Building permit intelligence · Boston, MA
100 Stuart St has 182 municipal building permits on file in Ward 5. The latest recorded activity was a electrical permit dated Jul 21, 2026. Permits at this address represent $5MM–$25MM in total declared construction value. PropertyLabs also identified 7 mapped permits within 500 m of this address.
Electrical
Renovations - Interior NSC
Renovations - Interior NSC
Electrical
Electrical
Renovations - Interior NSC
7 mapped permits within 500 m, shown on the intelligence map above.
5 other addresses on Stuart St with municipal permit records in Boston.
This address has 182 permit records in PropertyLabs' public history and is located in Ward 5. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 100 Stuart St is dated Jul 21, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 100 Stuart St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Electrical
In UNIT 18 F Wired and installed (4) LED wafers with a dimmer switch
Plumbing
Renovations - Interior NSC
In unit 17E Wired (2) outlets for toilets.
Electrical
Fire Alarm
Electrical
Renovations - Interior NSC
Renovations - Interior NSC
Electrical
Electrical
Renovations - Interior NSC
Low Voltage
Installation of pergolas on the private part of the front of the building. The pergolas are free standing and will be removed after the season. This is done in conjunction to our O…
Gas
Plumbing
Low Voltage
REWIRE INTERCOM AT FRONT DOOR WORK TO BE DONE AT 110 STUART
EXPAND VIDEO SYSTEM
change 16 dimmers add 6 plugs
wiring/ install (2) vanity lights, gfci outlet, (2) shower lights and (3) switches in main bathroom unit 18D
Bathroom Remodel
• Remove existing tile in bathroom on walls and floor. • Existing vanity and toilet to be removed and reinstalled • Install new flush mounted medicine cabinet • Install new tile in…
Hotel,; Assembly Hall, Retail, Theme Bar, Restaurant, Spa, Fitness Center 123 Res Units, Storage and ATM Certificate for:;;ATM ALT988250 - 10/2/19 ; ;
Demo Make safe and furnish and install below listed devices ring and strind tele data
Renovations to the existing lobby, to include removal and replacement of the concierge desk and related millwork, replace small section of tile floor, paint/wall covering, electric…
install wiring and equipment for ATM card access
Installation of BA security devices at Chase Bank 100 Stuart St ATM - Boston MA 02116 (8-61159-01)
CCTV UPGRADE
tenant fit out
Change Occupancy to include ATM - ;Installation of an ATM in the existing building.;; E - Plan
Install plate letters for "Chase Bank" on the door transom as approved by the bra.
Remodel of bathroom sink/toilet/tub in Unit #22F
22nd floor Unit # 22F Renovate existing bathroom. Replace all existing interior finishes and fixtures including tile, vanity, shower, toilet. Add electrical outlets and additional…
Cosmetic renovations to 230 guestrooms and corridors including; furniture, lighting, wall finishes and floor finishes.
renovations to hotel guest rooms
renovations to hotel guest rooms, to relocate existing speaker/strobes to suit field conditions
Renovations to hotel guest rooms
Reverse handing of an existing door
w hotel bliss salon wired exhaust fan controlled by a single pole switch
Fabricate and Install (1) Set Of 20" Tall Face Lit LED Channel Letters with Translucent Blue Faces To Read: " bliss". Letters Stand Vertical With Required Concealed Back Support, M…
Install new nail salon ventilation
Increase occupant load of W Hotel lounge from 150 to 210. Existing egress and plumbing fixture facilities are sufficient for the increase in occupants. Refer to plan.
Install an electronic sign on exterior of existing building pursuant to Section 11-7 of the Zoning Code.
REPLACEMENT OF 2 EXISTING SMOKE DETETORS WITH HEAT DETECTORS IN MECHANICAL ROOM
New exterior LED Media Signage is being installed outside the W hotel.
New exterior LED Media Signage is being installed outside the W hotel. Along with a new 45KVA transformer being installed on the third floor, servicing a 150A 120/208V 60 ckt panel…
Kitchen renovation - Install new cabinets, appliances and plumbing fixtures. New lighting including recessed and cabinet lighting. Great room - Install ceiling speakers, install ne…
Replace kitchen sink, bar sink and gas stove
replace shower base
Replace copper pan on bathroom shower Install new tile flooring - work in Unit 16B.
install recessed lights throughout unit
relocate one 12' long non bearing interior wall 12" from current location, install miscellaneous new lighting, replaster living room ceiling and relocated wall, replace 4 sinks and…
installation of single zone ductless split system on first floor server room
Fabrication and Installation of (1) Double-Sided LED Illuminated Sign to be installed above new entrance canopy. Size is 42" Tall x 61.1875" Wide x 8.5" Deep
New front entrance
Renovation to building vestibule. Entry door replacement. Construct new wind screen. Relocate ADA ramp at curb.
