145 Harrison Av has 33 municipal building permits on file in Ward 3. The latest recorded activity was a lvolt permit dated Jul 23, 2026. Permits at this address represent $5MM–$25MM in total declared construction value. PropertyLabs also identified 1 mapped permit within 500 m of this address.
Low Voltage
Fast Track Application
Fast Track Application
Electrical
Electrical
Fire Alarm
1 mapped permit within 500 m, shown on the intelligence map above.
12 other addresses on Harrison Av with municipal permit records in Boston.
This address has 33 permit records in PropertyLabs' public history and is located in Ward 3. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 145 Harrison Av is dated Jul 23, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 145 Harrison Av in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Electrical
Fast Track Application
Plumbing
We will be doing a lighting retrofit throughout the Sackler building.
Adding 3 duplex outlets, relocating 1 switch for Partition wall being added.
5th floor-Interior Renovation of (1) 126 square foot office. Install (2) non structural partition walls, door, flooring, drywall, ceiling tiles and paint. 1 Sprinkler head to be re…
375600 - Tufts M&V Level 8 - Install gas line for Gas Outlets
4th floor lab renovation.
Tufts BRPH M&V Level 8 - 375600 - Selective demo of existing lab space. Install new piping, fixtures, and turrets. Joints to be either soft solder or brazed.
Security System Add-On One Camera
Auditorium, Classrooms, Adminstrative Offices, Library, Fitness Room and Cafe LF2999 May 7, 2008 and LF4023 Spetember 17, 2008
Research Labs, Offices, School w/Library, Classrooms COO for Classroom &; Offices (Sixth Floor) Alt384296, issued: 7/17/2014
Tel/Data Cabling for Tufts University Sackler 6
6th floor
6th floor
Interior renovation to approximately 4200 sf of the 6th floor of Tufts Hirsch Library(offices and classroom space). Work to include; select demo, MEP's sprinkler, and finishes.
Tufts campus signage: Installation of BRA approved architectural blade signs per structural eng. drawing; to be installed by professional J.Correia II of BBWraps sign co.
Research; labs, offices;, school C/O-For Classroom/Library on the 6th floor- only alt 243090 . issued 5/30/13
Tel/Data work for Tufts University Sackler 6
Build out of classroom on the 6th floor of Tufts Sackler Building. Work to include; HVAC, electrical, FA, Fire protection and new finishes. Per Plan
ELECTRICAL RENOVATIONS TO THE 6TH FLOOR. WE ARE ADDING 4 NEW FA SPEAKER STROBE DEVICES ON THE 6TH FLOOR
ELECTRICAL RENOVATIONS ON THE 6TH FLOOR. ADDING NEW LIGHT FIXTURES & POWER WIRING DEVICES
Removal of 2 exterior windows on the 5th floor at room 528. Replacement with louvers.
RE-CONFIGURE EXISTING CLASSROOM AND STUDY ROOM INTO A LARGE CLASSROOM. NEW ELECTRICAL LIGHTING AND MINOR POWER MODIFICATIONS.
RE-LOCATE EXISTING SPEAKER STROBE DEVICES TO ACCOMMODATE EXPANDED CLASSROOM.
Reconfigure existing classroom and study room into a large classroom. Work includes selective demo, new partitions and new finishes consisting of carpet, glass, millwork, ceiling a…
Tufts University Sackler Bldg Restroom Renovations