Building permit intelligence · Boston, MA
222 Berkeley St has 199 municipal building permits on file in Ward 4. The latest recorded activity was a electrical permit permit dated Jul 29, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 15 mapped permits within 500 m of this address.
Electrical Work Associated with tenant Fitout on the 7th Floor
Electrical
Electrical
Interior/Exterior Work
Interior/Exterior Work
Interior/Exterior Work
15 mapped permits within 500 m, shown on the intelligence map above.
4 other addresses on Berkeley St with municipal permit records in Boston.
This address has 199 permit records in PropertyLabs' public history and is located in Ward 4. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 3, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 222 Berkeley St is dated Jul 29, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 222 Berkeley St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Electrical
Electrical
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Fire Alarm
Electrical
Electrical
Plumbing
Interior Fit out of 6th and 7th floors including finishes and MEP items such as electrical, fire alarm, fire protection, plumbing, and mechanical.eplan
Fire Alarm
Renovations - Interior NSC
Low Voltage
Full construction cost applied in SF1654155 Interior renovation of commercial existing two-story retail banking branch. Work includes but not limited to demo and construction of no…
Low Voltage
All work and cost in conjunction with SF1660922. 6-7th floor Work on this permit to include modifying the existing sprinkler system to accommodate the ceiling demolition (upright s…
Renovations - Interior NSC
Electrical
Low Voltage
Electrical
Fire Alarm
Plumbing
Signs
Demolition - Interior
Demolition - Interior
Electrical
Fire Alarm
Low Voltage
Electrical improvements to support interior renovation of commercial existing two-story retail banking branch. Work includes but not limited to new/relocated lighting and electrica…
Renovations - Interior NSC
Electrical
Electrical
Electrical
Sign Replacements for "Bank of America" at 440 Boylston Street: Replace two sets of illuminated letters mounted to existing canopies and Re-skin 6 existing awnings. Approved by BPD…
Fast Track Application
Signs
Installation of signs for "STK" Steakhouse: 5 sets of face-lit channel letters, 1 Internally illuminated blade sign and 4 awnings. Approved by BPDA.
Electrical
Low Voltage
Fire Protection/Sprinkler
Interior/Exterior Work
Low Voltage
Low Voltage
Low Voltage
Plumbing
Fire Alarm
Renovation of existing space for new commercial restaurant
Weiss Asset Management Misc. Low Voltage HVAC Control Wiring AG - 231656
install waste, vent and water for new bathrooms and kitchen equipment for restaurant
install gas pipe for new restaurant cooking equipment
Install Category 6 cabling for network devices, and security camera surveillance system and access control system.
Interior renovation to an existing space. Project includes, new partitions, ceilings, HVAC, lighting and life safety modifications to accommodate the new layout.
Installing 9 devices for new retail/business Trader Joes in 222 Berkeley St.
222 Berkeley Street office fit out to support Weiss Asset Management; includes improvements to Fire Alarm System on floor 8 only.
222 Berkeley Street office fit out to support Weiss Asset Management; includes improvements to electrical system and distributed branch circuity.
Renovate existing restaurant space to accommodate a new steakhouse with kitchen, restrooms, dining areas and bar. Change of occupancy for new seating layout.
Barber Shop, Lab, School, Bank, Retail, Restaurant, Day Care, Car Wash, Rental Agency and Offices ,Group A-3, Seating (Tables &; Chairs) With A Max Capacity of 278 PersonsCertifica…
40 security devices installed in P1 and First Floor of 222 Berkeley St / 500 Boylston St for Oxford Properties (TK236060)
Landlord base building improvements for tenant upgrades in both 222 Berkeley St and 500 Boylston St. Work at level 1 to include; selective demo, MEP's, FP and FA and finishes as pe…
Install one 90" x 31" illuminated wall sign and one 40" x 18" blade sign for SVB Financial Group per sketch attached.
Make Safe Plumbing Demo
Make Safe Demo of Gas piping System
Cut cap and make safe electrical services. Complete partition removal at restrooms, bar and kitchen
white out tenant space remove and recircuit existing devices
Barber Shop, Lab, School, Bank, Retail, Restaurant, Day Care, Car Wash, Rental Agency and Offices ,Group A-3, Seating (Tables &; Chairs) With a Max Capacity of 278 persons.Certific…
Cut cap and make safe electrical and plumbing services. Complete partition removal at restrooms, bar and kitchen.
Demo to the 8th Floor of 222 Berkeley.
Demo and make safe of existing plumbing fixtures on the 8th floor.
