Building permit intelligence · Boston, MA
100 William T Morrissey Bl has 222 municipal building permits on file in Ward 13. The latest recorded activity was a electrical permit dated Jul 23, 2026. Permits at this address represent $25MM+ in total declared construction value.
Electrical
Fire Alarm
Fire Alarm
Fire Alarm
Erect
Erect
7 other addresses on William T Morrissey Bl with municipal permit records in Boston.
This address has 222 permit records in PropertyLabs' public history and is located in Ward 13. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 100 William T Morrissey Bl is dated Jul 23, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 100 William T Morrissey Bl in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Erect
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Electrical
Electrical
Electrical
Low Voltage
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Cellular Tower
Cellular Tower
Demo existing fan unit, provide power to new fan equipment.
Install new power and lighting per plans for cooling tower expansion project.
Install new fire alarm devices per plans for new cooling tower expansion project.
ENE is parts/smarts sub to YES. YES to install 18 card readers, door contacts, request to exit and 3 control panels. 11 CR Clark Ath. Center, 2 CR Healy Library and 5 CR Campus Cen…
we are installing a 225 amp 480/277v panel, 112.5 KVA transformer, 400 amp 208/120 volt panel to accommodate 2 – 125 amp dryers.
Install new receptacles and lighting for seating in Wheatley Hall, Snowden Auditorium
Bolt down (2) dual port charging stations
Install ductbanks; Conduit for Communication Feeds; 225A Feed for Existing spare breaker in Main Switchboard; New Electrical Service; Site Lighting Package; Musco Exterior Enclosur…
Work Description: Erect temporary Performance stage / roof | 2025 UMass Boston Commencement 5/26/25 - 6/1/25 48' x 68' x 54"H stage w/ 5tier 56'W riser and 45' x 65' 8-post roof (2…
Low voltage - HVAC Controls
HVAC Controls - BMS Upgrade (low voltage electrical)
Rework existing power for door controlls at Campus Center, Healey Library, and Clark Athletic Center.
Providing the new metering and monitoring system of UMB MV Distribution Equipment with associated software (SCADA Indication& Control) in all buildings on campus except for Campus…
install power for lights and receptacles in the Quinn building
Install low voltage control wiring for new Johnson controls on new HVAC equipment in Police Station Controls installed on VAV boxes and Fan coil units
Install low voltage control wiring for new Johnson controls on new HVAC equipment in University Hall. Controls installed on VAV boxes and Fan coil units
Furnish and install (1) 75KV step down transformer fed from existing 480V panel. install 225A 120/208V panel to support (4) CPF50 EV Chargers. Install conduit, wiring and EV charge…
Install four single port charging stations from existing panel in UMass West garage. Rip and replace 11 existing stations with updated Charge Point stations.
Furnish and install fire alarm for Umass Boston Police Department Renovation per plans.
Furnish and install electrical components to Umass Boston Police Department Renovation per electrical drawings.
UMASS Boston - Service Supply Building Retrofit Misc. Low Voltage HVAC Control Wiring CH-242801
New fire alarm devices being added to an existing system for the IVR Project of the Quinn Building at Umass Boston, 100 William T Morrissey Blvd.
Furnish and install electrical power wiring associated with lighting and receptacles and Low Voltage Tele/Data wiring for the new UMASS Immersion Virtual Reality Suite Buildout. Th…
Work performed at University Hall 1032. Demo HVAC power, provide new power to HVAC units and owner supplied UPS system.
Install 2 duct detectors at University Hall 1032
install lights and power at Service and Supply building
to bring women's bathroom up to code, install new carrier and pipe 2 new sinks as well as pipe new floor drain
Erect temporary Performance stage / roof "2024 Mass Boston Commencement" 5/16-5/26 40x60 stage w/ 55x65 8-post roof (2) video wings
Install wall lights and receptacles on Wheatley Building Terrace
install (5) fire alarm devices
Work at EHS Office & IT Workshop. Demo existing structured cabling and install new.
Work at EHS Office & IT Workshop. Electrical demo, make safe, install new power for lights, receptacles, panelboard and HVAC. Install low voltage raceways.
Work at EHS Office & IT Workshop. Demo fire alarm and install new devices.
Installation 6/ 4' led lights, 3/ 30 amp single pole circuits and misc plugs for new Boston Fire communication equipment.
install (10) receptacles in parking office
Installation of low voltage cabling and headend equipment on the campus of University of Massachusetts - Boston.
Provide low voltage wiring for HVAC upgrades. All work will take place above ground.
Data and card access wiring at the Clark Athletic Center
install new light fixtures on outside of building facade located at center of campus
Re-model of Plant management office.
1st and second floor work at the Clark Athletic Center. Demo, new lights, new power for locker room renovations
1st and 2nd floor Fire Alarm Work at the Clark Athletic Center. Install new devices to accommodate renovations
adding 1 gas solenoid valve in the level 1 kitchen at UMass Boston
Install (18) 2x2 light fixture in McCormack Building
Rework existing lighting and add power at the McCormack Veterans Center
Install (5) lights poles at the Quinn building
Erect temporary performance stage/roof "2023 UMass Boston Commencement" 5/19-5/26 40 x 60 stage w/ 55 x 65 10-post roof (2) Audio Scaffolding structures
Clark Building, install (8) light fixtures.
Campus Center Building, re-work (15) cubical feeds.
Wheatley Building, Replace 85 light fixtures.
