Building permit intelligence · Boston, MA
881-883 E First St has 42 municipal building permits on file in Ward 6. The latest recorded activity was a plumbing permit permit dated Jul 14, 2026. Permits at this address represent $500K–$1MM in total declared construction value. PropertyLabs also identified 3 mapped permits within 500 m of this address.
we are installing a shower vanity and toilet
remove bathtub and replace with walk in shower. replace toilet replace vanity tile new shower area
Install kitchen sink, disposal , and dishwasher
Wiring for a kitchen and bedroom remodel in unit 402
Renovate existing kitchen - NO structural work. Dry wall repairs in bedroom. Bring Electrical work up to code.
3 mapped permits within 500 m, shown on the intelligence map above.
9 other addresses on E First St with municipal permit records in Boston.
This address has 42 permit records in PropertyLabs' public history and is located in Ward 6. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 2, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 881-883 E First St is dated Jul 14, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 881-883 E First St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Install shower. , lav & toilet
Wiring for a bathroom remodel in unit 101
Up grade parking lot lamps to LED.re-connect existing gas heater on roof. Re-connect and add disconnect to roof top A/C unit.replace exhaust motor on roof vent
DEMO EXISTING BATHROOM AND PUT BACK AS NEW .NO CHANGE IN SIZE OF BATHROOM
Up grade parking lot lamps to LED.re-connect existing gas heater on roof. Re-connect and add disconnect to roof top A/C unit.replace exhaust motor on roof vent
gas dryer replacement for unit # 207
Replacing French door in unit 505
Replace gas furnace
replace gas furnace
Replace gas furnace
Install new Tub / Shower valve and connect drain.
Front of Building middle section last floor repair any bricks cracks and caulking around the wall metal to stop the leak
bathroom remodel gfi circuit and lighting circuit both existing run 2 new circuits for radiant heat and heated toilet seat replace exaust fan
Remove and replace Master bath fixtures. Tile floor, Tile shower walls. Install new exhaust fan and lighting.
bathroom renovation
2 bedrooms and 1 bath
2 bedrooms and 1 bathroom
remodel of existing bathroom and kitchen
new stove
bathroom renovation with new bathroom new walls for bedroom with new layout no structural work. ;work to be done in unit 103
wire additional bedroom.
replacement gas dryer
Add additional outlets bedroom
install 1 wall, 1 closet, 1 door redo hardwood floor area, 260sqft, add 2 new outlets, 1 tele/data line, paint trim new sheet rock will del csl and hic lis to you also workers comp…
kitchen sink disposal dishwasher
gas stove, water heater
Wire new furnace, 6 outlets, 8 lights. Move switches. Move thermostat.
repkace boiler and fireplace
replace boiler and fireplace
UNIT #503 INTERIOR RENOVATION TO UNIT, NO STRUCTURAL WORK, ELECTRICAL AND PLUMBING PERMITS TO FOLLOW
upgrade apartment lighting
Installed a 75 Gallon Gas Hot Water Heater.
Installed 75 Gallon Gas Hot Water Heater
Remove existing tub/ shower and valve . replace tub shower and valve . remove existing vanity and toilet and replace with new .
Installation of one sprinkler head in closet in Unit 504
Renovations to existing kitchen and bathroom in UNIT #405; also add full bath and erect two n-b partitions, also - 5 sprinkler heads to be added
Demo the kitchen, remove the fireplace,;2 AC vents in the bedroom and patch, Complete remodel to 1st &; 2nd floor ;bathrooms. Repair PVC pipe where it meets the downspout in the ba…