Building permit intelligence · Boston, MA
200 Boylston St has 161 municipal building permits on file in Ward 5. The latest recorded activity was a intren permit dated Jul 17, 2026. Permits at this address represent $5MM–$25MM in total declared construction value. PropertyLabs also identified 1 mapped permit within 500 m of this address.
Renovations - Interior NSC
Plumbing
Plumbing
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
1 mapped permit within 500 m, shown on the intelligence map above.
12 other addresses on Boylston St with municipal permit records in Boston.
This address has 161 permit records in PropertyLabs' public history and is located in Ward 5. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 200 Boylston St is dated Jul 17, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 200 Boylston St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Renovations - Interior NSC
Fire Protection/Sprinkler
Fire Protection/Sprinkler
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Demolition - Interior
Demolition - Interior
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Demolition - Interior
Demolition - Interior
Fire Alarm
Fire Alarm
Fire Alarm
Change Occupancy
Fire Alarm
Change Occupancy
Change Occupancy
Change Occupancy
Change Occupancy
Fire Alarm
Renovations - Interior NSC
Renovations - Interior NSC
Fire Alarm
Fire Alarm
Fire Alarm
Renovations - Interior NSC
Fire Alarm
Fire Alarm
Fire Alarm
Renovations - Interior NSC
Fire Alarm
Fire Alarm
Fire Alarm
Fire Alarm
Fire Alarm
Fire Alarm
Low Voltage
Low Voltage
Lighting and power work associated with refresh/modification to retail entry space
Lighting and power work associated with refresh/modification of hotel rooms on 6th and 7th Floors
Plumbing renovation of the guest suites in Level 7 which includes revising the sanitary and water piping on Levels 5-7 and adding new plumbing fixtures on Level 7. We are also addi…
Removal of one window to create a new vestibule for new retail space. Work to include the installation of a door in the window opening.
Relocate 13 existing sprinkler heads and adding 3 additional sprinkler heads - Non structural work is reflected on Sf1784404
S25-946 Provide Labor and Materials to Make Safe, Disconnect and Replace the existing Fire Pump Controller with new equipment
Adding recess lights throughout condominium, coax lines, circuits for underfloor heat and dedicated circuits for kitchen appliances and other appliances.
Install new fixtures and appliances,in one kitchen and two bathrooms.
two bathroom renovation, kitchen renovation, water heater installation, washing machine connections replacement
Condo renovation. Metal stud framing, drywall work, tiling, hardwood floors, painting. NO STRUCTURAL WORK. UNIT 1216. Building number 220 BOYLSTON
Full rewiring apartment #1216 at 200 Boylston St. All completely new: 2 bedrooms, 3 bathrooms, laundry, kitchen, panel........
Installing the following: Shower valve Kitchen sink (2) toilets Unit 1514 at the Four Seasons Hotel
Unit # 1116. Renovation to the kitchen, [2] bathrooms, and the laundry closet.
New lighting kitchen, new hers bathroom reno new his bathroom reno, News lighting primary bedroom and closet.
Install wiring for 11 low voltage drops, 7 shade drops, and 10 speakers, and install low voltage control wiring for lighting control system.
Demolition of interior drywall walls. No structural work. UNIT 1216. Address is 220 Boylston. DEMOLITION ONLY
Remodel two existing bathrooms, and the existing kitchen. update all doors trim and moldings.
Unit 1014-1016 Install hard wired local smoke detectors throughout unit
Unit 1014-1016. Rewire kitchen, two bathrooms. Add recess lights throughout
Renovation of 1 new kitchen, 2 new full bathrooms
Renovate 3 baths 1 kitchen and 1 laundry
Re-wire full condo unit as part of complete renovation
Provide new direct replacement fire pump head. Install, align and test new pump head.
Bathroom remodel, 1 for 1, fixture location to remain No structural, egress, or sprinkler changes
Unit 810 - Bathroom Renovation - Wire for recessed lighting and 2- wall sconces.
