800 28TH St E has 200 municipal building permits on file in Midtown Phillips. The latest recorded activity was a mechanical permit dated Jul 21, 2026. Permits at this address represent $67M in total declared construction value. PropertyLabs also identified 3 mapped permits within 500 m of this address.

At this address
200
Nearby (500 m)
3
Latest activity
Jul 21, 2026
Total permitted value
$67M

Permit activity timeline

  1. MechanicalIssuedProject value hiddenJul 21, 2026

    BP #6. Provide and install (2) mini split cooling units, (2) bathroom exhaust fans and misc. duct modifications BLDG1187513

  2. PlumbingIssuedProject value hiddenJul 7, 2026

    Description: BP #6. Provide water, waste and vent tie into existing for install of new bathroom. Fixture count: (1) sink/ Lav (1) toilet Valuation: 63,000.00

  3. CommercialIssuedProject value hiddenJun 15, 2026

    Abbott Northwestern Technology/data closet upgrades on the lower level and 2nd floor. Work includes Rooms TAF 101, TAF 102, TAF 134, I102, TAF 3010 TAF 4M2 TAF 4N2 and TAF 4M103. T…

  4. CommercialIssuedProject value hiddenJun 1, 2026

    remodel data closets with new technology on lower level and 2nd floor. Rooms G309, G458, H2184, PB2004, and PB2004A This work is related to Projects BLDG1143753, BLDG1155448, BLDG1…

  5. MechanicalIssuedProject value hiddenMay 20, 2026

    Installing CHW CRAC unit MW CRAC 203,204,205,206,207,208,209. Installing refrigeration CRAC units TAF DXSS 6M3B/3A per approved plans.

  6. MechanicalIssuedProject value hiddenMay 14, 2026

    I moved the symbol /abbreviation plan sheet M000 to the for-reverence file. (BLDG 1171985 - ProjectDox Prod ) CHW CRAC unit MW CRAC 201/202. 4 a/c, 2 CRAC for level 3 and 4 A/C for…

  7. MechanicalIssuedProject value hiddenApr 28, 2026

    Add CHW CRAC unit to B2, E3079, PB3667, H0229B, CK1843, CK2799, H3117, E87D6. Add refrigeration CRAC unit to PB6600D, W7114E. Add AHU to serve R1 Data rm. Provide and install misce…

  8. PlumbingIssuedProject value hiddenApr 7, 2026

    Waste and vent work at Abbott Northwestern Hospital. This project is for a state licensed health care facility and the plumbing plan review has been completed by the Minnesota Depa…

  9. CommercialIssuedProject value hiddenFeb 24, 2026

    Reroof -ACW certificate of occupancy required no special inspections required no 2020 MSBC

  10. CommercialIssuedProject value hiddenFeb 11, 2026

    Remodel

  11. CommercialIssuedProject value hiddenFeb 3, 2026

    Remodel

  12. MechanicalIssuedProject value hiddenJan 28, 2026

    ComMFDNR

  13. MechanicalIssuedProject value hiddenJan 27, 2026

    ComMFDRR

  14. CommercialIssuedProject value hiddenJan 8, 2026

    Remodel

  15. PlumbingIssuedProject value hiddenJan 6, 2026

    ComMin

  16. PlumbingCancelledProject value hiddenDec 17, 2025
  17. PlumbingClosedProject value hiddenDec 5, 2025

    Install waste stand pipe and RPZ water line for new bone saw. Total job valuation: $20,100.00.

  18. CommercialIssuedProject value hiddenNov 3, 2025

    Update Heart Hospital Data Closets certificate of occupancy required: no special inspections required: no SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CO…

  19. MechanicalIssuedProject value hiddenNov 3, 2025

    Replace existing boilers with new AHU in mechanical room. Remodel MRI-D with added piping, ductwork, accessories and equipment. BLDG1138373 New ducts and piping though out building…

  20. MechanicalIssuedProject value hiddenSep 18, 2025

    Rework ductwork in ED CT and Mechanical equipment room. Replace VAV and add chilled water station with heat exchanger, pump and associated accessories per plans

  21. MechanicalIssuedProject value hiddenSep 17, 2025

    Replace 7 GRD's

  22. PlumbingClosedProject value hiddenAug 28, 2025

    DEMO SINK, INSTALL NEW FAUCET AND SINK

  23. PlumbingIssuedProject value hiddenAug 28, 2025

    Add a floor sink

  24. PlumbingClosedProject value hiddenAug 28, 2025

    Install new domestic water to MRI-D expansion, along with (3) lavs and (1) mop-sink.