Renovation select areas of the LOBBY at the "W" Hotel
Renovation select areas of the 4th floor at the "W" Hotel
Renovating the 4th floor adding and relocating horn/strobe units and smokes
INSTALL 3 VANITY LIGHTS, 1 SHOWER LIGHT
Gas piping for one fireplace
Installing 5 WC, 5 Lavs, 4 Showers, & 2 Sinks on 4th floor
Renovation to Fourth Floor interior spaces.
Adding 3 receptacle Run hdmi cable in the wall
Adding 3 Receptacle Run hdmi cable
Relocate closet switch to outside of closet. Replace four data jacks. Relocate chandelier
Construct Curtain wall with door. Add a door to a bathroom. Paint work done in Unit #19H.
Demolition of interior partitions. Cost reflected on ALT598871
Interior finishes renovation at the lobby area.
Replacing shower valve.Replace lavatory faucet. Replace water closet
Install 150 Three side Ortal gas fireplace
Hotel, Assembly Hall, Retail, Theme Bar, Restaurant, Spa, Fitness Center, 123 Multi-Family Residential Condo &; Storage. doc#alt220743; Certificate of Occupancy for the Hotel Spa S…
Replace (1) photo electric smoke detector with (1) heat detector. The smoke detector is installed in a spray tanning booth and is false alarming thereby causing a life safety issue…
Replace 2 toilets, remove a tub and replace with a shower
Temp generator power for film production 7-7-15 Set
Renovate master bath, new plumbing fixtures and new lighting. Install new lighting in master bedroom.
Work is being done on 110 Stuart St, (W hotel) on the hotel Penhouse # 1 Intall 4 new Pendant lights, replace 4 recess trims and install 6 dimmers.
Install plumbing for 3 pedicure chairs/sinks
; ;Install new tile flooring install new tile in 3 shower stalls 4 new pedicure stations install new light fixtures paint build new feature wall build 2 new treatment rooms.; Work…
wire two new rooms and relocate the existing panels
renovations to hotel spa/adding treatment room/pedicure stations/ ALT to follow to include treatment room
extend existinig ceiling box to new location
Install projector sign
Replacement of a toilet and a lav sink
installation of low voltage ip video upgrade
disconnect and remove electric heat from living room and abandon wiring
Replace flooring in 2 guest bedrooms. Install sound insulation in guest bedroom. Paint 2 guest bedrooms. Install additional light fixtures in guest bedroom and guest bathroom. Repl…
Work in lobby Install wiring for 3 floor receptacles and LED lighting fixture at water feature
install doors in hall way
Replace 1 toilet, sink and faucet
Install Shade power panel/low voltage shades
Frame wall to accept new Fanola Oil fireplace insert. Finish local area with new drywall, paint, crown & base trims.
Replace corridor carpet and base floors 4-15
Work in Unit #25G Relocate 2 existing CO detectors and 2 fire alarm speakers
Automated shade wiring and power panel for shades.
Install temporary generators for power to support movie The Forger. Generators are truck mounted and parked on Street. David Norcott is Electrician (508)631-0666
Install temporary set of leads/tails for the purpose of furnishing temporary power to a film set on the 20th floor, in the residence side of The W hotel.
Work in Unit #25G Lighting modifications and additions throughout unit
Install 20A -120V circuit to Men's Room for an electric hand dryer. Install 20A - 120V circuit to power low voltage LED decorative lighting. Install a CAT 5e cable to computer to c…
Replace tub with shower
Electrical work in the W Hotel Install wiring for 2 signs on 2nd floor
Remove toilet,and lag and cap plumbing.
add 5 outlets for blinds add 7 recessed lights and hang some liighting fixtuers
Install cellulose insulation in living room wall and entry way wall for sound proofing. Patch and paint.
wiring for motorized shades and network data wiring
pre-wire for audio/video
Legal Occupancy:; Hotel, Assembly Hall, Retail, Theme Bar, Restaurant, Spa, Fitness Center, 123 Multi-Family Residential Condo &; Storage. COO for the Theme Bar - Tunnel, LLC Alt12…
renovation of bathroom, living room, and kitchen
Wiring of newly created bathroom in basement nightclub
Unit 16H. Move existing horn/strobe to accomodate new built-in cabinets in the bedroom.
Unit 16H. Add 1 outlet in the bedroom. Move 1 outlet higher on the wall to accomodate biult in cabinetry. Rewire lighting in the 1/2 bath to accomodate new fixtures and layout.
