Building permit intelligence · Boston, MA
10 Saint James Av has 173 municipal building permits on file in Ward 5. The latest recorded activity was a electrical permit permit dated Jul 28, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 14 mapped permits within 500 m of this address.
Connecting 52 office cubicles at 10 Saint James Av, 8th floor, Boston for Baupost.
Renovations - Interior NSC
Low Voltage
Low Voltage
Low Voltage
Low Voltage
14 mapped permits within 500 m, shown on the intelligence map above.
2 other addresses on Saint James Av with municipal permit records in Boston.
This address has 173 permit records in PropertyLabs' public history and is located in Ward 5. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 3, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 10 Saint James Av is dated Jul 28, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 10 Saint James Av in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Fast Track Application
Fast Track Application
Fast Track Application
Fast Track Application
Fast Track Application
Fast Track Application
Fire Alarm
Fire Alarm
Fire Alarm
Fire Alarm
Fire Alarm
Fire Alarm
Fire Alarm
Fire Alarm
Fire Alarm
Fire Alarm
Fire Alarm
Fire Alarm
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Electrical
Renovations - Interior NSC
Fast Track Application
Fast Track Application
Renovations - Interior NSC
Low Voltage
Plumbing
Remove and replace 635 existing fixtures with new LED fixtures Floors 16, 17, 18, 19 and 20th
Refresh of existing office space on floors 16, 17, 18 & 20 to include selective demolition and new paint and carpet. No involvement with MEP and fire alarm systems.
Install (1) 30" x 30" D/S blade sign and (1) 24" x 119.25" wall sign. Logos and lettering to be internally illuminated. Aluminum backer will not light. EPLAN
Install outlets for bathroom automatic faucets and relocate exit signs
Install 15 Lighting fixtures and 4 switches in vacant tenant space on the 10th floor
Remove interior finishes in 15,500 SF of 10th floor space for future tenant build out.
Installation of card access system for Wayfair/Toast spaces on floors 3, 7, 8 & 9. 20-354
Relocate (1) Existing Smoke Detector on the 6th Floor.
to install new kitchen sinks, 30 lavs, 36 water closets, 9 urinals, 10 water heaters @ 10 St. James Ave on , 3rd,4th, 5th, 7th, 8th,9th floors.
New fire alarm devices for Wayfair Office fit out on the 3rd, 4th, 5th, 7th, 8th & 9th floors.
New power and lighting for Wayfair Office fit out on the 3rd, 4th, 5th, 7th, 8th & 9th floors.
Offices, retail &; storage Certificate for;;Offices &; Conference Rooms on the 18th &;19th Floor-Only;; Alt907471 issued 1/3/19
Job# 19-0051-10 Baupost-LV Tel Data
Install the following tents on St James St on 6/9 for the Boston Pride Block party- 5-10x10, 5-10x20
Plumbing renovation at 10 St. James Ave (Holland & Knight WH)
Baupost 19-0051-10 90 data wiring devices
Partial Renovations
Baupost Group - 18th &; 19th Floors -; Work includes installation of a new;internal stair between 18th &;19th Floors.; ;Construction of new Offices &; Conference Rooms on the 19th…
Offices, Retail and Garage Certificate For Offices - 11th, 12th, 14th &; 15th-Floors - Only Alt79331; issued 2/12/18;, SF 793330;issued 1/16/18; ;
Office reconfiguration on 16th-19th Floors to turn existing offices into work stations &; conference room into private offices. Work includes selective demo of existing private off…
Excavate five test pits required to inspect foundations and wood piles, reinstate the work areas on completion.
Offices, Retail and Garage Temp.Certificate For: Offices - 11th &; 12th Floors - only.** Valid for 90 Day; Expires 8/24/18 pending completion of permit** Alt79331 - 2/12/18 ;
HOLLAND AND KNIGHT 10 ST JAMES FLOORS 11, 12, 14 AND 15 JOB NUMBER 18-0085-10 LOW VOLTAGE ACCESS CONTROL , CCTV 4 FLOORS
Holland & Knight Floors 11-12-14-15 18-0085-10
Control wiring of HVAC equipment of an office fit up @ 10 St James. Floors 11, 12, 14 + 15
Plumbing Renovation - 10 St. James Ave - Floors 11, 12, 14, 15
Up-Grades to existing Tenant space as per plans for Holland &; Knight. ;
Renovation to existing Tenant space on 11th & 12th Floor (Holland and Knight)
Renovation to existing Tenant space on 14th & 15th Floor (Holland and Knight)
Renovation to existing vacant tenant space on 14th/15th Floor (Holland & Knight)
Renovation to existing tenant space on 11th & 12th Floors (Holland & Knight)
Begin Construction and demolition of areas on floors 11,12,14,15 for tenant upgrades
45 telecom drops on the 10th floor of 10 St. James for tenant Holland & Knight
S18-197, connect jumpers, receptacles and plug in base feeds for office workstations @ 10 Saint James Ave 12th floor for Holland & Knight.