  25. MechanicalIssuedProject value hiddenAug 7, 2025

    " Controls are not included in this permit. The controls contractor shall obtain a separate permit. " HVAC system, installing VAV boxes with hot water reheat coils, GRDs and all as…

  26. CommercialClosedProject value hiddenJul 31, 2025

    remodel of CT room E1612 for new equipment. certificate of occupancy required no const type: 1a occupancy: I2 2020 MSBC sprinklered: yes architect: Leo Daly engineer: MBJ

  27. PlumbingClosedProject value hiddenJul 3, 2025

    abbott west. restrooms & drinking fountain

  28. CommercialClosedProject value hiddenJun 27, 2025

    alterations to replace emergency department CT machine and associated equipment. certificate of occupancy required no const type: 1a occupancy: I2 2020 MSBC sprinklered: yes archit…

  29. CommercialClosedProject value hiddenMay 29, 2025

    remodeling outpatient clinic areas of 3rd and 6th floor. piper neuro expansion. certificate of occupancy required no const type: 1a occupancy: B - outpatient clinic space 2020 MSBC…

  30. CommercialClosedProject value hiddenMay 29, 2025

    REMODEL ON 1ST FLOOR FOR EQUIPMENT const type: II-B occupancy: I-2 2020 MSBC architect: 53825 - Abeln, Daniel Jonathon @ EAPC engineer: 23148 - Trofimova-Peterson, Irene @ MBJ

  31. MechanicalClosedProject value hiddenApr 17, 2025

    BLDG1111397 3 new Data Center cooling systems. Data rooms are located on level 2,3, and 4 Ducted fan coils units. Condensers are located on the roof.

  32. CommercialClosedProject value hiddenMar 25, 2025

    alterations related to equipment upgrades for winter cooling. engineer: trofimova-peterson #23148

  33. MechanicalIssuedProject value hiddenMar 17, 2025

    New diffuser layout. BLDG1107239

  34. PlumbingClosedProject value hiddenMar 6, 2025

    Demo (1) existing sink. Provide and install (1) new sink faucet and trim for integral sink.

  35. MechanicalIssuedProject value hiddenMar 4, 2025

    Replacing GRDs and all associated ductwork per approved plans.

  36. CommercialClosedProject value hiddenFeb 5, 2025

    remodel X-ray room C. certificate of occupancy required no const type: 1a occupancy: I2 2020 MSBC architect: daly

  37. MechanicalIssuedProject value hiddenJan 29, 2025

    Installing two VAV boxes, GRDs and all associated ductwork per approved plans.

  38. PlumbingClosedProject value hiddenJan 28, 2025

    Add extra sink to BLDG1098529

  39. PlumbingClosedProject value hiddenDec 13, 2024

    1st and 2nd Flr NUC Med and Uptake - Scope of work: Demo (1) mop sink and (1) ss drop in counter sink. Provide and install (1) mop sink and (1) ss drop in counter sink.Fixture coun…

  40. MechanicalClosedProject value hiddenNov 21, 2024

    . The specific area of work was not identified in the construction documents.

  41. PlumbingClosedProject value hiddenNov 12, 2024

    Provide and install (1) RO/ DI system. Connect water and waste to existing services. Install(1) floor drain. (1) mop sink.

  42. CommercialClosedProject value hiddenOct 7, 2024

    remodel nuclear medicine and uptake area on 2nd floor heart hospital building. certificate of occupancy required no const type: 1a occupancy: I2 2020 MSBC sprinklered: yes architec…

  43. CommercialClosedProject value hiddenOct 7, 2024

    Replace existing side hinged doors with new sliding glass doors and 90 minute rated overhead coiling door per drawings, the doors being replaced are not a required part of the mean…

  44. MechanicalClosedProject value hiddenOct 3, 2024

    (11) Temporary Gas Heaters will be installed at Abbott Northwestern Surgical and Critical Care building, connecting to Holmes Heart Hospital and the TAF building. The Lower-Level t…

  45. CommercialClosedProject value hiddenSep 20, 2024

    Update MRI-C Rooms E 1897 and E 1892 for new Exablate equipment on level 1 of the main hospital certificate of occupancy required: no special inspections required: no SEPARATE PERM…

  46. MechanicalIssuedProject value hiddenMay 24, 2024

    Installing 5 fire/smoke dampers in new central heating plant basement tunnel. Plans uploaded. BLDG1058241

  47. MechanicalClosedProject value hiddenMay 2, 2024

    Abbott Northwestern Hospital - Piper Building AHU repairs/upgrades. Replace supply fans, return fans, cooling coils, and humidifiers in (3) existing air handling units. Lower level…

  48. CommercialExpiredProject value hiddenMar 8, 2024

    Flat Roof - EPDM General requirements for flat roof replacements. The roof covering is to meet the Minnesota Building code performance requirements of Section 1504, the fire classi…

  49. PlumbingClosedProject value hiddenMar 7, 2024

    Relocate one existing sink in existing Xray Room

  50. MechanicalClosedProject value hiddenMar 5, 2024

    Modify existing return ductwork in Xray room and change eggcrate size in one location

  51. MechanicalClosedProject value hiddenOct 17, 2023

    Demoing and re-routing equipment, duct, and piping in demolition zone per approved plans. This permit is just for temporary demolition, Contractor shall obtain mechanical permit fo…

  52. CommercialIssuedProject value hiddenSep 22, 2023

    COMERCIAL ROOF REPLACEMENT. (JJL) ENGINEER TO REVIEW WINDOW WASHING ANCHORS.

  53. CommercialClosedProject value hiddenSep 12, 2023

    Demo - Heart Hospital Main Lobby Area Levels 1, 2, & 3 certificate of occupancy required: no special inspections required: no const type: 1-A occupancy: I-2 2020 MSBC occupant load…

  54. CommercialClosedProject value hiddenAug 22, 2023

    Selective demolition and construction of valet hut and connections to existing parking helix certificate of occupancy required: no special inspections required: yes const type: 2-B…

  55. MechanicalClosedProject value hiddenAug 18, 2023

    Modify duct for new floor plan. Plans are available.