The proposed project consists of approximately 19,000 SF of interior demolition only to an existing tenant fit-out on the 8th floor suite. The building is fully sprinklered per NFP…
130' LF of drywall partition to enclose interconnecting stair between 6th and 7th floors. Includes painting, patching of ACT, flooring and wall base at new wall locations. NO work…
Demolition of lighting fixtures and circuits. Installation of temporary light fixtures and exit signs
Removal and disposal of existing ceiling in dining and kitchen area. Install upright sprinkler heads to maintain code. Includes installation of temporary light fixtures for work.
Removal and disposal of interior ceiling. SF is application is for early demo for ALT1339115
Barber Shop, Lab, School, Bank, Retail, Restaurant, Day Care, Car Wash, Rental Agency And Offices ,Group A-3, Seating (Tables &; Chairs) With a Max Capacity Of 278 Persons.Certific…
Barber Shop, Lab, School, Bank, Retail, Restaurant, Day Care, Car Wash, Rental Agency and Offices ,Group A-3, Seating (Tables &; Chairs) with a Max Capacity of 278 Persons.Temp Cer…
SIEM621 - Install low voltage controls for the HVAC system on the 17th and 18th floors.
Network wiring for Summit on 17th & 18th floors
Install one (1) Category 6 cable for Conference Room A/V System.
Job #16104 Oxford Properties Misc Fire Alarm Upgrades on P1-P3, 1-3, 6,15, 21, & 22
INSTALLATION OF NEW TENANT SIGNAGE IN EXISTING SIGN FIELDS SEE ATTACHED LOCATIONS.
Install wiring within office cubicles on 19th floor for Alteryx.
Install wiring within office cubicles on 13th floor for GWK.
Job# 21-0204-10 Summit Partners -359 Speakers
REPLACE EXISTING RECESS LIGHTS WITH NEW. REPLACE EXTERIOR LIGHTS WITH NEW
Certificate for Offices 19th floor.ALT1253841 Issued 10/14/2021 &; SF1257631 Issued 10/12/2021
Wiring of 1 new heat pump and disconnect/reconnect of 1 heat pump on 19th Floor, relocate 3 Tstats on floor.
30 security devices on the 9th, 10th, 17th and 18th floors of 222 Berkeley St for tenant Summit Partners (TK216320)
Scope: Access Control & Video Surveillance (7) access control doors (5)cameras @ 222 Berkley Street Boston MA 02116 - 19th Floor
Installing 1 new fire alarm device and relocating 6 others in existing tenant space renovation - Alteryx
Job #15844 Oxford Properties Meter Upgrade Floors 9-22
Installation of network cabling as part of renovations to the offices.
Remodel of existing tenant space.
SIEM621. Install low voltage controls for the HVAC system for Summit on the 9th and 10th floors.
EMD105. Install low voltage controls for the HVAC system for GW&K 13th and 14th floor.
ALTERYX - 19th Floor; -; Renovations to existing Offices.; Work includes minor Demo and rework of Offices work includes drywall partitions, new lighting, ACT, new flooring,;electri…
19th floor - prep demo for renovation of offices demo and layout of framing full building permit filed Alt # 1253842
Complete renovation of 9,10,17&18th floors consisting of demo ,temp power , new power ,lighting ,lighting controls
Fire alarm upgrades in conjunction with tenant fitout of floors 9,10,17 &18
Job #15744 Summit Partners Floors 9,10,17,18 AV System Install
Network wiring for Summit on floors 7,8,17 and 18
Elec app. Per BPDA approval 7-15-2001 change the sunbrella fabric on two window awnings. Frames to remain in place. Copy to read: Merrill/logo/A Bank of America Company.
Maintenance & Testing to the switchgear with Eversource
Plumbing work for Summit Partners at 222 Berkeley Street
Plumbing renovation work for GW & K at 222 Berkeley street
Job #15646 GW&K Floors 13-15 Electrical Fit out, including (1) 200A 42 ckt panel & (1) 84 ckt panel.
Job #15647 GW&K Floors 13-15 Tel/Data install
Job #15646 GW&K Floors 13-15 Electrical Fit out, including (1) 200A 42 ckt panel & (1) 84 ckt panel.
Job #15646 GW&K Floors 13-15 Electrical Fit out, including (1) 200A 42 ckt panel & (1) 84 ckt panel.
Phased office renovation to Summits 9-10th &; 17-18th floors. Work includes new drywall partitions, millwork, carpet, tile, glass office fronts, paint, fabric, plumbing fixtures, l…
Furnish &; install supplemental steel stiffening reinforcement plates within 8th Floor office space (for 9th floor framing). Work includes selective drywall acoustical scope and se…
Office renovation on the 13th, 14th & 15th floors of an existing building. Work to include: selective demolition, steel, new architectural finishes, drywall partitions, ACT ceiling…
Selective modifications to drywall, ACT, paint, relocation of selective HVAC distribution, equipment, power and lighting at 8th floor office space.
