960-992 Harrison Av has 28 municipal building permits on file in Ward 8. The latest recorded activity was a short form bldg permit permit dated Jun 26, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 3 mapped permits within 2 km of this address.
Removal and reinstallation of existing materials and finishes to gain the necessary access to install the structural reinforcements, such as exterior metal paneling, storefront mul…
Repairs to garage concrete floors.
Installation of a 494.95kW DC / 330.00kW AC ROOF MOUNTED SOLAR ARRAY
To furnish and install a 494.95 KW DC rooftop solar system; this includes all AC and DC equipment, wiring, as well as installation of all Racking and Modules
Misc. Electrical demolition to facilitate installation of RTU , Exhaust fans & VAV's
3 mapped permits within 2 km, shown on the intelligence map above.
12 other addresses on Harrison Av with municipal permit records in Boston.
This address has 28 permit records in PropertyLabs' public history and is located in Ward 8. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 960-992 Harrison Av is dated Jun 26, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 960-992 Harrison Av in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Replacement of VAVs and adjoining ductwork, with minor relocations as required. Scope includes ceiling removal to access the VAV work, and subsequent restoration. Modification to e…
Removal of existing duct smokes to facilitate installation of new RTU equipment and re-installation with new duct smokes
Gas piping in support of roof replacement.
Install low-voltage HVAC control wiring on new equipment for new Trane ATC system
Install new 3000amp service for EV chargers in Garage
Replacement of the roof and rooftop mechanical equipment. Removal of an existing solar array system. Work includes modification of supporting structural steel, fireproofing, plumbi…
Gas piping in support of a roof replacement at BWSC.
Misc. Electrical demolition to facilitate installation of RTU and Exhaust fans
Plumbing connections in support of a roof replacement at BWSC.
Temporary facilities, fencing and mobilization. Demo of the existing solar panel PV system on the lower roof. Remainder of work, including all roofing demo/install and rooftop equi…
Install 2 EV Cabinets and wiring for EV Chargers
new roof drain boston water sewer head quarters
BWSC is adding a new set of doors to create a vestibule at the front entrance. The electrical scope will demolition and adding new lights, ceiling mount electric heaters, and power…
The renovation project’s scope of work includes the construction of a new entry vestibule at the existing main entrance at BWSC Headquarter at 980 Harrison Avenue. The renovation w…
Repair conduits cut/broke by excavation. Repair/replace wires to dispensers and veeder root.
Replace existing site drainage for BWS car wash and install new oil, gas, sand separator. Civil drawings supersede original civil as addendum 1. Includes demo of selective structur…
Renovation of existing truck wash for BWSC
Renovations/installations of cross connection device, floor drains, water heaters and emergency showers @ Boston Water and Sewer Commission 980 Harrison Ave.
2 Unit Heaters and 3 Water Heaters installation at 980 Harrison Avenue, Boston Water Sewer Commission.
Replacement of Domestic Hot Water Heater.
Replacement of gas piping for new domestic water heater.
Replace the existing Obsolete Inergen Releasing Control Panel and Detectors.
relocation of non-structual interior partitions, removal and reinstallation of doors and frames, installation of new carpet and ceilings, installation of new light fixtures