Building permit intelligence · Boston, MA
790 Columbia Rd has 18 municipal building permits on file in Ward 7. The latest recorded activity was a insul permit dated Jun 30, 2026. Permits at this address represent $5MM–$25MM in total declared construction value. PropertyLabs also identified 4 mapped permits within 500 m of this address.
Insulation
Insulation
Renovations - Interior NSC
Renovations - Interior NSC
Electrical
Other
4 mapped permits within 500 m, shown on the intelligence map above.
12 other addresses on Columbia Rd with municipal permit records in Boston.
This address has 18 permit records in PropertyLabs' public history and is located in Ward 7. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 2, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 790 Columbia Rd is dated Jun 30, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 790 Columbia Rd in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Change Occupancy
School COO for School SF470623, issued: 5/11/15 ;
Replace existing devices that were water damaged and retest.
Replace existing light fixtures, receptacles, switches, fire alarm devices and telcom jacks that were water damaged. Re-use existing wiring.
Reinstall fixtures after drywall repair
Repair water damaged building due to a frozen and broken water pipe. The building is a four story structure with an existing footprint totaling 38000 GSF+/- with no additional squa…
Installation of a water closet and lavatory in the ground floor of Pope John Paul II Academy - Columbia campus.
Installed (4) temporary GFI protected power cords for drying equipment
Installation of temporary heat detectors while sprinkler system is impaired.
Burst pipe first floor affecting all floor below with extensive water damage. Request permit to remove plaster, flooring and ceiling tiles affected by water. Dry and clean all affe…
Temporary generator power and electrical distribution to power Air moving equipment belonging to Service Master needed to dry out building after flooding from sprinklers.
Install non-illuminated ground sign per BRA approval 2-14-11. To read: Pope John Paul II Catholic Academy.