Building permit intelligence · Boston, MA
99 Summer St has 194 municipal building permits on file in Ward 3. The latest recorded activity was a intren permit dated Jul 21, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 2 mapped permits within 500 m of this address.
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Roofing
Electrical
Fire Alarm
2 mapped permits within 500 m, shown on the intelligence map above.
12 other addresses on Summer St with municipal permit records in Boston.
This address has 194 permit records in PropertyLabs' public history and is located in Ward 3. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 99 Summer St is dated Jul 21, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 99 Summer St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Other
Fast Track Application
24-013 O'Mahony & Sons is providing new light in a stairwell infill and add 2-new repectacles.
Renovations - Interior NSC
Plumbing
Low Voltage
Plumbing
Plumbing
OME will be removing 14 existing down lights then clean / replace.
OME will be installing light fixtures that the owener will be providing along with cleaning and relamping of existing fixtures.
Renovations - Interior NSC
Renovations - Interior NSC
Fire Alarm
Fire Alarm
Fire Alarm
Other
Low Voltage
Fast Track Application
Fast Track Application
Fast Track Application
Fast Track Application
Renovations - Interior NSC
Low Voltage
Fire Alarm
Fire Alarm
Electrical
Plumbing
Electrical
Electrical
Electrical
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Electrical
Fire Protection/Sprinkler
Renovations - Interior NSC
Electrical
Electrical
Renovations - Interior NSC
Interior/Exterior Work
Renovations - Interior NSC
Office, Retail, Garage, Penthouse, Include Computer Facility, and Gymnasium (Yoga Studio) No Seat;Certificate for: Office - 10th flALT1208878 issued 8/2/21
Plumbing
Fire Alarm
Electrical
nonstructural interior demolition and removal of ceiling tile, grid lighting, floor finishes &; nonbearing drywall partitions, doors &; frames. There will be no alterations to the…
Electrical
Interior/Exterior Work
Interior renovations include patching drywall and painting where water damaged occurred. Work to be completed on floors: 1, 2, 3, 4, 6, 7, & 8
Install wiring within office cubicles on 8th floor for Ocean 1st Bank.
14 telecom drops on the 8th floor of 99 Summer St for tenant Ocean Bank (RS217784)
Installation of new heat detectors and control modules for the initiation of Phase 1 Elevator recall on Elevator 1-P-6396.
Upgrade of cosmetic finishes to existing office suite to include carpet & paint
Installing 19 new devices on an existing tenant floor for new tenant - spec suite
Installation of plumbing for a kitchen sink on the 10th floor,
install data cables for furniture
add outlets floor boxes and furniture feeds
Xodus - Construction of new conference room, replacement of flooring, ACT ceiling, carpet and glazing. No structural, No fire alarm, No sprinkler, No exterior work.
Renovations of existing office space
This is a TWO FAMILY. Due to young children in the premise one of whom is special need, we put a fence on the property.
New fire alarm devices being added to the existing system at 99 Summer Street for elevator mod.
Interior renovation's to include new GWB partitions and upgrading architectural finishes (ACT, flooring, painting, millwork). Work to also include relocating sprinkler heads and ad…
Installation of new 60A sub-panel, new lighting, GFCI outlets, and wiring with thermostat to motorized damper in Machine room for garage elevator. Also new Light and GFCI outlet in…
The project consists of minor interior demolition, including make safe and removal of MEP's. The balance of the project will include a full renovation of the space with new archite…
Installation of two sets of halo-lit letters reading "The Mark" 16-1/16" x 94", two sets aluminum letters reading "99 summer" 17-11/16" x 19-1/4" and two crash bars for garage entr…
Electrical Make safe on the 9th floor
Removal and disposal of interior finishes and non-load bearing partitions as noted. MEP systems to remain in place. This permit is for interior demolition only. Leave space in whit…
Office renovation on the 8th Floor of 99 Summer Street to include selective removal of finishes, ACT, drywall, carpet, paint, millwork, and minor MEP upgrades as necessary. No fire…
renovation to 8th floor tenant space
Office, Retail, Garage, Penthouse, include Computer Facility and Gymnasium (Yoga Studio) Certificate for: Office(s) -;17th floor ALT995251 issued: 9/6/19
Removal of a kitchen sink and reinstall a new one on the 17th Floor,
Installation of (25) New CAT 6 plenum rated cables relocation of several existing CAT 6 cables for LAN and VOIP use
Installing 2 new Fire Alarm Device in and existing tenants space for new tenant (Level ATS)
Partial office renovation located on 17th floor.