  56. MechanicalClosedProject value hiddenAug 11, 2023

    Minor duct alterations. Plans available. Level 2 H2171 C5 command center

  57. PlumbingClosedProject value hiddenAug 10, 2023

    Add (1) drop-in sink. Add (1) plumbed connection for owner provided coffee machine plan review is done by DOLI, not Mpls, no Mpls Plumbing Plan Review required.2023-08-08 - lea

  58. PlumbingClosedProject value hiddenJul 6, 2023

    FOR PARKING RAMPS 1 AND 3 AT 880 28TH ST E - Reroute parking Ramp 3 stairwell drains, and one roof drain out of Ramp 1. Ramp 1 is being demolished.

  59. MechanicalClosedProject value hiddenJun 20, 2023

    Lab hood modification per attached plans.

  60. PlumbingClosedProject value hiddenJun 13, 2023

    2ND FLOOR HISTOLOGY LAB UPGRADE- NEW RESTROOM SINK

  61. CommercialIssuedProject value hiddenJun 6, 2023

    Remodel lower level Courage Kenny Building for office space associated with BLDG982846 certificate of occupancy required: no const type: 1-B occupancy: B 2020 MSBC occupant load: 6…

  62. PlumbingClosedProject value hiddenApr 25, 2023

    break room sink in new lower level office of courage kenny building

  63. PlumbingClosedProject value hiddenApr 17, 2023

    Installation of storm drainage for hospital skyway

  64. MechanicalClosedProject value hiddenApr 5, 2023

    1. Shall install CO2 sensors as specified. Alteration of HVAC system, reusing existing system to support the new layout. Installing GRDs and all associated ductwork. Refer to attac…

  65. CommercialClosedProject value hiddenMar 13, 2023

    Interior remodel certificate of occupancy required: no special inspections required: no const type: 1A occupancy: I-2 2020 MSBC sprinklered: yes architect: Thomas Beck #46352

  66. CommercialClosedProject value hiddenMar 7, 2023

    Remodel lower level Courage Kenny Building for office space certificate of occupancy required: no const type: 1-B occupancy: B 2020 MSBC occupant load: 45 sprinklered: yes

  67. MechanicalClosedProject value hiddenFeb 13, 2023

    Skyway HVAC system, installing 4 packaged units with DX coil and gas heat, VRF system with 8 fan-coil units and 3 VRF condensing units, cooling only split system, electric unit hea…

  68. PlumbingClosedProject value hiddenJan 12, 2023

    add 4 new floor drains

  69. PlumbingClosedProject value hiddenDec 27, 2022

    Renovation to the Tenth Avenue Facility restrooms on the mezzanine level of 3rd and 4th floors. including mens and womens restroom, replacement of all fixtures and floor drains.

  70. MechanicalClosedProject value hiddenDec 20, 2022

    Rework of exhaust systems on level 3 and 4. Existing life safety damper and ducts for electrical room exhaust to be re-used , new electrical room exhaust fan only. Alternate 1 in n…

  71. MechanicalClosedProject value hiddenDec 20, 2022

    Drawings attached. Complete snow melt system per design. Also conditioning new entrance/lobby area. 2 CHU west Vesibule and CK Vestibule.

  72. PlumbingClosedProject value hiddenDec 19, 2022

    Replace (1) existing sink with new using existing rough plumbing. Add plumbed coffee machine using existing sink rough plumbing.

  73. PlumbingClosedProject value hiddenDec 12, 2022

    reinstall wastelines accomodate new drive lane

  74. MechanicalClosedProject value hiddenDec 9, 2022

    repiping gas for generator RTU and skyway due to meter moves. Also new 3" gas for n2 new boilers. Plans attached.

  75. MechanicalClosedProject value hiddenDec 2, 2022

    temp heat

  76. CommercialClosedProject value hiddenNov 18, 2022

    (DMH-ProjectDox) SELECT DEMO AT WEST MAIN FLOOR ENTRY AND COMMON AREA . DEMO SELECT PARTITION WALLS FOR FUTURE REMODEL. SEPARATE APPLICATION, PLANS, PERMITS AND APPROVALS REQUIRED…

  77. MechanicalClosedProject value hiddenNov 10, 2022

    In neuro room replacing existing fan coil unit adding one cooling only vav box, GRDs and all associated ductworks. Refer to attached drawings.

  78. CommercialClosedProject value hiddenNov 7, 2022

    CONVERT ROOM 1294 INTO TEMPORARY POP UP CAFETERIA , TAKE OUT NO SEATING (MAA) const type: II occupancy: B 2020 MSBC occupant load: 20 sprinklered:YES 20% accessibility upgrades____…

  79. PlumbingClosedProject value hiddenOct 27, 2022

    Modifying existing doctors lounge with new food service Project is at a hospital DOLI to review plumbing. No Minneapolis plumbing plant review.

