Signal 01
Permit volume
479 municipal records were represented across 414 distinct addresses. Filing activity is an administrative signal, not confirmation that construction started.
Track this market's permit activity and move from research to live project intelligence.
Start free trialSan Antonio recorded 479 permit records across 414 distinct addresses. Tree Affidavit Permit led the permit mix, with $3.1M in usable positive permit-record estimated value.
permits recorded
479
distinct addresses
414
declared value disclosed
$3.1M
Longitudinal tape
The newest edition carries its published history forward. Country changes use only cities with active reports in both adjacent periods, preventing source-universe changes from masquerading as market movement.
| Week ending | Permits | WoW | Breadth | Disclosed value | Basis |
|---|---|---|---|---|---|
| 2026-09-27Latest | 479 | +3.7% | 414 addresses | $3.1M | Same city |
| 2026-09-20 | 462 | -2.5% | 420 addresses | $6.2M | Same city |
| 2026-09-14 | 474 | +0.6% | 419 addresses | $134K | Same city |
| 2026-09-06 | 471 | +0.6% | 402 addresses | $5.6M | Same city |
| 2026-08-24 | 468 | +82.1% | 404 addresses | $16.4M | Same city |
| 2026-08-13 | 257 | -21.9% | 216 addresses | $4.0M | Same city |
| 2026-08-06 | 329 | Baseline | 229 addresses | $1.3B | Baseline |
01 // Signal board
A filing-level read of the current window. Permit activity is a municipal record signal, not proof of financing, procurement, construction start or completion.
Signal 01
479 municipal records were represented across 414 distinct addresses. Filing activity is an administrative signal, not confirmation that construction started.
Signal 02
The previous PropertyLabs city edition shows 479 records versus 462 in the prior period, a +4% change. One-week moves can be amplified by municipal release cadence and batch timing.
Signal 03
San Antonio ranked #8 of 26 covered U.S. city editions and represented 5.3% of this country cohort. This is a PropertyLabs covered-market comparison, not national market share.
Signal 04
Tree Affidavit Permit led the local taxonomy with 59 records. Municipal categories are interpreted within each source rather than standardized into a direct economic comparison.
Signal 05
$3.1M in usable positive permit-record estimated value was retained after the weekly data-quality rules. Positive-value coverage was 0.6%. This is a screening measure, not final project cost.
Signal 06
CD 0 appeared most often among records with a populated community field. This is filing concentration, not investment market share.
Signal 07
11670 IH 10 E, City of San Antonio, TX 78109 carried the largest usable positive permit-record estimated value at $3.0M on permit COM-BLG-PMT26-40200299. The filing does not establish final project cost, financing, procurement, construction commencement or completion.
02 // Deep dive
Read the week in sequence: what entered the municipal record, what is unusually concentrated and where the signal can be qualified further.
Tree Affidavit Permit was the leading permit type with 59 records. 65 additional filings occurred at addresses appearing more than once.
Permit taxonomy, release cadence and status fields vary by municipality. Those source differences are treated as context, not as economic findings.
11670 IH 10 E carried a $3.05M commercial new-building permit identified as BOSS JCB. Value disclosure is sparse in the San Antonio feed, so this filing dominates the usable dollar total.
The published period comparison moved up 4%, but weekly permit batches should be read alongside the underlying addresses and project types.
$3.1M of usable positive permit-record value was disclosed after the established anomaly and duplicate-value exclusions.
Watch whether tree affidavit permit filings persist under the same source regime and whether activity broadens beyond CD 0.
Contractors, lenders, brokers, developers and investors can use highlighted addresses and permit classes to qualify project scope, counterparties and timing before outreach.
A permit is an early administrative signal. It does not establish financing, procurement, construction commencement, final cost or completion.
03 // Source desk
PropertyLabs organizes municipal records for research. Material conclusions should still be checked against the source municipality and the local methodology before they are used in underwriting, procurement or outreach.
04 // Research pathways
Move from national context to city filings, methodology and audience-specific workflows without leaving the research graph.
From weekly signal to live record
Search the underlying permit records, addresses, applicants and contractors in PropertyLabs, then verify material facts against the municipality before acting.
Longitudinal research
Edition 7 of 7