy on the 11th floor from 160 persons to 243 to increase the level of occupancy on the 12th floor from 150 persons to 224 to increase the level of o…
Intstalling single bay sink and emergency eyewash and combo with mixing valve
DEMO EXISTING SWITCHING, LIGHTING, & GENERAL PURPOSE ELECTRICAL FEEDS AS NEEDED. INSTALL NEW: 4 ROWS OF PENDANT LIGHTING. NEW 3 WAY SWITCH AT EXISTING DOOR. RELOCATE EXISTING FUME…
Interior renovations of space including plumbing of one sink, electrical/lighting, HVAC and finishes including VCT flooring and painting.
Remove and replace interior non structural walls, sprinl;er relocate and device fa,replace ceiling, lighting, carpet, paint, hvac and kitchenette, cost reflected on SF156269
Relocate 31 sprinkler heads to accomodate new office layout at BU L3 Annex 3rd floor per standards of NFPA and Boston Fire.
voice/data wiring
Plumbing for new sink, sump pump and water supply to coffee equip.
voice and data drops
309 Suite renovation
disconnect old voice/ data lines relocate coax cable line to new location install 2 data/ sets
INSTALL NEW LIGHTING DEMO ALL OLD RECEPTACLES, RELOCATE LIGHTING SWITCHES TO NEW LOCATION
Basement renovations. Demo walls, construct new walls, install new flooring, ceilings, & lighting. Paint
Remove and replace interior non-structural office partitions, replace ceiling, lighting, carpet, paint and HVAC. Replace existing kitchenette- plumbing.
Sediment Carbon Water Filtration System
installing 7 gas deck mounted turrets
installing 5 lab sinks with hot and cold water vacuum and air lines,installing 1 kitchen sink, 1 tissue culture hood with cold water and vacuum line, 1 fume hood with cold water,an…
INSTALL NEW RECEPTACLES IN 2 - LABS ON 9-TH FL. INSTALL NEW LIGHTING
RELOCATE EXISTING VOICE / DATA LINES
Renovations of existing lab space 9th floor. Demo existing walls. Construct new walls. Re-work electrical, HVAC, & plumbing. New doors, ceilings, flooring, casework, & lighting. Pa…
Replace 100' of 6" sanitary piping and 100' of 8" storm piping in crawl space.
installing new hot and cold water lines waste and vent for kitchen starter set.
Telcom work 10 voice/data locations
NEW WIRING IN 4 OFFICE SPACE NEW WIRING FOR 4 GFCI IN KITCHEN REPLACE FIXTURES ON HALLWAY
Demo existing walls, floors, ceilings. Construct new walls for new layout. Install new ceilings, floorig, doors, lighting. Install kitchenette. Replace existing windows with new is…
Classrooms &; Labs C/O-For Lobby , Conference Room, Common Areas and accessory kiosk alt 70727, issued 5/11/11
Classrooms &; Labs C/O-For Lobby , Conference Room, Common Areas-only alt 70727, issued 5/11/11 temporary certificate-expires -10/4/2011-pending completion of permit*
temporary tent install on 08/07/2011 removed on 08/09/2011 for white coat event on 08/08/2011 of:(2) 20x20 frame tent(s), (1) 60x80 pole tent & (1) 30x70 frame tent
Sediment Carbon Filtration system, Hot/Cold Floor Cooler
Install 9 voice and data outlets
Exterior Building inspection and neccessary repairs.
add sink and floor drain
Temporary HC ramp for use during building entrance alteration work. The ramp will be in place for approximately 10 weeks. All cost, contract and debris associated with Alt70727/201…
New power and lighting for renovated lobby with added 200 and 150 panels
Add (2) 120 volt door holders To existing system
Install Security System
Installation of water filtration system Office of Development L219 Kitchen
Renovate the existing lobby of 72 East Concord Street;inside the building and to rework the existing stairs entering the building.