  80. CommercialExpiredProject value hiddenSep 15, 2022

    CONCRETE AND POST TENSION REPAIRS LEVEL 3. (JJL) ENGINEER: MBJ ENGINEERS - DAN MURPHY #13373 SPECIAL INSPECTIONS: SEE SHEET S001

  81. PlumbingClosedProject value hiddenAug 18, 2022

    Installation of new anti ligature fixtures

  82. MechanicalClosedProject value hiddenAug 11, 2022

    Modification of supply duct, exhaust duct, and new GRD installation. Refer to attached drawings.

  83. CommercialClosedProject value hiddenJul 18, 2022

    remodel 4 existing seclusion room areas on 3rd and 4th floor - courage Kenny medical building. certificate of occupancy required: no const type: 1b occupancy: b 2020 MSBC sprinkler…

  84. MechanicalClosedProject value hiddenJul 6, 2022

    Adding three VAV boxes with reheat coil, relocating existing VAV boxes, GRDs and all associated ductwork. Refer to attached drawings.

  85. MechanicalClosedProject value hiddenJun 22, 2022

    HVAC system, installing new fan-powered box with hot water heating, split DX cooling system include indoor fan-coil and outdoor condensing unit, condensate pump, hydronic piping, G…

  86. MechanicalClosedProject value hiddenJun 16, 2022

    Ductwork modification and diffuser installation per attached drawings.

  87. MechanicalClosedProject value hiddenJun 3, 2022

    Modifying breakroom duct work, low pressure steam piping, GRDs and all associated ductwork. Refer to attached drawings.

  88. PlumbingClosedProject value hiddenJun 2, 2022

    INSTALL 2 BREAK ROOM SINKS, FLOOR DRAINS, CLEAN OUT AND ICE MAKER. RECONNECT 2 OWNER PROVIDED WASHERS AND OWNER PROVIDED 3 COMP SINK.

  89. CommercialClosedProject value hiddenMay 30, 2022

    INTERIOR REMODEL OF EXISTING ENDOSCOPY ROOM ON 5TH FLOOR AT ABBOTT NORTHWESTERN HOSPITAL. NO STRUCTURAL WORK. (JJL) SOME WORK ON THE FLOOR UNDER BLDG908871. certificate of occupanc…

  90. CommercialClosedProject value hiddenMay 27, 2022

    lower level remodel of quick turn room and staff break lounge. certificate of occupancy required: no const type: 1a occupancy: I2 2020 MSBC sprinklered: yes architect: nelson

  91. PlumbingClosedProject value hiddenMay 20, 2022

    Direct replacement of existing waste piping in Piper bldg canopy area. No Fixtures

  92. CommercialClosedProject value hiddenMay 2, 2022

    REPLACE DEFS (Direct-Applied Exterior Finish System) SOFFIT AND LEAKING AND DAMAGED PIPING Provide non-combustible framing, Batt insulation (not foam plastic), and Densglass Firegu…

  93. CommercialClosedProject value hiddenApr 28, 2022

    Abbott Northwest Hospital Security Upgrades Required egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort or shall co…

  94. CommercialClosedProject value hiddenApr 1, 2022

    minor security upgrades - mainly card readers and cameras.

  95. MechanicalClosedProject value hiddenMar 14, 2022

    HVAC system for wide open shell area for Simulation lab, Conference center and board room, installing 25000 CFM air handling unit, two exhaust fans, electric humidifier, 28 VAV box…

  96. MechanicalClosedProject value hiddenMar 7, 2022

    Alteration for new bike center, adding 4100 cfm air handling unit, two rooftop units, one heat pump, eight electric unit heaters, eleven VAV boxes, air curtain, GRDs and all associ…

  97. MechanicalClosedProject value hiddenFeb 28, 2022

    Adding two supply duct and diffusers, exhaust duct , two fire dampers and associated per attached plan.

  98. CommercialClosedProject value hiddenFeb 18, 2022

    Minor alterations on 3rd floor - relocation of PEI pharmacy. certificate of occupancy required no const type: 1a occupancy: I1 2020 MSBC sprinklered: yes Tenant: ANW Floor(s): 3rd

  99. MechanicalClosedProject value hiddenFeb 14, 2022

    Replacing an existing chiller with 56 tons air cooled chiller adding heat exchanger, supply and return chilled water pipes, replacing one pump. Refer to attached drawings.

  100. PlumbingClosedProject value hiddenFeb 10, 2022

    RESTROOM & BREAKROOM FIXTURES FOR NEW SIMULATION LAB+CONFERENCE CTR+BOARD RM ADDITION

  101. PlumbingClosedProject value hiddenFeb 10, 2022

    FIXTURES FOR NEW BIKE CENTER ON 10TH AVE SIDE OF CAMPUS

  102. CommercialClosedProject value hiddenFeb 1, 2022

    LOWER LEVEL SURGERY AREA - PHASE I REMODELING certificate of occupancy required no special inspections required no const type: I-A occupancy: I-2 2020 MSBC occupant load: no change…

  103. CommercialClosedProject value hiddenJan 27, 2022

    (DMH - ProjectDox) REMODEL/ UPDATES TO 988 SQFT. RECEPTION AND WAITING AREA, AND 1 EXAM ROOM AT MAIN FLOOR LEVEL. ROOMS CK1750, CK1751 & CK1766. Const type: I Occupancy: B 2020 MSB…

  104. MechanicalClosedProject value hiddenDec 23, 2021

    This permit is companion of permit BLDG912815, adding smoke damper and duct per attached plan.

