Building permit intelligence · Boston, MA
300 Boylston St has 216 municipal building permits on file in Ward 5. The latest recorded activity was a electrical permit dated Jul 10, 2026. Permits at this address represent $5MM–$25MM in total declared construction value. PropertyLabs also identified 1 mapped permit within 500 m of this address.
Electrical
Low Voltage
Low Voltage
Low Voltage
Plumbing
Electrical
1 mapped permit within 500 m, shown on the intelligence map above.
12 other addresses on Boylston St with municipal permit records in Boston.
This address has 216 permit records in PropertyLabs' public history and is located in Ward 5. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 300 Boylston St is dated Jul 10, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 300 Boylston St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Plumbing
Plumbing
Electrical
Plumbing
Plumbing
Plumbing
Fire Alarm
Fire Alarm
Fire Alarm
Electrical
Electrical
Electrical
Electrical
Interior/Exterior Work
Interior/Exterior Work
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Plumbing
Plumbing
Plumbing
Electrical
Fire Protection/Sprinkler
Electrical
Fire Protection/Sprinkler
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Demo, temp power and lighting.
interior demo of space in preparation of future tenant - demo non-structural walls and finishes work address is 63 park plaza
Full scope of work: Mechanical, FA, FP, Electrical and Plumbing. Need to change from approved short form SF1679555 because we are altering the location of the sprinklers inside of…
Unit 603 New primary bath and bedroom branch circuit wiring and lighting new devices.
Remove and replace 1 tub 1 shower 2 lavatory and 1 toilet on 6th floor.
Non-Structural work, 3 bath renovations, kitchen cabinets, new mechanicals, flooring, interior trim and painting
Unit 603. Renovate primary bedroom and bathroom. New fixtures, finishes, cabinetry, lighting and associated electrical work.
FLOOR DRAIN, 2 HANDSINKS
Upgrade of restaurant equipment at 277 Boylston St. Bistro Du Midi Remove sections of wall finish in order to install blocking. Reinstall new wall finishes Electrical hookups to ne…
Bistro Du Midi New branch circuit wiring and sub panel for added appliances to existing kitchen
New branch circuit wiring for new renovation including kitchen , bathroom and new lighting throughout
Remove and replace kitchen sink, lavatory, toilet, shower, washing machine connection, and water heater.
Unit 601 - Kitchen remodel - to extend kitchen cabinets from existing location - Move bathroom sconces - Add misc recess lighting for new cabinet - Replace device in areas worked a…
Sand & Refinish Wood Flooring Replacement of HVAC Units inside the unit Painting No Structural or Sprinkler or Elevator Work Required
Unit 1204. Renovate kitchen, bathroom and primary suite, including plumbing, electrical and reconfiguring partition walls. Select ductwork and HVAC system improvements. Replace exi…
Remodeling. Unit 907. 9th Floor: 1 kitchen sink, 1 garbage disposal, 1 dishwasher, 1 ice maker, 3 toilets, 3 lavatories, 2 bathtubs, and 1 shower stall.
Exploratory Interior Demolition of Unit 704/705 for structural layout of existing structural - located at 300 Boylston St, Boston MA 02116. There will be no structural demolition.
Remodel the master bathroom Remodel the kitchen Replacement all the devices (outlets and switches) and recessed lights trims
Kitchen remodel, new cabinets and appliances Primary bathroom full renovation no layout changes Guest bathroom renovation
Unit 601 - remodel kitchen- dishwasher, disposal, sink remodel full bath- toilet, lav, shower
Old work installation of new led lighting on floating shelves and Millwork outlet relocations.
Demo kitchen and master bath, install new cabinets and appliances, new bathroom finishes and vanity.
Unit #1104. Fabricate and install custom cabinetry in the Living Room and Primary Bedroom as well as electrical upgrades related to cabinetry lighting.
Assembly, Garage, Retail, Health Club, Hair Dresser, Restaurant, 88 Apartments, Office and Mercantile;Certificate for Amenity Space for Residential Use Exercise Area.ALT1516830 Iss…
Assembly, Garage, Retail, Health Club, Hair Dresser, Restaurant, 88 Apartments, Office and Mercantile;Certificate for Health ClubALT1516827 September 22, 2023;
9th floor: Install (1) bath tub, (2) toilets, (2) lavs, (1) washer machine connection
Installation of Cat6 and speaker cable to support Tel/data and music.