Offices, Retail, Garage and;Workout Studio Certificate for Fitness Workout Studio-Only ALT607876 issued 5/30/17, SF628734;issued 8/23/16
Tenant fitout for new OrangeTheory Fitness workout studio which will replace one of the;Offices.;Includes new drywall partitions, new ceilings, new restrooms, new shower rooms, rew…
New fire alarm device being added to existing system
Remove and replace lighting and furniture
Offices, Retail &; Garage Certificate for Offices (10th Floor - CBRE) ALT659613 issued 12/9/2016
Partial Office Build Out
Renovate Area on 4th Floor.
low voltage wiring for 13 voice & 4 TV outlets
Remove existing light fixture and install new. Relocate some existing outlets
New fire alarm devices being added to an existing system on the 10th floor for the demising wall project.
Tenant Fit-Out, wire duplex receptacles, GFI receptacles, switches, light fixtures and (1) disconnect switch
CBRE - 10th floor Build demising wall for tenant space work include drywall partition, electrical, sprinkler and finishes
Installation of plumbing piping and fixtures
At Risk permit pending issuance of ALT607876 for tenant fitout for New Orange Theory Fitness
Offices, Retail &; Garage Certificate for Liberty Mutual - 9th floor offices ALT545825 issued: 12/21/15
Remodel conference room on the 6th floor for Liberty Mutual
Liberty Mutual - 9th floor build out of offices drywall partition, structural reinforcement, HVAC, electrical, sprinkler, plumbing and finish work
Offices, Retail &; Garage COO for Offices (6th &; 8th Floors) Alt493815 issued 7/29/2015
Offices, Retail &; Garage COO for Liberty Mutual;Offices - Floors;2, 3, 4, 5, 7, 8A &; 8B ALT273198, issued: 10/21/14 -- A391515, issued: 9/12/14 - A407123, issued: 10/3/14, A42443…
INSTALLATION OF LIGHTING AND POWER FOR LEVEL 7
Installation of new fire alarm devices for level 7
Offices, Retail &; Storage Temporary Certificate of Occupancy for Liberty Mutual Restack - Floors;4 &;;half of the 5th floor (5B).; 5th floor; 5C.;- Second Floor Connector, Adding…
Liberty Mutual -;;2nd Floor -; Office renovations.; Work includes new walls, carpet, ceiling, fire partition/ fire shutter to other building.; Modify existing;MEPs, Fire Alarm, and…
Liberty Mutual - 6th &; 8th floors new buildout for offices work includes: drywall, electrical, HVAC, sprinkler, plumbing, structural steel, and finish work
Reconfiguration of an 18th floor office to include new carpet, paint, ceilings & millwork fronts.
Temporary generator power and electrical distribution for the Boston Pride Block Party event on June 14th of 2015.
Selective Demolition of walls, carpet, ceilings and MEPs on the 6th Floor
Liberty Mutual Restack - 7th Floor -; Interior fit up of new walls, carpet, ceilings, Mechanical, Electrical and Fire Protection;;;;;;;;;;;;;;
Offices, Retail &; Storage Certificate of Occupancy for the;The Baupost Group's 20th Floor Offices &; Conference Room ;ALT371715, issued: 6/19/14 &; A420058, issued: 11/25/14
Interior Demolition of existing walls carpet and ceiling.
Legal Occupancy:; Offices, Retail &; Storage. doc. #Alt82541/2011 Temporary Certificate of Occupancy for Liberty Mutual Restack - Floors 2, 5A, 8A &;;8B.; TCO valid until 9/1/15;pe…
Liberty Mutual Restack - 8th Floor -; Interior demolition of walls, carpet and ceilings. Build new walls, ceilings, carpet, millwork and MEPs, Fire Alarm &; Sprinklers;for new Offi…
Liberty Mutual Restack - 5th Floor -;;;Amend Alt273198 -; Buildout of new walls, ceiling, ACT, tile, carpet, millwork, MEPs, Fire Alarm &; Sprinkler relocates;
Added construction of Baupost 20th Floor reception area to include new flooring, lighting &; ceilings. (Previous review was performed as a Fast track by K.Y.)alt297608
REVISIONS TO PARTIAL 8TH FLOOR LIGHTING ,POWER AND FIRE ALARM
Remodel of partial 8th floor for power, lighting and fire alarm
Liberty Mutual Restack - 8th Floor - Amend alt273198 to do: selective demolition of existing ceilings, carpet and drywall, all millwork, all finishes, MEP, Fire Alarm / Sprinkler w…
Liberty Mutual Restack -; Interior renovations to the 5th Floor. Selective demolition, new walls, ceilings, minor Structural, MEPs, Fire Alarm / Sprinkler work, paint and carpet
Legal Occupancy: Offices, Retail &; Storage COO for the offices on the;19th Floor ALT323139, Issued: 2/10/14
Offices, Retail &; Storage C/O-For Offices - 18th. Fl.;- only alt 295424, issued 11/8/13;
Offices, Retail &; Storage COO for the office space on the 18th floor ALT297608, Issued: 10/29/13 ;
relocate approximately 30 data cables
relocate approximately 25 data cables
Construction of an auditorium at The Baupost Group's 20th Floor office space. Work to include new architectural finishes including paint, carpet, ceiling, raised flooring and MEP u…
Bond/ground (1) temporary 33 KW generator for the Boston Pride Day Festival.