  105. MechanicalClosedProject value hiddenDec 23, 2021

    This permit is companion of BLDG894021, The scope of work for this permit is just sheet metal rough-in for the storefront area of ramp 7. Refer to attached drawings.

  106. MechanicalClosedProject value hiddenNov 8, 2021

    HVAC renovation for bronchoscopy area, replacing one VAV box with hydronic coil and exhaust fan, adding GRD's and all associated ductwork. Refer to attached drawings.

  107. CommercialClosedProject value hiddenOct 28, 2021

    REPAIR STRUCTURAL COMPONENT - CONCRETE COLUMNS AT 2 LOCATIONS IN PARKING GARAGE ----- engineer: DANIEL E MURPHY - 13373 occupancy: S-2 construction type: I-B sprinklered: NO -----…

  108. PlumbingClosedProject value hiddenOct 26, 2021

    FOR WASIE BUILDING TEMPORARY OFFICES ON 1ST FLOOR - ADD 1 HANDWASHING SINK

  109. MechanicalClosedProject value hiddenOct 21, 2021

    TEMPORARY HEATERS - Provide temp service heat for a new and existing parking garage under construction at Abbott Northwest. Gas pipeline to be installed and service 10 temp heaters…

  110. PlumbingClosedProject value hiddenOct 21, 2021

    FOR PIPER BUILDING'S BRONCHOSCOPY ROOM - REPLACE AND RELOCATE SINK

  111. CommercialClosedProject value hiddenOct 15, 2021

    Interior Remodel of Bronchoscopy Room (rm 8) certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2020 MSBC sprinklered: yes architect…

  112. MechanicalClosedProject value hiddenSep 27, 2021

    Replacement with 2 new boilers - each over 400K BTUH

  113. MechanicalClosedProject value hiddenSep 23, 2021

    HVAC system for temporary construction office, modifying existing ductwork per new layout. Refer to attached drawings.

  114. MechanicalClosedProject value hiddenAug 26, 2021

    HVAC system for 3 story addition to existing ramp and new ramp adding 4 air handling unit, 4 VAV boxes, electric heaters, six exhaust fans, supply fan. twelve ductless split coolin…

  115. CommercialClosedProject value hiddenAug 6, 2021

    infill indoor pool in Wasie building and remodel for temporary offices certificate of occupancy required: no special inspections required: no sprinklered: no architect: none engine…

  116. PlumbingClosedProject value hiddenMay 27, 2021

    Furnish and install plumbing scope for Abbott NW Transportation HUB project. Scope includes: expansion to parking ramp 6 and construction of new parking ramp 7 at Abbott NW hospita…

  117. CommercialClosedProject value hiddenMay 10, 2021

    REPLACE LARGE/HEAVY MACHINE/EQUIPMENT, RENOVATE ROOM INCLUDING MACHINE SUPPORTS & ROOM FINISHES - EXISITNG MEDICAL PROCEDURE ROOM ----- 2020 MINNESOTA STATE BUILDING CODE architect…

  118. MechanicalClosedProject value hiddenMay 3, 2021

    Adding a VAV box and two air dampers, DX split system, hot water piping to VAV box coil, duct work modification, supply diffusers and return grilles per attached drawings.

  119. PlumbingClosedProject value hiddenApr 29, 2021

    INSTALL 1 NEW AUXILIARY DRAIN OUTLET BOX. NEW MEDGAS AND WASTE PIPING. PROJECT HAPPENING ON 3RD FLOOR AT ANW MAIN HOSPITAL FOR EP-2 ROOM.

  120. MechanicalClosedProject value hiddenApr 26, 2021

    Due to new construction on adjacent land, relocating three louvers and providing combination of fire and smoke dampers as shown on attached drawings.

  121. PlumbingClosedProject value hiddenApr 22, 2021
  122. PlumbingCancelledProject value hiddenMar 24, 2021
  123. PlumbingCancelledProject value hiddenMar 24, 2021
  124. MechanicalClosedProject value hiddenMar 22, 2021

    Adding a supply diffuser and fire smoke damper per attached plan.

  125. PlumbingClosedProject value hiddenFeb 18, 2021

    Installation of (4) sinks and (3) floor drains at ANW on the lower level SPS Sinks and Caviwaves E0261 Room.

  126. CommercialClosedProject value hiddenFeb 11, 2021

    remodel portions of wound clinic on 4th floor west tower. sck certificate of occupancy required no const type: occupancy: 2020 MSBC sprinklered: yes Tenant: wound clinic Floor(s):…

  127. CommercialClosedProject value hiddenFeb 11, 2021

    INTERIOR REMODEL OF EXISTING 1 - 2 HEALTHCARE OCCUPANCY TO CONVERT OFFICE AND WAITING AREAS TO NEW FLUOROSCOPY IMAGING ROOM WITH CONCTROL AREA. AAJ (PROJECT DOX PLANS AND DOCUMENTS…

  128. MechanicalClosedProject value hiddenFeb 11, 2021

    Demo two exhaust grilles and adding one new supply diffuser and associated duct work per attached plans.