Electrical work in Unit #1120 Replace existing wiring devices and wallplates. Install AFCI breakers as required (No new wiring)
Renovate master bathroom/shower Making cosmetic changes to apartment ie paint, tile and countertops
Replacement of kitchen cabinetry and finishes, renovate master bathroom, 1 full bath, master closet, new floors throughout and new floor tile in entryway foyer. unit 1014 only
Lobby: Wire for recessed lighting (pin spotlights), wire for Wi-Fi access location at front desk, wire for decorative lighting (at bookcase)
ALSO KNOWN AS 220 BOYLSTON ST UNIT #1116 INTERIOR RENOVATION, NO STRUCTURAL WORK OR EXTERIOR MODIFICATIONS. MODIFY KITCHEN, RENOVATE 2 BATHROOMS, LAUNDRY ROOM, NEW WALK IN CLOSET,…
On Median Boylston St at Charles Erect temporary camera platform 8'Dx24'Wx4'h with staircase and railings for Media coverage Celtics Parade Friday 21 Feb 2024 for use 4am-4pm
Provide & Install replacment for existing whalen unit @ 220 Boylston St APT#1514 (Four Season) .
Interior residence lobby renovations. Paint, wallpaper, refurbishing marble floor Provide new cabinets &; counter for work space Replace &; install surface light fixtures No change…
Amend ALT1472620 to remove fire alarm scope.
Interstate Rental Service to erect 16'x16' frame tent with ballasts at 9am on 4/7 with pickup at 330pm on 4/7
We will be completing masonry thruwall and deck waterproofing,; installing a trench drain and 2 small 2 stage drains per the architect @ CambridgeSeven.Short form permit will be ex…
renovation to the 6th floor royal suite
Renovations to the Four Seasons Royal Sweet Room. Changing out furniture, millwork, minor wall changes, paint ect. No Fire alarm Life Safety or Structural work.
To change bathtub to a stand shower. Work to be done at 220 Boylston St.;
install 1 lav, 1 shower, 1 hand sink , and 1 kitchen sink on the 6th Flr
Install 110v smoke/carbon detection for unit 1117 renovation
New lighting and devices for bathroom reno
Install new fixtures in full bath half bath and kitchen
12th floor. Bathroom remodel. New toilet, lavatory sink, and shower installed in same locations as existing.
unit # 1117 - reno of 2 full bathrooms, 2 lavs, 2 toilets, 1 tub, 1 shower reno of 2 half bathrooms, 2 toilets, 2 lavs 1 laundry connection 1 full kitchen, kitchen sink, disposal &…
Bathroom renovation. New fixtures, tile, paint.
Health Club, Pool, Garage, (94) Condo Units, Meeting Facilities &; Hotel Room,;Bar Area- LobbyCertificate For Bar Area- Lobby @ 1st Floor;ALT1323552 Issued 5/25/22
Kitchen & bath renovation
wiring for low voltage due to renovation
Wiring for interior renovation to unit 1117
install new lighting in the kitchen, living room, and dining room
220 Boylston Unit 1210 - full remodel
Unit 1210 (1) Kitchen sink (1) Dish washer (1) Water heater (1) Washing machine (2) Toilets (3) Lavatories (1) Shower (1) Tub and Shower
Health Club, Pool, Garage, (94) Condo Units, Meeting Facilities &; Hotel Room,;Bar Area- LobbyTemporary Certificate For Bar Area- Lobby @ 1st Floor Expires 12/25/2023Alt 1323552 Is…
Bathroom and bedroom remodel with new lighting. Wire 4 replacement Whalen Hvac units.
Bathroom remodel.
One shower to tub conversion; update finishes and plumbing fixtures in same bath. Unit 1220 of the Four Seasons, Boston.
minor interior renovation. no structural or exterior work. new ceiling grid in living room with new recessed lighting. new lighting in Kitchen and Office. Refinish floors. new pain…
Renovate unit #1005. Kitchen and 1 1/2 bathrooms. Lights through out unit.
Temp generator power for film production. (AND ONLY TEMP GENERATOR POWER) Set 8-3-2023
Unit 1210-Installation of new MEPs and finishes, tying into existing building systems. Includes relocation of some sprinkler heads as shown on plans. No changes to egress.
The project work will consist of cosmetic replacement - no structural or exterior work. Select floor and wall finishes to be removed and replaced along with the installation of new…
Install new light pole and handhole at200-220 Boylston Street. Install conduit and wiring to Eversource manhole. Install light & photocell on pole. Install 30 Amp H-Tap in handhole…
Replacement of glass guardrail on 4th floor exterior.
Provide temp fire alarm system during construction per NFPA241 - swap smoke heads for heat heads.
