Building permit intelligence · Boston, MA
90 Cushing Av has 71 municipal building permits on file in Ward 13. The latest recorded activity was a plumbing permit permit dated Jul 28, 2026. Permits at this address represent $1MM–$5MM in total declared construction value. PropertyLabs also identified 3 mapped permits within 500 m of this address.
Demo and cap five fixtures, install new fixtures, and relocation of one storage tank.
Electrical
Electrical
Other
Other
Electrical
3 mapped permits within 500 m, shown on the intelligence map above.
9 other addresses on Cushing Av with municipal permit records in Boston.
This address has 71 permit records in PropertyLabs' public history and is located in Ward 13. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 2, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 90 Cushing Av is dated Jul 28, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 90 Cushing Av in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Demolition - Exterior
Plumbing
Gas
Plumbing
Electrical
Renovations - Interior NSC
Plumbing
Electrical
Install CCTV system
install cable tray, grounding and 3 30 amp single pole circuits from existing panel. Install 2" rigid conduit for fiber run on roof top. swap out 4 existing whip antennas.
Replacement of existing Kitchen Sink and Dishwasher
Electrical work for partial kitchen remodel located on 5th floor.
Renovation of 5th floor kitchen to include new ceiling tile, flooring, FRP wall panels, appliances and counter tops. Replace existing 2x2 ceiling lights with new LED 2x2 ceiling li…
Renovation to two concrete ramps at parking garage, replace failing concrete, install new rebar, clean and paint steel beams. Make misc repairs to steel beams if needed
Migrate Faraday FACP to Notifier FACP [ePlan]
Migrate Faraday FACP to Notifier FACP
Provide 25kVA temporary generator and all cables and up to 12 GFCI receptacles for sound and lighting equipment Monday 9/9/19 6AM to 10PM. Bart Mccracken 774-239-7834.
Record Storage, Administrative Offices, Settlement House and Daycare from 71 to 75 Certificate for the Basement layout Modification only SF875360 issued: 9/4/18 &; ALT570472 issued…
Investigation after water damage in day care area. Installation of temporary power/lighting
Sprint: Remove (3) radios and swap (3) existing antennas with (3) new antennas and associated cabling. Install equipment expansions to the top of existing cabinets (approx 1'-2') w…
Electrical
Renovation of existing Recreation room of St. Mary's Center for Women & Children.
Renovation of basement into recreation room. Installing 3 initiating devices, 6 notification devices, and 1 power supply.
Remove existing emergency generator that is to be replaced by new. Excavate, form, and pour new concrete pad for new emergency generator. Excavate from pad to building for electric…
Disconnect and remove existing generator and electrical connections. Furnish and install new 180kW emergency generator. Furnish and install conduits and conductors to tie in new ge…
basement layout modification, life safety changes, MEP changes and finishes associated with the new layout.
Misc. repairs through facility. Painting, patching, new flooring and shelving
disconnection of 2 outlets on a halfwall that is being removed in the daycare area.
add 100 amp sub-panel and circuits for new radio equipment
Increased capacity;in our child care center from; 71 children to 75 children. One classroom to have half wall to be removed and flooring to be updated. Other two classrooms need no…
painting, ceiling tile replacement, door replacement, minor repairs and patching.
Renovations of approx 400 sf work includes floors, ceilings, paint, finishes, lighting, for sensory RM for St Mary's
repair of water damage
1200 led bulbs installed , 12 vapor tight garage , 20 led wall packs , 10 led canopy garage
replace 35 existing vinyl windows with new vinyl windows and 10 aluminum windows with new aluminum windows
make minor renovations throughout facility
5th floor outlets demo 1st floor panel rewire existing heater demo existing panel and hvac
WIRE FOUR BOILERS AND TWO STORAGE TANKS
INSTALL FOUR (4) OIL FIRED BOILERS AND TWO (2) 500,000 BTU WATER HEATERS
INSTALL FOUR (4) 800K BTU BOILERS AND TWO (2) 500K BTU WATER HEATERS
The Applicant proposes to add 3 antennas to its existing wireless communicatiuons facility on the building, per the attached plans.
Installation of electrical outlets and alteration of lighting in the 4th floor computer lab. Alteration of outlets in storage room across hallway.
Running of data cables in the 4th floor computer lab adding a patch panel in the storage room across the hall
Second Floor - Replace existing outlets with new. Repair lighting. Add (6) new duplex receptacles.
REPLACEMENT OF WATER CLOSETS, KITCHEN SINKS, LAVATORIES, DISHWASHERS AND DISPOSERS
remove (3) closets and 10 linear feet of non bearing partition to increase size of existing room
Renovate 2nd floor of Clinic Building. Replace kitchen cabinets, replace door hardware, paint entire floor, replace selected floor covering, misc. electrical repairs, replace (2) d…
Renovate existing pantry in 2nd floor St. Mary's Home including cabinets, sink,walls, flooring and drop ceiling
Replace kitchen cabinets and counters, appliances and flooring in 3rd floor Bridge Home kitchen
Modification of an existing wireless communications facility, all as depicted on the plans.
REPLACING EXISTING CONVENTIONAL FIRE ALARM SYSTEM ELEVATOR LOBBY SMOKE DETECTORS WITH NEW ADDRESSABLE SMOKE DETECTORS. REMOVING CONVENTIONAL SMOKES AND WIRING AND USING SAME LOCATI…
remove and replace roof at kitchen
Wire ( 2 ) bathrooms for lighting GFI receptacles and overhead lights
5th Floor, two bathroom renorvations. Norel is installing (2) fire alarm strobe lights and (2) system fixed temp heat detectors, in each bathroom. No print is beng submitted.
remodel existing bathrooms and adding toilets and lav sinks
Installation of Co Gen gas boiler system in boiler room
remodel (2) existing bathrooms within existing footprint on 4th floor, North Wing
gas pipe to co-gen system
add domestic water to cogen system
Modification of an existing wireless communications facility located on the existing building to add three communications dishes all 18" in diameter, cabling, and radio communicati…
Replace fire alarm system on section of 4th floor of main building and tie into existing panel
Install 11 plumbing fixtures on 4th floor.
Remodel an existing bathroom, add a 1/2 bath and a bath, remodel laundry area and revise layout of 4 rooms
Main Building of St. Marys Women and Childrens Center, 4th Floor - new lighting, outlets and switches.
Interior demo of non bearing partitions to expose utilities so final design can be completed for future project under seperate permit