  129. MechanicalClosedProject value hiddenFeb 11, 2021

    Modification of HVAC system, adding one VAV box , supply diffusers, exhaust grilles and all associated duct work. Refer to attached drawings.

  130. PlumbingClosedProject value hiddenFeb 11, 2021
  131. PlumbingClosedProject value hiddenFeb 11, 2021
  132. CommercialClosedProject value hiddenJan 29, 2021

    Interior Rmdl Of Decontamination Area Of Sterile Processing certificate of occupancy required no special inspections required no const type: I-B occupancy: I-2 2020 MSBC occupant l…

  133. MechanicalClosedProject value hiddenJan 4, 2021

    Adding new duct work per new rooms layout, reusing existing VAV boxes, adding a unit heater and piping. The highlighted plan area ramp 7 level 1 on M301 is the only scope of this p…

  134. MechanicalClosedProject value hiddenDec 29, 2020

    HVAC upgrade adding 3 VAV boxes, water source unit heater, piping , supply diffusers, return grilles and all associated duct work. Refer to attached drawings.

  135. PlumbingClosedProject value hiddenDec 29, 2020

    ABBOTT NORTHWEST HOPSITAL - PIPER BUILDING TO RADIATION ONCOLGY LINK.

  136. MechanicalClosedProject value hiddenDec 23, 2020

    Temporary relocating two existing cooling towers and associated piping and valves per attached plans.

  137. MechanicalClosedProject value hiddenDec 22, 2020

    Replacing a 10 ton chiller, hydronic piping and duct modification,new grilles and diffusers. Refer to attached drawings.

  138. CommercialClosedProject value hiddenDec 18, 2020

    addition of exterior wall and corridor. interior remodel of corridors, patient rooms and lobby areas within first floor piper building. sck certificate of occupancy required no spe…

  139. CommercialClosedProject value hiddenDec 8, 2020

    area 7 reroof - tear down to insulation and install new ballasted EPDM system.

  140. MechanicalClosedProject value hiddenNov 24, 2020

    Temp heat - 2 LP heaters

  141. CommercialClosedProject value hiddenNov 10, 2020

    2nd Floor Pharmacy Pass-Through Window certificate of occupancy required: no ***** special inspections required: no***** const type: 1A ***occupancy: B ***2020 MSBC***** sprinklere…

  142. CommercialClosedProject value hiddenNov 3, 2020

    LOWER LEVEL REMODELING - ADDED VALUE TO 835225 certificate of occupancy required no special inspections required no const type: 1-A occupancy: B (small assembly per 303.1.2) and S-…

  143. CommercialClosedProject value hiddenSep 24, 2020

    construct medical gas tank enclosure adjacent to 28th st.. sck special inspections required

  144. PlumbingClosedProject value hiddenSep 22, 2020

    FOR LINEAR ACCELERATOR ROOM - ADD SINK AND FLOOR DRAIN

  145. MechanicalClosedProject value hiddenSep 3, 2020

    Relocating diffuser.

  146. PlumbingClosedProject value hiddenAug 13, 2020

    Replace (1) Existing Drinking Fountain with new

  147. MechanicalClosedProject value hiddenJul 27, 2020

    Modification of HVAC system adding reheat coil, supply diffusers, return grills and all associated duct work. Refer to attached drawings.

  148. CommercialClosedProject value hiddenJul 23, 2020

    interior remodeling of linear accelerator room B. sck certificate of occupancy required no const type: 1a occupancy: I2 2020 MSBC sprinklered: yes energy code chapter used: archite…

  149. CommercialClosedProject value hiddenJul 21, 2020

    REMODEL LL MAIN WEST FOR CENTRAL LINEN, EVS LOUNGE, AND LOCKER ROOM (scope added and approved) certificate of occupancy required no special inspections required no const type: 1-A…

  150. PlumbingClosedProject value hiddenJul 16, 2020

    ADDITION OF FLOOR DRAIN, RELOCATION OF SINK AND ICE MAKER LOCATED IN THE LOWER LEVEL OF HOSIITAL, LINEN CLEANING ROOM.

  151. MechanicalClosedProject value hiddenJul 13, 2020

    HVAC system, including air handling unit, VAV boxes, air valves, exhaust fans, unit heaters, supply diffusers, return grills and all associated duct work. Refer to attached drawing…

  152. PlumbingClosedProject value hiddenJul 9, 2020

    PIPER BLDG ANW-PHARM & FINAL STATE INFUSION

  153. PlumbingClosedProject value hiddenJul 7, 2020

    INSTALL ONE 8" X 4" ROOF DRAIN ON EMERGENCY DEPARTMENT CANOPY

  154. MechanicalClosedProject value hiddenJun 30, 2020

    Reconfiguration of HVAC system including six VAV boxes and dampers, hydronic piping, supply diffusers, return grills and all associated duct work. Refer to attached drawings.

  155. MechanicalClosedProject value hiddenJun 23, 2020

    Reconfiguration of HVAC system including three dual duct VAV boxes, supply diffusers, return grills and all associated duct work. Refer to attached drawings.

  156. MechanicalClosedProject value hiddenJun 18, 2020

    Adding two 20 ton unit to supply outside air to tunnel serving the other indoor units.