Interior renovations to include removal of GWB partitions, and relocating sprinkler heads.Construction to include new GWB partitions.Upgrading architectural finishes (ACT, flooring…
Office Retail, Garage, Penthouse, include Computer Facility and Gymnasium (Yoga Studio) no seat; Certificate;For: Yoga Studio ALT924038;- 5/1/19
Install new sign and temp banner as per the drawings eplan
Run low voltage cable for data and speaker outlets
Office Retail, Garage, Penthouse, Computer Facility Certificate for 15th floor Common Corridor. ALT922721 Issued 2/20/19
Office Retail, Garage, Penthouse, Computer Facility. Certificate for 15th floor Offices. ALT920641 Issued 2/12/19
Office Retail, Garage, Penthouse, Computer Facility Certificate is Office 15th Floor. ALT920629 Issued 2/12/19
Installation and programming of low voltage card access system
low voltage cabling
Wiring of (9) Sets of Furniture for Peloton via existing power infrastructure.
Core Power Yoga Studio Fit-Out
Wiring for cubicles
Install fire alarm wiring and devices for the tenant fit up of Core Power Yoga
Tenant fit up for Core power yoga
Change Occupancy to Include;a Gymnasium for Yoga Studio no seats on ground floor by;INTERIOR RENOVATION OF A TENANT (A-3) ASSEMBLY SPACE ON THE GROUND FLOOR OF AN EXISTING BUILDING…
16th Floor new HVAC and power
Installation of CAT 6 plenum cable for network use.
Installation of plumbing for a kitchen sink on the 15th floor,
Installation of plumbing for a kitchen sink on the 15th floor.
Install wiring within office cubicles on 16th floor for In Touch
Installing 33 new Fire Alarm devices in an existing space for new tenant (Peloton)
Installing 14 new Fire Alarm Devices in an existing tenant space for new tenant (Phaidon)
Installing 1 new fire alarm device in an existing common corridor
15th Floor Common Corridor new power and lighting
Phaidon 15th Floor new power, lighting
Peloton 15th Floor. New Power, lighting, panelboards and transformer
Office, Retail, Garage, Penthouse, include Computer Facility Certificate for the 7th floor Office(s) ALT896455 issued: 11/21/18
33 telecom drops for tenant In Touch Group on the 16th floor of 99 Summer St.
Interior renovations of common area corridor to include new GWB partitions, upgrading architectural finishes (ACT, flooring, painting, millwork), relocating sprinkler heads, and ad…
REPLACE DISHWASHER
Renovation
Interior renovations to include removal of GWB partitions and relocating sprinkler heads. Construction to include new GWB partitions, upgrading architectural finishes (ACT, floorin…
Interior renovations to include removal of GWB partitions and relocating sprinkler heads. Construction to include new GWB partitions, upgrading architectural finishes (ACT, floorin…
Install wiring within office cubicles on 7th floor for Dewberry
Installing 20 new Fire Alarm devices in existing tenant space for new tenant Dewberry
Construction of two new offices and one closet to existing open office area.
installation of plenum rated cat 6 data cable for network and voip use
kitchennette
Renovation
Interior renovations to include removal of GWB partitions, and relocating sprinkler heads. Construction to include new GWB partitions. Upgrading arch. finishes (ACT, flooring, pain…
removal of suspended ceiling tile, ceiling grid, gypsum wall board & floor finishes
Office, Retail, Garage, Penthouse &;;Computer Facility; Certificate for the 16th floor;(Spec Suite) ALT833398 issued: 6/8/18
First floor interior select removal of suspended ceiling tile, ceiling grid, removing three walls to open space, paint;&; floor finishes.