Barber Shop, Lab, School, Bank, Retail, Restaurant, Day Care, Car Wash, Rental Agency and Offices, Group A-3, Seating (Tables &; Chairs) with a max capacity of 278 personsCertifica…
Removal of interior architectural finishes and MEPs on 9th & 10th Floors. Includes removal of drywall partitions/ceilings, ACT, flooring, tile, fabric, millwork, glass, with makesa…
Installation if Data and Coax cables for Studio room
Draft Kings Studio - 5th floor - Convert room into product studio work includes minor MEP and finishes.
Furnish and Install 2 new fiber runs. Both originating from 2nd floor MDF, and cabling to 10th floor IDF and 17th floor IDF. No terminations, rough only, leave in place when done.
Barber Shop, Lab, School, Bank, Retail, Restaurant, Day Care, Car Wash, Rental Agency and Offices ,Group A-3, Seating (Tables &; Chairs) with a max capacity of 278 persons.Certific…
Remove the 6th floor from the permit ALT1029946 as no work was done or scheduled to be completed.ORIGINAL ALT HAD ALL FLOORS LISTED INCORRECTLY SEE A1161037
Barber Shop, Lab, School, Bank, Retail, Restaurant, Day Care, Car Wash, Rental Agency and Offices ,Group A-3, Seating (Tables &; Chairs) with a max capacity of 278 persons Certific…
Barber Shop, Lab, School, Bank, Retail, Restaurant, Day Care, Car Wash, Rental Agency and Offices ,Group A-3, Seating (Tables &; Chairs) with a max capacity of 278 persons Certific…
Installing 8 new devices for a new tenant on an existing tenant floor - Engineering Suite
Install wiring within office cubicles on 2nd floor for Oxford Properties
SIEM566. Install low voltage controls for 3 heat pumps and 1 exhaust fan.
Barber Shop, Lab, School, Bank, Retail, Restaurant, Day Care, Car Wash, Rental Agency and Offices ,Group A-3, Seating (Tables &; Chairs) with a max capacity of 278 persons. Temp. C…
37 telecom drops on the 2nd floor of 222 Berkeley St for Oxford Properties (JC206285)
4 security devices on the 2nd floor of 222 Berkeley St for Oxford Properties (TK206285)
Reconfigure Electrical for New Office Layout
2nd Floor - engineering office build out to include new finishes (walls, flooring, ceilings, millowork) and new and reworked MEP's
Barber Shop, Lab, School, Bank, Retail, Restaurant, Day Care, Car Wash, Rental Agency,;Offices, Group A-3, Seating (Tables &; Chairs) with a max capacity of 278 persons. Certificat…
Barber Shop, Lab, School, Bank, Retail, Restaurant, Day Care, Car Wash, Rental Agency and Offices ,Group A-3, Seating (Tables &; Chairs) with a max capacity of 278 persons Temporar…
Barber Shop, Lab, School, Bank, Retail, Restaurant, Day Care, Car Wash, Rental Agency,;Offices, Group A-3, Seating (Tables &; Chairs) with a max capacity of 278 persons. Temporary…
Barber Shop, Lab, School, Bank, Retail, Restaurant, Day Care, Car Wash, Rental Agency and Offices ,Group A-3, Seating (Tables &; Chairs) with a max capacity of 278 persons Certific…
kitchen sink
215 telecom drops on the 4th floor of 222 Berkeley St for tenant DraftKings (JC207185)
Renovations and modifications to existing trading desks consisting of new and relocated power
low voltage telecommunications cable installation
Added power to support Weiss Asset Management's new furniture layout on the 16th Floor.
Add a new Siemens Control panel. Provide 120 VAC power. Wire an IP connection to the switch in the riser. wire the typical AHU control points to this new controller. Wire all contr…
new lighting
Provide labor and material of the installation of low voltage controls for VAV’s, component panels, fan power boxes, bathroom exhaust, chill water pumps, which includes 18 VAC powe…
Provide labor and material of the installation of low voltage controls for VAV’s, component panels, fan power boxes, bathroom exhaust, chill water pumps, which includes 6 VAC power…
Network wiring for Wayfair on floor 6, 8 and 9
Installation of Card Access Devices for security purposes on floors 4-6-8 and 9.
Work consists of new and modified art lighting on floors 21 and 22. Work will include selective cutting of ACT and hard ceilings to accommodate new lighting fixtures, running wires…
Installation of Plumbing for various fixtures on floor 4-6-8-9,
222 Berkeley Street Wayfair, low voltage HVAC control wiring 198182 - PAG
New power and lighting for Wayfair Office Fitout on the 4th, 8th & 9th Floors.