Renovation of lobby areas - furnish and install new panel section for existing to remain panel, install new lighting (part of the package will be furnished by owner and installed b…
22-0204-10 Low voltage cabling Four Seasons Hotel
Renovations of lobby areas - furnish and install new fire alarm speaker strobes and strobe onlys onto existing loop/system.
Renovation of Existing Four Seasons Public Space
Unit #9016 replace lighting, add new switching and quad outlets
Change occupancy to include new Bar area off the Lobby. Renovation of the existing lobby and bar area to include new entry. Work to include; selective demo, MEP's, fire alarm, fire…
Selective demolition, custom millwork, miscellaneous electrical, new countertops and tile, painting and wallpaper. Address: 200 Boylston Street, Unit 9016 No structural change, no…
ERECT GTEMPRARY FRAME TENT 16'X16' FOR CITY OF BOSTON MAYORS OFFICE SPECIAL EVENTS SUNDAY MAY 1, 2022 GREEK FESTRIVAL CITY EVENT
Renovation to the hallway branch lighting and controls on floors 8,9,10,11,12,14,15 and 16.
Install cameras, card readers, at various Samuel's Properties in the Fenway Area
Add (x4) Tele/data outlets outside
Four Season Sanctuary 6th floor ; Add receptacles outside, Lighting & Occ. sensor inside Corridor
Four Season Sanctuary 6th floor ; Add (2) AV's outside & (x1) Av inside
Fixture replacements; rework existing power at kitchen to accommodate new backsplash and counters
Remove and replace kitchen sink for new counter top.
Remove and replace 1) shower, 2) lavatories, and 2) Toilets.
emergency drain pipe repair
emergency repair of drain pipe
Four Seasons Hotel - 6th Floor -; Provide wheelchair access to existing 6th floor terrace space.; Work includes : demolition, concrete, masonry, glazing, finishes, minor plumbing a…
Installation of Roof Drain, Four Seasons
Removal and replacement of existing living room fan coil unit. Necessary plaster, decorative plaster, painting
Remove and replace finishes in pantry and laundry room. Install new cabinets. Paint.
Temporary Power Distribution 3/8/20-3/14/20
Four Seasons 2nd floor Functions rooms Replace existing light fixtures , add (4) new floor boxes ,add (1) run of UC lighting
Temporary Power Distribution 2/2/20-2/8/20
Temporary Power Distribution 2/23/20-2/29/20
Replace existing wood floor and carpet, painting, wallcovering, refinish existing wood work, stone tops, cabinetry, wood doors and trim, drywall, plumbing and electrical.
Bathroom renovation
Removal and replacement of two existing Whalen fan coil units and humidifier. Necessary plaster, painting, tile, and carpentry to repairs areas of work.
bathroom fixture upgrade and water heater replacement
Renovation/Replacement of existing 2nd floor space
BIDMC Urgent Care low voltage HVAC control wiring - 198118 - PAG
Four Seasons Hotel: Low voltage wiring to replace existing Analog Bristol Lounge Podium camera with new IP Mini dome camera.
Unit 9018 kitchen/bath renovation
Temporary Power Distribution 10/6/19-10/12/19
Install new laundry hook up, includes new drain and water line supplies in unit# 1208 Install 2-new Electric Hot water Heaters
Remove and replace kitchen sink.
Temporary Power Distribution for Smartsource 9/22/19-9/28/19
Temporary Power Distribution for Smartsource 9/2/19-9/9/19
Bathroom remodel
Temporary Power Distribution for;Natixis Advisors;;7/21/19-7/28/19
Renovation of shower area and vanity area in the master bathroom .This work includes new plumbing fixtures and tiles -New vanity sinks and counter and new medicine cabinets Also pa…
Temporary Power Distribution for Lawler Rourke Associates Inc.;;7/7/19-7/13/19
Install wiring for new renovation to apartment unit. New kitchen, two bath rooms, add new recess lights through out unit.
Four Seasons Hotel: Low voltage wiring to install new IP camera on the brick column next to the existing Axis camera in the main driveway of the hotel to view those entering Hotel'…
Health Club, Pool, Garage, 94 Condo Units, Meeting Facilities &; Hotel Rooms Certificate for the Four Seasons Hotel -;5 Guest;Suites: 428, 430, 528, 531 &; 631 ALT904231 issued: 3/…