Architectural & MEP upgrades to The Baupost Group's 16th Floor Office Space. Work to include new paint, carpet, partitions & lighting.
Architectrual & MEP upgrades to The Baupost Group's 17th Floor office space. Work to include new paint, carpet, partitions & lighting.
Temporary generator and electrical distribution services for the Boston Pride Block Party event on June 15th of 2014.
Install 142 speakers and amp.
installation of lighting and power for floors 2 thru 5
upgrades and installation of fire alarm system and devices to floors 2 thru 5
The Baupost Group;- 19th Floor - Architectural &; MEP &; Fire Alarm &; Sprinkler upgrades to existing Office space. Work to include new carpet, ceilings &; lighting, and all finish…
low voltage wiring to install access control, video and intercon system
low voltage AV
Tel Data Cabling on 18th Floor
Control Work HVAC
Installation of telephone and data cabling
Demo 18th & 19th Floors
Liberty Mutual Restack - Floors 1 thru 5 -; Interior renovation of existing Office space on several floors in the building. Renovations include demo of existing partitions, new Off…
OFFICE RENOVATION
Offices, Retail and Storage Certificate for Office Space on 16th, 17th and 20th floors ALT89776 Issued August 24, 2011
Renovations of existing space on 8th Floor for Liberty Mutual. Work includes demolition, drywall, carpet, patching, painting ceilings, Electrical work. No fire alarm or sprinkler w…
**Sediment Carbon Water Filtration System**
**Sediment Carbon Water Filtration System**
Low voltage wiring to install 3 card readers 20th floor, storage 2026, IT office 2029, and IT office 2030, 2 strobes, 20th floor &; 2 panic buttons.
Offices, retail &; storage CO for Office Space on 17th Floor Only ALT89776,;;Issued: 8/24/2011 - Temp COO to expire on 4/30/13;pending completion per plans.
Sediment Carbon Wwater Filtration System
Low voltage wiring to install (11) card reader packages for; (11) doors on the 20th floor.
8th floor low voltage wiring install (6) card readers, 2 strobes, 1 panic at reception, 1 door release button at reception, 1 aiphone door station at reception entrance, 3 cameras,…
Minor architectural upgrades to The Baupost Group 8th Floor office space. Upgrades to include carpet and paint upgrades to the existing office space.
renovations of existing space on the 3rd floor for Liberty mutual. WOrk includes demolition, drywall, patching, painting, carpet, millwork, HVAC, Electrical, &; sprinkler work.
Low voltage wiring install 13 card reads, 3 pani puttons, 6 blue strobes, 4 door release buttons, install access control panel, install 7 mini dome cameras.
offices, retail, storage C/O-For Offices 16th.fl. -only alt 89776, issued ,8/24/2011 Temporary Certificate (3rd extension), expires - 4/30/13- pending completion of permit.
Low voltage wiring to install access control, cctv and intercom system on the 16th floor.
offices, retail , storage C/O-;For Offices 11,12,14,15-only alt 56462, issued 1/7/2011
installation of plumbing for two kitchen sinks and two half baths,
Low voltage wiring to install splice can 17th &; 20th floor ceiling IDF closets and install IStar panel 17&;20th floors of IDF closets. Input &; output boards.
Build out of 16th, 17th and 20th tenant floors, with new architectural finishes, MEP upgrades and structural steel for interconnecting stairs and sprinkler relocation.
office, retail storage C/O-For Offices 3rd.fl. -only alt 82541, issued 7/12/11;
offices, retail storage C/O-For Offices 3rd.fl. -only alt 82541, issued 7/12/11 temporary certificate-expires - 8/27/2011-pending completion of permit*
Tel Data Work Low Voltage Wiring 3rd Floor with Commodore Builders
kitchen sink water heater installation
demo of existing finishes: misc walls, carpet, misc ceilings. install new carpet, paint, match ceilings. relocate t/d, electrical cir to feed new systems furniture layout. replace…
Install 1 kitchen sink on 4th floor and 1 kitchen sink on 9th floor
Installation of HVAC control wiring for renovation on floors 11, 12, 14 & 15
demo 16th floor
Minor renovation to the 2nd floor. Remove 3 offices and configure into open area. Minor demo, walls, carpet and doors.
Partial renovation to specified areas on floors 11, 12, 14 & 15 for the Law Firm Holland and Night. Lighting, Power and Fire Alarm work.
Partial alteration/renovation to an existing fire alarm system on Floor 11, 12, 14 and 15. Majority of the devices are existing to be maintained. New devices implemented due to roo…
Interior renovations to occupied offices of Holland&; Knight floors11,12,14,15. Revocation of existing sprinkler, VAV , HVAC, Infill of stair and dumb waiter. relocation of wall pa…
Renovations to include new 2" vent line.
; OFFICES, RETAIL , STORAGE C/O-For Offices 2nd, 3rd, 10th- fls. -only permit#02-900, issued 11/ 30/09
Electrical Permit · ELECTRICAL · Jul 29, 2026