Building permit intelligence · Boston, MA
1-3 Appleton St has 10 municipal building permits on file in Ward 5. The latest recorded activity was a gas permit permit dated Aug 27, 2024. Permits at this address represent $100K–$500K in total declared construction value. PropertyLabs also identified 17 mapped permits within 500 m of this address.
Gas cooktop replacement 3 appleton .Unit 602
Kitchen remodel. New cabinets and appliances. Existing layout.Work in Unit #602
Remodel existing kitchen at 3 Appleton St, Unit 602. Replace existing cabinets, countertops and appliances. Same layout and footprint. Walls, ceiling and flooring to remain. No str…
3 Appleton Street Unit 204 Kitchen and Bathroom renovation same locations, new flooring, trim and paint.
Install (3) replacement faces to existing marquee; Install (2) replacement awnings with graphics eFileSELDC # 22.1072 SE
17 mapped permits within 500 m, shown on the intelligence map above.
12 other addresses on Appleton St with municipal permit records in Boston.
This address has 10 permit records in PropertyLabs' public history and is located in Ward 5. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 4, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 1-3 Appleton St is dated Aug 27, 2024. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 1-3 Appleton St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
3 APPLETON UNIT 403 REPLACE SUB PANEL WIRE THE OFFICE ROOM
Renovation of bathroom and bedroom
Relocate fire alarm horn/strobes on 3rd floor.
Install a groundwater observation well in a boring up to 25 feet deep in the sidewalk area. The well will consist of a 2-inch diameter Schedule 40 PVC pipe. The observation well wi…
Gas pipe two fireplaces.
Short Form Bldg Permit · ROOF · Jul 30, 2026