  157. CommercialClosedProject value hiddenJun 16, 2020

    Replace curtain wall and windows Fire stop SI CAIM approved 8/22/22 attached in ELMS ADD $2500 UNPERMIT WK FEE BUT 50% PR FEE certificate of occupancy required no special inspectio…

  158. PlumbingClosedProject value hiddenJun 16, 2020

    FOOD - CV6 REMODEL RELOCATE FIXTURE

  159. CommercialClosedProject value hiddenMay 22, 2020

    remodel and CV-6 equipment replacement certificate of occupancy required NO special inspections required NO const type: I-A occupancy: I-2 2015 MSBC occupant load: NO CHANGE sprink…

  160. CommercialClosedProject value hiddenMay 12, 2020

    Remodeling of storage spaces certificate of occupancy required: NO***** special inspections required: NO***** const type: I-A ***occupancy: B ***2015 MSBC***** occupant load: NO CH…

  161. CommercialClosedProject value hiddenMay 5, 2020

    ADDITION OF FREE STANDING PORTE COCHERE,EMERG DEPT. DEMOLITION, ADDITION OF 3 STEEL COLUMNS COVERED IN CONCRETE TO SUPPORT ROOF STRUCTURE AND THE ROOF SYSTEM CONSISTS OF GALVANIZED…

  162. CommercialClosedProject value hiddenMay 5, 2020

    Remodel for new new medical equipment certificate of occupancy required NO special inspections required YES const type: I-A occupancy: 1-2 2015 MSBC sprinklered: YES Tenant: ABOTT…

  163. MechanicalClosedProject value hiddenApr 30, 2020

    Providing exhaust fan for sterilization cabinet.

  164. MechanicalClosedProject value hiddenApr 28, 2020

    HOT WATER PIPING / DUCTS & VAV'S FOR 1ST & 4TH FLOORS

  165. CommercialClosedProject value hiddenApr 14, 2020

    ELEC-Abbot-1st fl- interior TI and equip repl. certificate of occupancy required no special inspections required yes no const type: !-A occupancy: I-2 2015 MSBC occupant load: __no…

  166. CommercialClosedProject value hiddenApr 7, 2020

    (DMH#2) TEAR OFF & REROOF SELECT ROOF AREAS TO HOSPITAL FACILITY. REMOVE TO CONCRETE & METAL DECKS, INSTALL VAPOR BARRIERS AS REQUIRED, TAPERED ISO. INSULATIONS, 1/2" COVER BOARDS,…

  167. MechanicalClosedProject value hiddenMar 6, 2020

    Reconfiguration of HVAC system including seventeen VAV boxes with hydronic heating coil, hydronic piping, supply diffusers, return grills and all associated duct work. Refer to att…

  168. CommercialClosedProject value hiddenMar 5, 2020

    CONVERT SPACE TO RETAIL PHARMACY __ certificate of occupancy required no ** special inspections required no ** const type: I-B _ occupancy: I-2 and B (nonseparated) _ 2015 MSBC **…

  169. PlumbingClosedProject value hiddenFeb 24, 2020
  170. MechanicalClosedProject value hiddenFeb 5, 2020

    INSTALL NEW UTILITY SET FAN AND INSTALL CONDENSATE DRAIN INTO STAINLESS DUCT

  171. MechanicalClosedProject value hiddenFeb 4, 2020

    INSTALL WALK IN COOLER AND REFER UNIT

  172. PlumbingClosedProject value hiddenJan 28, 2020

    Install 1 plumbing vent to accommodate new floor plan layout.

  173. MechanicalClosedProject value hiddenJan 17, 2020

    Replacing supply and return diffusers with associated ductwork.

  174. CommercialClosedProject value hiddenJan 7, 2020

    REMODELING FOR SCANNER REPLACEMENT - IR RM C. No structural work, *** certificate of occupancy required : no ** special inspections required no *** const type: IA *** occupancy: I-…

  175. CommercialClosedProject value hiddenDec 31, 2019

    LEVEL 1 OF COURAGE KENNY BUILDING AND LEVEL 1 OF VIRGINIA PIPER BUILDING. DEMO OF THREE AREAS WITHIN THOSE 2 BUILDINGS. SOME MISC INTERIOR WALL FRAMING. NO STRUCTURAL WORK. ALL NON…

  176. MechanicalClosedProject value hiddenDec 19, 2019

    HVAC system for partial renovation. They are adding new air handling unit, VAV boxes, 2 small exhaust fan and all associated duct work and supply and return air diffusers and grill…

  177. MechanicalClosedProject value hiddenNov 4, 2019

    Upgrading HVAC system for part of building, adding one fan-coil and two VAV boxes. replacing supply fan, return fan, final filter section, pre-filter section of existing air handli…

  178. PlumbingClosedProject value hiddenNov 1, 2019

    NEW RESTROOM AT 10TH AVE FACILITY FOR MEDICAL RECORDS OFFICE

  179. PlumbingClosedProject value hiddenNov 1, 2019

    FOR COURAGE KENNY AREA - 7 OXYGEN OUTLETS & ZONE VALVE BOX

  180. CommercialClosedProject value hiddenOct 29, 2019

    alterations to parking structure office to allow for new customer pay station. sck

  181. CommercialClosedProject value hiddenOct 25, 2019

    PARTIAL RENOVATION OF FIRST FLOOR CURRENTLY CALSSIFED I-2. FIRST FLOOR FUNCTIONS AS OUT PATIENT CLINIC, PHARMACY, AND OFFICES.(MAA) CURRENT OUT PATIENT CLINIC WILL BE CONVERTED INT…

  182. MechanicalClosedProject value hiddenOct 24, 2019

    Remodeling HVAC system for oncology offices, adding 5 VAV boxes and on exhaust fan. Refer to attached drawings.