New Fire Alarm Devices for Wayfair Office fitout on the 4th, 8th & 9th Floors.
Interior renovations on floor 4, 6, 8 &; 9. Work to include framing, drywall, ACT ceilings, doors, frames, hardware, glass, glazing and finishes. New and relocation of mechanical,…
Barber Shop, Lab, School, Bank, Retail, Restaurant, Day Care, Car Wash, Rental Agency and Offices, Group A-3, Seating (Tables &; Chairs) with a max capacity of 278 persons Temporar…
SIEM477 - 222 Berkeley Cooling Tower: Scope: piping control wires to existing sensors for 2 cooling towers
Installation of one set of 1/2" Brass Letters for "Wayfair" 15" high x 10'-0" wide. Approved by BPDA. eplan
Barber Shop, Lab, School, Bank, Retail, Restaurant, Day Care, Car Wash, Rental Agency and Offices ,Group A-3, Seating (Tables &; Chairs) with a max capacity of 278 persons. Tempora…
Install Controls to modify Air Handlers
barber shop, lab, school, bank, retail, restaurant, day care, car wash, rental agency and offices ,Group A-3, Seating (Tables &; Chairs) with a max capacity of 278 persons Certific…
222 Berkeley, 8th Floor - Removal of interior finishes;of vacant office space including partitions, fixtures and selective MEPS &; existing HVAC equipment. Turn sprinkler heads up…
20th floor roof deck
6 telecom drops on the 22nd floor of 222 Berkeley St. for tenant Abrams Capital
Modifications to;existing;Roof Deck on the 20th Floor.; Create a Wheelchair;accessible entry;and upgrade Life Safety for existing Roof Deck.
Installation of a ballistic door, cameras and paneling on the 22nd floor. Work to include; selective demo, electrical, patching and paint as needed.
200 telecom devices between the 19th and 20th floors of 222 Berkeley St for tenant Orrick (MA197285)
Demo power & lights on the 4th & 9th floor for 222 Berkeley
Wayfair -; Amendment to ALT919072 - Interior structural work for added stairs from 2-3 and 6-7
222 Berkeley, 9th Floor -Removal of interior finishes;of vacant office space including partitions, fixtures and selective MEPS &; existing HVAC equipment. Turn sprinkler heads up c…
222 Berkeley Street, 4th Floor -;Removal of interior finishes;of vacant office space including partitions, , fixtures and selective MEPS &;; HVAC equipment. Turn sprinkler heads up…
22th floor
Rework of the 2nd floor Core Bathrooms.
Installation of plumbing for two kitchen sinks on the 19th floor and two on the 20th floor, Rework of Core Bathrooms on the 20th floor,
222 Berkeley Orrick Fls 19 & 20, Misc low voltage HVAC control wiring - PAG, 197354
17th Floor Adding workstations to include new carpet, base and paint. Added power for workstations.
19th and 20th floor fit out
19-20 floors fit out
Installation of Card access devices, Turnstiles and panels for security purposes. Phase 2 of the project.
Orrick, Herrington &;;Sutcliffe -; 19th &; 20th Floors - Buildout of;new Office space on 2 floors.;;Work includes :;furnish &; install drywall partitions, glass office fronts, ACT…
Install wiring within office cubicles on 11th floor for Rhythm Pharmacueticals
Relocate existing conference room switches, add 14 recessed lights
replacement of potable water booster skid
Barber Shop, Lab, School, Bank, Retail, Restaurant, Day Care, Car Wash, Rental Agency and Offices, Group A-3, Seating (Tables &; Chairs) with a max capacity of 278 persons Temp. Ce…
Barber Shop, Lab, School, Bank, Retail, Restaurant, Day Care, Car Wash, Rental Agency and Offices ,Group A-3, Seating (Tables &; Chairs) with a max capacity of 278 persons Temporar…
Renovate existing bathrooms on the second floor of 222 Berkeley St.
Job #14085 GWK 14th Floor Install receptacle for new copier
Renovation of existing conference room on the 12th floor to create new layout. No structural work. No fire alarm and one sprinkler head to be lowered same location.
Wayfair Phase 2 - 222 Berkely Street, Misc low voltage HVAC control wiring - PAG, 197079
New power & lighting for restroom renovation on second floor.
New Speaker/ Strobe devices for restroom renovations on 2nd floor.
Wayfair phase 2 500/222 2nd floor
Wayfair: 2nd Floor office space. New lighting and power for office fitout.
Electrical Permit · ELECTRICAL · Jul 29, 2026