Building permit intelligence · Minneapolis, MN
725 Vineland Pl has 15 municipal building permits on file in Lowry Hill. The latest recorded activity was a mechanical permit dated Jul 8, 2026. Permits at this address represent $1MM–$5MM in total declared construction value. PropertyLabs also identified 3 mapped permits within 500 m of this address.
Disconnect & Remove 2 Columbia steam boilers, Install 2 Hot Water Boilers, Install natural gas burners, supply & returns, gas lines to burners, connect venting to new boilers, conn…
Disconnect and remove three (3) existing Columbia hot water boilers. Provide and install three (2) new Aldrich A3W4-90 hot water boilers. Provide and install three (2) new Riello R…
TEMPORARY TENT AT THE WALKER. TENT AND STAGE TO BE INSTALLED ON 9/10 FOR WALKER AVANT GARDEN AND BE COMPELETLY REMOVED BY 9/25 (JJL)
REPLACE DECKING ON DECK - 'FLATPAK HOUSE' AT WALKER 2020 MSBC
TEMP PLATFORM AND TENT. WALKER ART MUSEUM. SYSTEM IS ANCHORED BY BALLAST AND STAKES. ENGINEER: CHRISTOPHER #55506 EVENT IS 9/21/24 AND SETUP WILL BEGIN 9/12/24
3 mapped permits within 500 m, shown on the intelligence map above.
This address has 15 permit records in PropertyLabs' public history and is located in Lowry Hill. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 28, 2026.
PropertyLabs compiled this permit history from municipal public records for Minneapolis, MN. The latest recorded permit activity at 725 Vineland Pl is dated Jul 8, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 725 Vineland Pl in the PropertyLabs platform, along with alerts when new permits are filed at this address.
GAS FOR EVENT 9/16 - 9/18 2022 - HOOKUP LP TANKS TO PORTABLE COOKING EQUIPMENT TWO 140000 BTU DEEP FRYERS AND TWO 100000 BTU DOUBLE OVENS
ROCK THE GARDEN TEMP STAGES. 2 STAGES, MAIN STAGE AND GARDEN STAGE. ACCESSIBLE ROUTE REQUIRED FOR BOTH STAGES PER SECTION 1108.2.8 OF THE MN ACCESSIBILTY CODE. (JJL) ENGINEER: MCLA…
FOOD-ROCK THE GARDEN-COOKING EQUIPMENT 3 FRYERS @ 50,000 BTUs 5 FRYERS @ 120,000 BTUs 1 CORN ROASTER @ 50,000 BTUs 1 GRIDDLE @ 30,000 BTUs 1 RANGE/COOKTOP @ 50,00 BTUs
setup of temporary wood platform - approx. 20 X 60 and 7 inches high - for use during event to be held in a large tent on site on 9/18/21. sck tent structure covered under fire dep…
TEMP STAGE AND TENT. WALKER ART MUSEUM. SYSTEM IS ANCHORED BY BALLAST AND STAKES. SEE LOGS. (JJL)
TEMP STAGE FOR ROCK THE GARDEN. 2 STAGES. "A" AND "B". ENGINEER: CLARK REDER JEFFREY REDER #56104 (JJL)***************************** STAGE A**************** STAGELINE SL320 WITH WO…
non-structural temp platform 14 inches above grade. Sloped walk is less than 1:20 so no "ramp" elements required
TEMPORARY TENT AND STAGE. CONFIRM ADA RAMP ENTRANCE ON SIDE OF TENT. SIGNAGE DIRECTING ACCESSIBLE ROUTE SHOULD BE POSTED TO RAMP. (JJL) ENGINEER: STORK TWIN CITY TESTING CORP THADD…
TEMP STAGES FOR ROCK THE GARDEN. 2 SEPARATE STAGES CONSISTING OF SEVERAL DIFFERENT SECTIONS OF STAGE. (JJL) ENGINEER: CLARK REDER (DANIEL CLARK PE #48431)
temporary stage setups for weekend music festival. sck#2 engineer: clark