  183. PlumbingClosedProject value hiddenOct 24, 2019

    1ST FLOOR ONCOLOGY REMODEL

  184. MechanicalClosedProject value hiddenOct 16, 2019

    INSTALL 2 NEW VAV'S / GRD,S

  185. CommercialClosedProject value hiddenOct 8, 2019

    3RD FLOOR/CV LAB 5 & CV LAB 7. Replace with near-identical equipment. No increase in loads or change of anchorage to pan joist structure. 2 new FS dampered penetrations of compartm…

  186. PlumbingClosedProject value hiddenSep 12, 2019
  187. MechanicalClosedProject value hiddenAug 9, 2019

    Adding a centralized air handling unit that will replace four existing air handling units with associated duct work and piping and steam heat exchanger. Refer to attached drawings.

  188. MechanicalClosedProject value hiddenJul 30, 2019

    RELOCATE OWNERS EXISTING STERILIZERS AND STEAM PIPING

  189. PlumbingClosedProject value hiddenJul 26, 2019

    17 FIXTURES/BATHROOMS

  190. PlumbingClosedProject value hiddenJul 24, 2019

    PLUMBING VENTS (11) ON ROOF CHARGED FOR 2 FIXTURES PER DAN CALLAHAN

  191. PlumbingClosedProject value hiddenJul 11, 2019

    WASTE WATER VENT PIPING

  192. CommercialClosedProject value hiddenJul 8, 2019

    RENOVATION OF EXISTING OR 23 AND OR 25 SPACE TO ACCOMADATE NEW MEDICAL EQUIPMENT. ROOMS ARE LOCATED ON LOWER LEVEL. MAIN HOSPITAL, AREA "A" OPERATING ROOMS PER KEY PLAN. SPECIAL IN…

  193. CommercialClosedProject value hiddenJun 21, 2019

    LOWER LEVEL. OFFICE REMODELED INTO A WORK STATION AREA. LOCATED LOWER LEVEL, AREA B. MAIN HOSPITAL. DOOR NUMBER ON PLANS IS E0236 IMPLANT STORAGE. (JJL)

  194. MechanicalClosedProject value hiddenJun 14, 2019

    1 NEW VAV / DUCTS / RELOCATE GRILLES & DIFFUSERS PER PLANS / MOST OF THE WORK IS DEMO CAP & SEAL DUCTS / DEMO FCU'S & PIPING CAP AT MAINS / DEMO MED GAS OUTLETS & PIPING BACK TO ZO…

  195. MechanicalClosedProject value hiddenJun 4, 2019

    REPLACE VAV'S & DUCTS FOR NEW LAYOUT / NO OTHER NEW EQUIPMENT

  196. MechanicalClosedProject value hiddenMay 10, 2019

    VAV,S WITH REHEAT COILS / FIRE SMOKE DAMPERS / DUCTS PER ENG. PLANS

  197. CommercialClosedProject value hiddenMay 7, 2019

    MECHANICAL SYSEMT UPDGRADE WITH ASSOCIATED BUILDING MODIFICATIONS certificate of occupancy required YES special inspections required YES sprinklered: YES Tenant: Courage Kenny Floo…

  198. PlumbingClosedProject value hiddenMay 3, 2019

    8 fixtures in the restroom

  199. MechanicalClosedProject value hiddenMar 29, 2019

    Refer to attached drawings

  200. MechanicalClosedProject value hiddenMar 25, 2019

    VENT/LOW PRESSURE STEAM/CHILLED WATER-AHU S REBUILD

Development activity near 800 28TH St E

3 mapped permits within 500 m, shown on the intelligence map above.

Browse recent permits near this address

800 28TH St E in the Minneapolis permit market

This address has 200 permit records in PropertyLabs' public history and is located in Midtown Phillips. The city figures below provide context without changing the focus of this exact-address record.

Explore Minneapolis building permits
City address-linked rows
399,644
City, trailing 90 days
8,479
City, trailing 30 days
3,343

City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 23, 2026.

Permit questions about 800 28TH St E

Are there building permits at this address?
800 28TH St E has 200 municipal building permits on record, with the latest activity dated Jul 21, 2026.
What construction activity is nearby?
3 mapped permits were found within 500 m of 800 28TH St E.
What is the declared permit value?
Permits recorded at 800 28TH St E represent $67M in total declared construction value.

About this address record

PropertyLabs compiled this permit history from municipal public records for Minneapolis, MN. The latest recorded permit activity at 800 28TH St E is dated Jul 21, 2026. Municipal records can be corrected or updated after publication.

Sources and data notes

Contractors and applicants associated with these permits

See the contractors, applicants, permit holders, permit numbers, and project documents associated with 800 28TH St E in the PropertyLabs platform, along with alerts when new permits are filed at this address.