Installing 12 new devices in existing tenant space for new tenant
kITCHENETTE
Renovation Fit Out
99 Summer st 16th floor (Spec Suite) - Interior renovations to include removal of GWB partitions, glazing partitions and turning sprinkler heads upright. Construction to include ne…
Office, Retail, Garage, Penthouse,;Computer Facility and Café w/takeout in lobby Certificate For: Lobby, Mezzanine &; the Grab -n- Go(take out food services);on the 1st floor.; ALT…
Installation of audio visual devices and wiring
Install wiring within office cubicles on 5th floor for Kahn Lincoln
Office Retail, Garage, Penthouse, include Computer Facility Certificate for the 17th floor offices (Aflac) ALT793320 issued: 1/25/18
Installation of new signage per BPDA Design approval;;;;;;;;;;;;;;;;;;;;;;;;; E- Plans
17th Floor. Aflac Installation of DATA AND SECURITY WIRING
Office, Retail, Garage, Penthouse,;Computer Facility and Café w/takeout in lobby Temporary Certificate for the Lobby, Mezzanine &; the Grab -n- Go(take out food services);on the 1s…
Repair flooring, replace ceiling tiles, install Slatwall panels and cabinets with granite countertop
Additional work to ALT672612 at the 1st floor level to build out a storage space for Strega "grab n go". Work to include; electrical, mechanical, FA and FP.
Installation of Plumbing for a kitchen sink on the 17th floor,
Installing 5 new fire alarm devices in existing tenant space for new tenant (Aflac)
Job#18-050, 99 Summer St. 3rd Floor, Hearts on Fire Showroom Refresh. Replacement of Thirteen (13) Downlights and Related Branch for New Showroom Layout.
Tenant Fit-Up
Renovations of existing space on the 3rd Floor for Hearts on Fire. Work includes minor demolition, drywall, patching, flooring, ceilings. No Sprinkler work.
Office Retail, Garage, Penthouse, includes Computer Facility Certificate for offices on the;5th floor ALT763172 - issued: 10/18/17
Suite 952, Demo and make safe open office area. Disconnect and relocate (8) light fixtures and (8) light switches.
9th floor suite 952. remove existing walls to create workday space. Frame new wall
99 Summer Street, 17th floor - Renovations to Aflac to include demolition of GWB partitions and construction of new GWB and glazing partitions. Upgrading architectural finishes (fl…
99 Summer Street, 12th, 13th, 14th floor - Water damage repairs to include removal of water damaged GWB, carpet, and ceiling tiles. Patch and paint new GWB on damaged areas. Instal…
Installing 5 new fire alarm devices in existing tenant space for new tenant (KLR)
Office retail, garage, penthouse, include computer facility C/O-For Offices - 10th Floor alt737515 issued 8/16/17
Electrical work as required for office expansion.
Interior renovation to existing tenant space on the mezzanine level. Work to include; MEP's, sprinkler and FA as well as architectural finishes. All work in conjunction to ALT67261…
Kitchen sink and water heater at mezzanine level
99 Summer Street, 5th floor - Interior renovations to KLR to include demo of existing drywall partitions, ACT, and flooring. Construction of new drywall and glazing partitions. Upg…
Office retail, garage, penthouse, include computer facility COO for Offices (2nd Floor - Cushman &; Wakefield) Alt732126 issued 8/2/2017
Installation of plumbing for a kitchen sink.