Proposed Work: VINYL BANNERS ONTO BARRICADE TEMPORARY, Last Action: READY TO ISSUE
Remove an existing non load bearing wall to incorporate the guest bedroom into the livin g area. Install new energy efficient lighting in various locations in the unit. Remove the…
Lighting upgrade
Miscellaneous local demo and reframing. Wire off existing electrical service for new lighting, relocate switches and outlets. Install new powder room sink and faucet. New hardwood…
add 20 recessed lights 10 surface lights and outlets and switches. Unit 27e
replacing a vanity/faucet in bathroom
Install new vanity in bathroom along with new tile backsplash. Paint
Install of 10 recess lights, 4 outlets, 5 switches and install of 2 surface lighting fixtures in unit 25E
Add new switching and lighting, recess lights, sconces and surface fixtures
Install of old work recess lighting, pendant fixtures and switches in unit 20C
Increase total occupancy to;192 as revised;per plans-review after the AON Fire Protection engineer's analysis.
Adding sixteen five inch recessed lights with eight new switches. Remodel master closet with one light and switch. Two receptacles.
Supply gas for fireplace unit.
Plumb in new powder bath and install new fixtures in master bathroom in unit 24 - C.
Unit # 24 - c: Re-frame new partition walls for new doors, closets, powder bath/laundry room. Re-wire off of existing service for remodeled space. Plumb new fixtures for master and…
wire bathroom and add wall sconces and recessed lights. in unit #24c.
relocate (1) 3way switch in unit 16H
Abatement meter install
reconnect wires for island gfci that was relocated in unit 20c
creat new door opening from master bathroom to hallway unit 16h
rotate kitchen island 90 degrees unit 20C
Add 3 switches, 6 sconces, 5 recess lights, and ceiling fan
Upgrades to Low Voltage Buildng Automation System.
Relocate fire alarm wall horn in unit 22E
Unit # 22E Residence: Installing lighting and outlets
Remove closet and install bed room door, work to be done unit#27J
Replace carpet at mezzanine, add light fixture to rooms, install grab bar at showers and replace wood shelf.
Unit 24H install 13 recessed lights
PREHEAT DOMESTIC HOT WATER
Wiring for recessed lights and outlets Unit 25B &; C
Installing 2 quad outlets in unit 25J
Installing 3 recess lights, 1 outlet and 1 closet light in unit 27D
Plumb new powder bath and install new fixtures unit 24 B&C.
Re-frame new partition walls for new doors, closets, powder bath/laundry room. Re-wire off existing service for remodeled spaces. Plumb new powder bath and install new fixtures. Re…
1.Add additional box in kitchen,above proposed island. 2.Install 3 pendants purchased by client above proposed island. 3.Install 3 additional recessed lighting in guest room. 4.Add…
Install of 3 outlets and relocate lighting switch in unit 24J
Closing the walk in closet door and installing a framed opening to the closet from the master bathroom
relocate light switch and install 2 outlets in unit 25H
100 Stuart ST # 21E Boston, install 6 recessed lights in livingroom, 8 recessed lights in the bedrooms hang 2 sconces in the bathroom, hang 2 pendants in the kitchen.
instale secondar bathroom door,instale bifolding partion doors remove top half on int.nsc wall.no fire alarm or sprinkler work
Add 3 lights.move two outlets boxes
biuld a non load bearing wall with a doorway in it. W Hotel at 110 Stuart St residential unit 26h no sprinkler or fire alarm work
Add shelf lighting new new Millwork in the Bliss Spa.
New millwork shelving units,new flooring,painting, relocate sink and lighting.
Relocate existing circiuts for new layout
Install 2 hair wash sinks.
Lavatory install
Interior renovations to include 2 hair wash sinks and 6 hair cutting stations. Relocate reception counter for James Joseph Salon at the former Bliss Spa retail area.
unit 17c - disconnect and reconnect power to kitchen island and install 2 pendant lights
unit 27C - disconnecting and reconnecting kitchen island outlets and installing 2 pendant lights
unit 18E - Relocating 3 outlets, 2 switches, and installing 2 recess lights, 5 lighting scones
remove and relocate electrical boxes and wires for construction. add three recess lights and accent lighting with one switch.work to be done in unit#26B
install kitchen sink
Install electrical outlets
sprinkler work relocate as needed 3 heads
expand closet,add outlet n bedroom,run cabel wire,mount tv on wall install two pocket doors,and rotate kitchen island
Unit 26C add 15 recess lights and 5 switches.
Add switch and closet light in coat closet, add and install 3 recessed lights, replace walk in closet light. Unit 26F
new Panera Bread Restaurant
Installation of speakers and data wiring
install of bathroom sconces, closet light and relocate 2 outlets
install of surface light and recess light
Running low voltage cat5 data lines in newly constructed Panera Bread restaurant. Will require around 30 cable drops through pre-existing conduit. Cabling will be elevated off the…
Electrical Permit · ELECTRICAL · Jul 21, 2026