Unit#910 Install recessed light fixtures in bedrooms and hallways. Replace baseboard heaters. Install sconces in powder rooms. Replace recessed lights in kitchen, Upgrade devices
Unit #1002. Includes the interior renovation of the unit which will include modifying non-load bearing walls to create a dining room and expanded laundry room. Custom cabinets in s…
Relocate laundry connection and move laundry sink.
New rework of circuits and electrical wiring for new laundry room and closets design
Non-structural interior paint/wallpaper, wood flooring, electrical and tile cosmetic project.
Run circuit for remote panel install electric vehicle charging station for level G-2 parking space 156. Install 2 switches 1 relay and 1 gfci receptacle.
Rework of existing plumbing for 9 exam room sinks, Adding one water closet and one lavatory sink.
Restore power (2) garage (G1 Level) exhaust fans that was damaged. Furnish (2) 20A 3 phase 480V feeds to restore power to G1 exhaust fans.
Basement ground floor demising wall. New power and lighting
Basement level demising wall corridor new & relocated A/V's. New initiating device
Bliss SPA. New power, lighting and panelboard
BLISS SPA Installation and relocation of new and existing AV's & initiating devices
Installation of new storefront door to include glazing and door lock @ Audemars Pigeut.
Change existing light fixtures and existing recessed lights to new lights
Renovation of kitchen and powder in unit #905
Replace shower valve on existing bathtub. Replace vanity and toilet. Replace kitchen faucet and dishwasher.
install 2 cat 6 lines in office of unit 905
renovation of kitchen,office and bathroom
This project entails interior renovations per plans dated June 20, 2023 involving concrete, millwork, doors, glazing, drywall, & interior finishes.
This project entails Level 1&2 Alterations to existing commercial space in an existing 12-story highrise. Project scope includes the construction/installation of nonbearing interio…
Remodel existing kitchen and bathroom in unit 710
Unit 905-Kitchen, Office and Bathroom renovation with updated finishes. No work outside of unit. No sprinkler or FA work required, coverage is existing
Install new mainline disconnect, cab light disconnect, branch circuitry and other wiring associated with elevator modernization in accordance with all applicable NEC and ANSI stand…
Installation of Plumbing for a kitchen sink on the 4th floor
Assembly, Garage, Retail, Health Club, Hair Dresser, Restaurant, 88 Apartments, Office and Mercantile;Certificate for Hair DresserALT1386488 Issued 9/12/2022
sublease of 4th floor space consisting of new 100 amp electrical service ,recircuiting of lighting and power and minor office upgrades
Installation of conduit and fire alarm wiring to support (1) smioke detector, (2) pull stations, (5) speaker strobes, and (2) strobe only devices.
Kitchen renovation
Kitchen Renovation. Replace existing with new, 10 - Recessed Luminaries; 1 - Disposal; 1 - Dishwasher; 1 - Fan Hood; 1 - Microwave; 1 - Wall Oven & 1 - Cook Top.
Unit 1105 Only: Remove existing Kitchen cabinets, fixtures and finishes and replace with new within same space. No structural work.
Replaced water heater in basement
Replace HWH in basement
Replace fluorescent bulbs to led bulbs in common areas of building
Greylock - 4th Floor -; Level 1&;2 Alterations to existing Office space in an existing 12-story office building. The project scope includes selective interior demolition of walls,…
Repair a 60A feeder that was severed during a contractor (Not Driscoll Elec) coring holes.
Install 120 volt hard wired smokes and carbon monoxide detectors per plan, install mini sounders per plan to existing fire alarm system.
Installation of one exterior canopy and channel letter sign for "Legal Seafoods".
Renovate existing space with new receptacles and lighting fixtures.
Reskin the awnings indicating the presence of Legal Sea foods. Hardware to remain the same. We have stamped drawings from BPDA.
New recessed lighting through out In branch circuit wiring for bath hallway closet den and family room
Mario Russo Salon Fitout (75 PARK PLAZA)
Install low voltage pre wire for new av system lighting control and shades.
Low voltage building automation and controls
Remove and replace 1 lavatory. 1 toilet. And 1 shower.
renovation to existing tenant on the 2nd floor
Twin Focus- For work being performed in 75 Park Plaza, in 2nd fl tenant space, selective demo & removal of existing GWB walls & finishes, install new finishes where needed, relocat…
Complete new electrical branch circuit wiring and lighting through out. Low voltage key pad and shade wiring
Level One & Level Two Demo existing and White Box for Future
Unit # 603. Renovation of existing bathroom and replacing select existing doors. Select renovations throughout unit, including refinishing floors, paint, millwork and lighting.
