Building permit intelligence · Boston, MA
700 Harrison Av has 78 municipal building permits on file in Ward 8. The latest recorded activity was a intren permit dated Jun 17, 2026. Permits at this address represent $100K–$500K in total declared construction value. PropertyLabs also identified 6 mapped permits within 2 km of this address.
Renovations - Interior NSC
Renovations - Interior NSC
Gas
Gas
Gas
Electrical
6 mapped permits within 2 km, shown on the intelligence map above.
Short Form Bldg Permit · EXTREN · Jul 20, 2026
Long Form/Alteration Permit · SIGNES · Jul 20, 2026
Electrical Permit · INTDEM · Jul 20, 2026
Electrical Low Voltage · LVOLT · Jul 20, 2026
12 other addresses on Harrison Av with municipal permit records in Boston.
This address has 78 permit records in PropertyLabs' public history and is located in Ward 8. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 700 Harrison Av is dated Jun 17, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 700 Harrison Av in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Electrical
Electrical
Gas
Plumbing
Interior/Exterior Work
Gas
Plumbing
Electrical
Gas
Electrical
Plumbing
Gas
Renovations - Interior NSC
Gas
Gas
Gas
Gas
Gas
Plumbing
Electrical
Interior/Exterior Work
Electrical
Renovations - Interior NSC
Electrical
Gas
Plumbing
Renovations - Interior NSC
Gas
Gas
Plumbing
Electrical
remodling full bathroom, and kitchen sink
Swap out receptacles and lighting fixtures in bathroom
Renovate bathroom with new floor tile, vanity, shower tile, and niche. new flooring throughout unit new countertops in kitchen, paint cabinets paint unit
VZW cell site light pole
Installed new gas stove in unit 405
Installed new sink, vanity, toilet, and shower fixtures in unit 405
Moved wiring to accommodate new kitchen layout
Remove and replace kitchen cabinetry, countertops, and appliances. Remove and replace master bathroom tile, fixtures, and cabinetry.
Unit #307 Install 6 remodel recessed light fixtures in living room Install 4 remodel recessed light fixtures in bedroom
install one set of push thru, edge-lit letters on storefront with new aluminum panels, "Estragon Tapas Bar" (white edges, black faces), and (2) non-lit blade signs, "Estragon": pai…
Rebuild damaged brick veneer with new brick
Replace Dishwasher in the Kitchen
Kitchen renovation
Kitchen and Bathroom remodel
Install 22 recessed lights and 4 switches in unit # 302
Work being performed in unit# 601 / Kitchen Remodel
kitchen remodel
gas stove install
700 Harrison Ave. Unit #601 Kitchen remodel
Replace the existing fixtures in the master bath including; toilet shower pan shower valve and (2) vanity sinks and faucets Replace the toilet shower trim and vanity sink and fauce…
Renovate Master Bathroom, Hall Bathroom and Kitchen. Refinish existing hardwood flooring. All plumbing fixtures to remain in existing locations. No walls to be moved. No structural…
16" x 176.6" acrylic letteres mounted to existing runway. Recover existing awning with no lettering or graphics.; as per plans approved by Historic SEAC and BRA; to be installed by…
roof top gas bbq grill unit # 605 Owner Jerry Kadish
Replace kitchen sink,disposer,faucet and dishwasher.
renovation of kitchen
Add an enclosed 42" high fenced in area for a "Kids Cafe'" to an existing daycare facility. The fencing will be on the street sidewalk (all privatly owned) directly in front of the…
(84); units, garage, retail, restaurant w/take-out, offices, services use, restaurant ,preschool, care C/O-For Restaurant;#37-only alt 124525, issued 4/13/2012;
add 1 data and 1 cable in new bed rm
add 1 detector in new bed rm old work
add 8 recessed lights old work. add 2 dimmers for them add 2 outlets for new wall and 1 smoke detector. work on unit 203
Studio to one bed, add wall and door,hardwoodfloors,granite counter top,new vanity top in bath,and paint no new sprinkler work
re-connect kitchen sink
Pine Village Preschool; -; New signage, 1/2" PVC letters and logo and window lettering per Landmarks # ;SE10.211
To change the current indoor;seating of Estragon restaurant;from 71;persons to 109 persons;and the outdoor seating will be reduced from 28 to;12 seats by;combining the existing Est…
Install sign lighting
new fixtures in single bath
remove existing tile on shower are and floor,install new tile shower waallls and floor new med cabinet, new vanity,switches and surface mounted light shower door,paint bathroom, ne…
upgrade shower trim, new toilet, and vanity, tile floor, paint
Replace lighting with energy efficient fixtures at Big Time Boston Food, Inc.
installgas range
Install a monitored security system
Electrical Low Voltage · LVOLT · Jul 20, 2026