Building permit intelligence · Boston, MA
95 Needham Rd has 29 municipal building permits on file in Ward 18. The latest recorded activity was a plumbing permit dated Jan 8, 2026. Permits at this address represent $100K–$500K in total declared construction value. PropertyLabs also identified 2 mapped permits within 500 m of this address.
Plumbing
Gas
Plumbing
Plumbing
Gas
Gas
2 mapped permits within 500 m, shown on the intelligence map above.
5 other addresses on Needham Rd with municipal permit records in Boston.
This address has 29 permit records in PropertyLabs' public history and is located in Ward 18. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 3, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 95 Needham Rd is dated Jan 8, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 95 Needham Rd in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Plumbing
Gas
Gas
Gas
Plumbing
Plumbing
Plumbing
Gas
City of Boston
City of Boston
City of Boston
City of Boston
Provide 1 Temporary Tents Each 20’x40’ (capacity 19each) No sidewalls. For Covid19 compliance per CDC guidelines
My Way Cafe Kitchen Renovation
Kitchen area new plumbing piping configuration for existing equipment.
Kitchen area new gas piping configuration for existing equipment and new equipment.
City of Boston PFD #7214-D - Renovation of school kitchen area including finishes and equipment
City of Boston-owned property - fees waived Install 40-gallon gas water heater at Upper Roosevelt School.
Fees waived - City-owned property. Installation of a new 40-gallon gas water heater
ELECTRICAL MAINTENENCE AT FRANKLIN D. ROOSEVELT UPPER SCHOOL.
Erect 15 October 2013 one temporary stage 12'x20'x2'high with 2ea staircases(handrails) for School presentation. Stage is outside at tennis courts. (This is Roosevelt School)REMOVE…
Annual maintenance permit.
Annual Maintenance