Wire unit complete. Unit 1201
rework plumbing to accept new toilets,lavatories, showers and kitchen sink
Gas test existing main, hook up equipment
Replacement of existing bifold door system. Same size and same MFG. No framing unit is the exact same size. work is not interrupting the sidewalk. working on the fenced outside din…
Provide electrical services required to convert the existing restaurant space at "79 Park Plaza" into a new Legal Sea Foods Restaurant. Including wiring new kitchen equipment, new…
Mario Russo Salon - First Floor -; Renovation of commercial space on the first floor of 75 Park Plaza (also known as 300 Boylston St.). Scope includes ACT, new lighting, millwork,…
Remove and replace 4 lavatories, 3 toilets, 2 showers, 1 kitchen sink, 1 washing machine connection, and 1 electric water heater.
Kitchen and bathroom remodeling
new upgrade for kitchen and install lights
Install new light pole and handhole at 300 Boylston St. Install conduit and wiring to Eversource manhole. Install light & photocell on pole. Install 30 Amp H-Tap in handhole to pro…
Renovation of unit 810 @ eight floor, scope of work is renovating 2.5 bathrooms one kitchen, replacing all plumbing and electrical fixtures, replacing existing floors.
Unit # 1103. A comprehensive interior renovation including new interior finishes for the entire unit, custom millwork throughout, an updated HVAC system, new lighting and paint thr…
S22-451 - 75 Park Plaza, 4th Floor - Monashee - Workstation Electrical Installation of the electrical interconnections between added workstations using provided circuitry
Remove all wiring from unit and install temp stringer lighting and temp power receptacles.
Outlets/switches added to bedroom addition
12th Floor - Unit 1201. Interior renovation of residence. Fire alarm and sprinkler system, plumbing system, mechanical system, electrical system, and appliances to be replaced wher…
Address is actually 280 Boylston St. Apt 311 Replace (2) toilets, replace (2) faucets, replace (2) shower trims, replace kitchen sink faucet. No rough plumbing.
Approved by Condo Association, new enclosed office space added (11 x8 ft). rough framing, insolation, new receptacle run added to new space. Replace carpet with engineered hard woo…
Installing New carpet, Paint, New Light Fixtures, replacing Kitchen counters. Work is on the 4th floor at 300 Boylston (aka 75 Park Plaza) There is no sprinkler, fire alarm, or any…
Installation of low voltage telecommunications cable.
Assembly, Garage, Retail, Health Club, Hair Dresser, Restaurant, 88 Apartments, Office And MercantileCertificate For Offices On 2nd FloorALT1202084 Issued 6/1/2021
All fixture to be replaced but in same location
Strip prep for work areas for ALT 1287447. Partial cost of work is also reflected on ALT1287447.
Renovation to branch power and lighting circuits on the 4th floor for Monashee Capital
300 Boylston Street, Unit 613 Remove & replace outlets, install fixtures, install outlet for kitchen
Remove and replace Kitchen and Bathroom cabinets and fixtures. Replace flooring throughout and replace all light fixtures and outlets with new fixtures. 300 Boylston Street, Unit 6…
DFCI Smith 6. Misc. Low Voltage HVAC Control Wiring - NB - 220095
re-wire electrical
Assembly, Garage, Retail, Health Club, Hair Dresser, Restaurant, 88 Apts, Office and Mercantile;Certificate for Offices - 4th Floor -OnlyAlt 1130700 issued 12/9/20
Project 5117 - Site is 2nd floor 75 Park Plaza Install 36 dual data locations
renovation to the Twin Focus space on the 2nd floor
renovation to the Twin Focus space on the 2nd floor
Plumbing renovation work for TwinFocus at 75 Park Plaza
Upgrading of interior finishes, kitchen & baths; selected electrical & plumbing associated with this work; selected finishes (including drywall, tile, trim, paint wallpaper)
Remodle three bathrooms and one kitchen.
