Building permit intelligence · Boston, MA
30 Saint James Av has 64 municipal building permits on file in Ward 5. The latest recorded activity was a plumbing permit dated Jun 24, 2026. Permits at this address represent $5MM–$25MM in total declared construction value. PropertyLabs also identified 16 mapped permits within 500 m of this address.
Plumbing
Plumbing
Generators
Generators
Generators
Generators
16 mapped permits within 500 m, shown on the intelligence map above.
2 other addresses on Saint James Av with municipal permit records in Boston.
This address has 64 permit records in PropertyLabs' public history and is located in Ward 5. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 3, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 30 Saint James Av is dated Jun 24, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 30 Saint James Av in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Generators
Plumbing
Plumbing
Plumbing
Plumbing
Fire Alarm
Electrical
Renovations - Interior NSC
Renovations - Interior NSC
Other
Plumbing
Plumbing
Fire Alarm
Electrical
install plumbing for new kitchen fixtures in Bacco space first floor.
Security Adds
Add Four Exit signs with Flood lights
remove and add one speaker strobe and add one addressable smoke on the fifth floor
Add outlets to a new partition wall move and relocate speakers and add two exit signs
provide waste vent and water piping for new kitchenette on 8th floor Vistra space.
add water line for coffee maker, install water heater and replace sink and faucet on 7th floor McCoy space.
provide waste vent and water piping as required. install new water heater and relocate two hand sinks on 1st floor Vision Source space.
sink and hot water heater and dishwasher CFAR space 7th floor.
Offices, Retail, Bank, Graphic Products, Private Fitness Club LTD to 39 Max Persons, Restaurant #37, &; Resuarant#36A/#37. Certificate for Offices 9th Floor Alt851028 - 8/23/18
Remove existing pumps, covers and pipe to install (2) new sewage ejector pump in the sub basement of 30 Saint James Ave.
Remove existing letters and install new Santander logo and letterset. Using all existing material and hardware. White dimensional letters to be mounted using D/S VHB tape.
Install new heat trace on rooftop cooling towers. Run new electric feeds to stairwell unit heaters on following levels: Basement, 1st floor & penthouse
Provide and install (11) VFD's throughout the building
Installation of data drops for communication purposes
Installing new fire alarm devices. 9th Floor. (Assembly Space)
Liberty Mutual - 9th Floor -; Tenant Office;renovations includes demo, drywall partition, electrical/fire alarm, sprinkler, plumbing, mechanical, HVAC and all;finish work;;
Liberty Mutual Demo, Misc low voltage HVAC controls - PAG, 186159
Renovate Assembly Area. 1 Light Control Panel and 18 Floor Boxes.
Liberty Mutual Assembly Space - 9th floor prep demo of walls, floors and finishes.
Renovations to existing loading dock area. Work includes demolition, patching, painting, remove old and install new security grates and roll up doors, flooring and electrical work.
Replace existing plumbing fixtures.
install one kitchen sink, disposal, dishwasher and one point of use electric water heater.
install one kitchen sink and one dishwasher
TEL/DATA LOW VOLTAGE WIRING 34 OUTLETS 8TH FLOOR OF 31 ST JAMES AVE RADIUS JOB NUMBER 15-0393-10
erect temporary "goalpost" for "Pride Party 2015" 6/14/2015 on Saint James Ave, between Arlington and Berkeley 37' wide x 20' high as shown
Disconnect (1) existing pump and reconnect (1) new pump in sub-basement on oil-sand intercepter
Install disconnect and wiring for electric hoist
Low Voltage HVAC Control Wiring ~ Liberty Mutual 30 St. James Job #13-0812 (PAG)
Low Voltage Tel/Data on the 5th floor.
Office Renovations.
Liberty Mutual - First Floor - Fitout of approximately 2,500 sf of existing Office space.; Work includes demolition,;installation of ;furniture systems, new carpet, ACT, MEP's, Fir…
1st floor
Liberty Mutual 2nd floor on site Health Renovation
Liberty Mutural 2nd floor on site Health Renovation
Install dutchman at spalled concrete areas; remove & replace one stone; and install 5 GFRX pieces at missing round stones.
Add 50 Tel/Data outlets
Three test borings in a parking lot.
installing fire alarm devices to the existing fire alarm control panel
New construction on the liberty conference center addition to the existing building
Install new teldata cabling in Liberty Mutual office space being renovated on first floor of 30 St James
Relocate (2) existing speaker strobe devices from existing walls to new walls.
8th Floor Tenant improvements. Build out (6) new offices including installation new light fixtures and receptacles. Relocate (2) fire alarm A/V units and (1) heat pump.
Install data and voice cabling on 9th floor for office renovations.
Electrical Low Voltage · LVOLT · Jul 28, 2026