LPR LS desk Change Occupancy by ;adding;"take out food services" on the 1st floor lobby area. ;
Installing 15 new fire alarm devices in existing tenant for new tenant (W.R Berkley)
WR Berkeley - 10th Floor -; ;Interior renovations to existing commercial space to include upgrading architectural finishes (flooring, ACT, glazing, millwork, painting) and MEP's. L…
renovation to the 2nd floor
Cushman and Wakefield - 99 Summer Street, 2nd Floor, demolition of existing architectural, plumbing and electrical finishes. New work to include new architectural plumbing and elec…
Install 40 Gallon, Gas, Power Vented Hot Water Heater.
Install 40 Gallon, Gas, Power Vent Hot Water Heater
to install 1 sink and 1 water heater on the 2nd floor of 99 Summer St
99 Summer Street, 2nd Floor - Electrical make safe. Demolition of select drywall partitions, carpet and architectural finishes. No life safety work.
99 Summer St - Curtainwall facade renovation. Work in conjunction with ALT672612
Remove and replace interior finishes of 2 existing offices on the second floor suite counter 201
Office Retail, Garage, Penthouse &;;Computer Facility; Certificate for the;11th Floor Spec Suite ATL677267 issued: 2/3/17
Removal / disposal of ceiling tile, ceiling grid, wall board and associated metal stud.
99 Summer St, 10th Floor Spec Suite - Interior renovations to existing tenant space to include upgrading architectural and MEP Finishes. FA and Sprinkler Included
99 Summer St lobby renovation
new sink & heater
Installing new fire alarm devices in existing tenant space (Spec Suite)
Office, Retail, Garage, Penthouse, includes Computer Facility Certificate for the Offices -;6th Floor Roof Deck;;Suite #601 - Only ALT530979 issued: 4/2/16
Renovation to lobby and mezzanine area to include lobby finishes and storefront. Work to include; concrete, glass, lighting and MEP's. Modifacations to restrooms as well.
99 Summer St, 11th Floor Spec Suite - Interior renovations to existing tenant space to include upgrading architectural and MEP Finishes. FA and Sprinkler Included
99 Summer St, 2nd Floor Spec Suite - Interior renovations to existing tenant space to include upgrading architectural and MEP Finishes. FA and Sprinkler Included
Maintenance electrical repairs and installations on a annual basis.
Office, Retail, Garage, Penthouse, includes Computer Facility Alt479198; Temporary Certificate for the 6th Floor Roof Deck;;Suite #601.; TCO expires on 1/5/2017 pending completion…
Office Retail, Garage, Penthouse,;Computer Facility Alt479198; Certificate for offices on the 2nd floor (Covington Associates) ALT616577 issued: 8/12/16
Covington Associates - 99 Summer Street - Interior renovations to existing tenant space to include minor demo, upgrading architectural finishes and MEP's. FA and minor Sprinkler wo…
6th Floor Roof Deck- Suite 601- Installation of new wood roof deck under 700 square feet.
Offices, retail, garage, penthouse, computer facility Certificate of Occupancy for;Offices (18th Floor); ALT406682, issued: 9/18/14
New fire alarm devices being tied into an existing FA System for Jimmy Johns on the 1st floor of 99 Summer Street.
Rework interior office entry on 4th Floor for Hearts on Fire. No Fire Alarm or sprinkler work.
Office, Retail, Garage, Penthouse, Include Computer Facility Temporary Certificate of Occupancy for the 6th floor office.; TCO valid for 30 days; 1/30/16;pending completion of perm…
Demolition of interior of existing restaurant to a new restaurant, pending issuance of ALT495534 that includes take out.
increase service from 30amp to 60amp 480 volts 1st floor
new tel/data wiring
floor six. install shower,sink and elec hot water heater.
Audio Visual cabling on the 6th floor
99 Summer-Autotask - 17th Floor- Removal of 20' of interior GWB and add 10' of interior GWB partitions to single office, new acoustical ceilings, and new carpet/paint.
tel-data cabling
15-214 Cannon Design