Kitchen and bath renovation
TWINFOCUS - 2nd Floor - For work located at 75 Park Plaza, Expansion of existing tenant space on the 2nd fl for "Twin Focus", including demo of existing space &; build out of new O…
Installing (6) Cat -5 cables and (6) cable connections
Rewire kitchen, two baths and install 45 recessed light fixtures
Renovate two bathrooms and kitchen in unit #606
Installing 4 -110 Volt smokes and 3 combos
Installing 4 -110 Volt smokes and 3 combos
Install wiring within office cubicles on 4th floor for Jackson Lewis PC
Skinner 2nd Floor new notification and initiating devices
Skinner 2nd Floor Demo, Misc power and lighting. New panels and transformer
Installing wiring for lighting, switches, outlets in Unit #606 in Kitchen, living room, hallway library, master bed and bath and replacing 200 AMP panel with new one
Demising wall on the 2nd Floor of 300 Boylston St. Scope includes minor demo of walls and finishes. New work includes new partition wall, patching and paint. Reconfiguration of exi…
Rough wiring for a sound system
Shade wiring
Remodel existing kitchen and bathrooms Install new floors and paint entire unit
New wiring throughout
Assembly, Garage, Retail, Health Club, Hair Dresser, Restaurant, 88 Apts., Office and Mercantile Certificate for: Retail Alt1069290 - 6/25/20 ;
installation of low voltage automation system @ Jackson Lewis, 75 Park Plaza
Access control adding expansion board and 2 card readers
Install 3 kitchen sinks
Remove and replace plumbing fixtures.
Fire alarm upgrades in conjunction with the 4th floor tenant fitout
Renovation to the existing 4th floor Jackson Lewis space consisting of new lighting and power upgrades
Interior demolition and renovation of the existing unit #802. Includes new kitchens and bathrooms with layouts remaining the same. Entirely cosmetic. No walls being removed or stru…
Jackson Lewis PC - 4th Floor - Renovation of existing Office space.; Work;to include : new architectural finishes, ACT, new lighting, new millwork and all new Architectural finishe…
New door slabs and casings throughout unit, new baseboard in 2 bedrooms, replacing existing tile in entryway with new hardwood floors, full gut of 1 bathroom, removing `1 light fix…
low voltage telecommunications cable installation
actual address is 272 Boylston St Boston - install 3 sinks and 1 coffee filter connection -
Assembly, Garage, Retail, Health Club, Hair Dresser, Restaurant, 88 Apts., Office and Mercantile Temp. Certificate for: Retail ** Valid for 90 days, Expire;2/18/2020 Pending Flame…
Replace hot water heater in unit 905
Relocated and add new power receptacle for remodel replace lighting with new LED
Replace hot water heater
Interior renovations to Bistro du Midi Restaurant to include removal of selective Interior finishes/Millwork, Drywall Partitions, Floor Finishes, Plaster Wall Finishes, installatio…
Unit # 1002: Interior remodel including: 2 bedrooms, 2.5 bathrooms, a Kitchen, Gym, Living Room, Den and Dining Room. Modifications to 4 sprinkler heads to accomodate new den and c…
Assembly, Garage, Retail, Health Club, Hair Dresser, Restaurant, 88 Apts, Office and Mercantile Certificate for Units 504;&; 602- Combine Alt 935453 issued 5/23/19
Renovation of two bedroom condo new lighting new devices new kitchen and baths. Unit 1104
Audemars Piquet-Low Voltage HVAC Controls & Security (52 Devices) all security cabling by others-208772- FGK
wiring for power, lighting , hvac for the tenant fit up of Audemars Piquet
remodel of office
S20-501 Electrical power connection and furniture interconnects of office furniture for area workstations using existing circuitry
Interior fit out for a Audemars - Piguet retail store in an existing retail space. Eplan)
install wiring for tel/data, CCTV, speakers, security system for a new tenant fit up
Low voltage telecommunications cable installation
Furnish and install lighting and switching in renovated rooms. Furnish and install furniture feeds to 4 locations.
Cable TV/ Phone Outlets
Install New Fire Alarm Smoke Control Panel
Wiring of low voltage tv jacks and telephone in unit 1203
Add and relocate electrical outlets and lighting. Unit 1203
2nd Floor Suite B - Selective demolition of non-load bearing partitions and ACT. New architectural finishes to include: drywall, flooring, ceiling, and painting. Minor reworking of…
Remove and replace 3 toilets, 4 lavatories, 2 Tubs, 1 shower, 1 washing machine connection, and 1 kitchen sink.
Replacing damaged electrical devices and lights. Adding floor heat, towel heater, 4 recessed light and vanity lights to the master bathroom. Adding a sub panel. Adding 4 closet lig…
Assembly, Garage, Retail, Health Club, Hair Dresser, Restaurant, 88 Apts, Office and Mercantile Certificate for the 2nd floor; Suite 200;; ALT961785 issued: 6/18/19
Relocation of exisitng wiring for new wall
In unit #1105, move one non-structural, interior wall and eliminate a second non-structural, interior wall.
Unit # 1104: Interior renovations will include removal of existing flooring, baseboard, doors, trim, wall paneling and crown molding throughout. Removal of existing built in millwo…