Quinn Building, install (14) light fixture
panel to panel connections/cubicles
Replace light fixtures in Wheatley Hall Building, hallwall.
Emergency repair of underground conduit and wiring of gas pump station
Re-work lighting and power due to new roof installation at the McCormack Building
U Mass Boston Harborwalk Lighting Replacement
Replace existing lighting in the 4th floor hallway of the phycology area in the McCormack Building .
Replace existing lighting in the 2nd floor lobby of the Quinn Building.
Re-work existing areas on the 1st and 2nd floor of the Wheatley Building.
Re-work existing areas on the 1st and 2nd floors of the McCormack Building
Domestic Hot Water Pump Upgrades Replacing (2) existing 480v pumps with (4) new 120v pumps.
Re-model existing area in the McCormack Building.
Loading Dock Repairs
Installation 6/ 4' led lights, 3/ 30 amp single pole circuits and misc plugs for new Boston Fire communication equipment.
Add one duct smoke each into the supply and one duct smoke each into the return of the refurbished AHU 1 and AHU 2 tied into the existing fire alarm system at the U Mass Boston Hea…
Electrical work supporting the refurbishment of AHU-1 and AHU-2 at the U Mass Boston Healey Library
Re-model existing classrooms in McCormack Hall. Rooms M1-612 & 616, Rooms M2-208 & 209, Room M2-211.
Re-model existing classrooms in Wheatley Hall. Rooms W1-40 & 42. Rooms W2- 156 & 158.
Install 1200 amp feeder for temporary HVAC chiller
Swapping out and old 800 Amp Panel Board for a New 800 Amp 3P 480 Volt Panel Board and also piping and wiring a 100 Amp Pri Feed to a 75 KVA Transformer. We will Pipe and Wire a 20…
A. Provide complete power limited analog-addressable selective audio evacuation fire detection and alarm system with firefighter's communication controls. System shall include, but…
Install new lighting control system at the Vivarium Integrated Sciences Complex
Installation of (9) flagpole lights
UMASS BOSTON @ WHEATLEY HALL BUILDING 5th floor = offices #5-03 & 5-4A. Add TWO (2) 120 volt general use receptacles on new partition. Swap out the existing office light fixtures a…
Upgrade and Install new equipment for Quad 5 Project
Evaluation of water-damaged electrical equipment
Scope: Install Heat Trace on new Plumbing lines. Install 9 New Heat Trace controllers Install 2500 LF of heat trace plus all required fittings and accessories
We will be disconnecting lights , conduits and GFI receptacles on the roof so the roof can be replaced , then returning to re-install all electrical equipment. We will be replacing…
Run new overhead feed from existing MDP to proposed temporary cell tower. Tower and equipment to be located across the street from central parking garage in empty field. Address is…
Renovation to UMass Boston, Quinn Building, Machine shop. Including (2) new panelboards (480/277v & 208/120v) and busway and associated circuits
Installation of new lights and receptacles for Green House
Miscellaneous electrical demolition in center of campus Quad.
Provide electrician labor and material to install Controls for chill water system, and refrigerant monitors. JCI177x
Umass boston clark athletic office renovation
Miscellaneous conduit repairs to the McCormick and Wheatley buildings.
Provide new wiring to new chillers, pumps, HVAC equipment and Lighting.
Install wiring within office cubicles on 1st and 2nd floors of Quinn Building for UMASS Boston
Replace light fixtures at Clark Ice Rink
399500 - UMass Boston Pedestrian Bridges Installation of (6) Roof Drains and associated piping on pedestrian walkway roof.
Install wiring within office cubicles on 3rd floor for Umass at the Wheatley Building
Install low voltage cable and system components associated with an AV system upgrade at 100 William T Morrissey Blvd for Umass Boston Quinn building
Install wiring within office cubicles on 3rd floor for UMass Boston
Provide wiring for 1 environmental room
Installation of 318.78 KW roof top solar array on the University Hall Building
Installation of 677.60KW solar canopy on garage west and battery storage system
Installation of new emergency generator and associated automatic transfer switches
Install low voltage control wiring for new Johnson controls on new HVAC equipment in Quinn & Healey buildings. Controls installed on VAV boxes and Fan coil units
West Building - Electrical associated with replacement of (2) security turnstiles. Add power for door openers.
West Building - Provide low voltage cabling to re-wire two existing card readers serving the turnstiles.
West Building - Add (1) control module to operate turnstiles that are being removed and replaced.
East Building - Provide low voltage cabling for a new turnstile card reader. Re-wire two existing card readers. Install cabling for one new security camera & install camera.
East Building - Electrical associated with replacement of (2) security turnstiles and addition of (1) new turnstile. Relocate (2) walls to make space, rework lights and receptacles…
East Building - Remove and relocate (3) fire alarm AV devices to accomodate minor wall relocations. Add (1) control module to operate new turnstile that is being added.
Temporary electrical service derived from generators to provide power for production services for UMASS Boston Commencement on May 30 and May 31st 2019 on the Campus Center Lawn.
Renovations to the Quinn & Healey buildings
Healey Building 11th Floor renovation
Renovations to the Quinn Building
Fire Alarm Renovations to the Healey & Quinn Buildings
Erect temporary stage(s) for "Mass Boston Commencement 2019" 5/25/19 - 6/3/19 65' x 55' stage w/ roof @ 33' high (5) 56' x 3' seating tears (2) 20' video wings 68' x 45' x 5' stage
Install low voltage control wiring for new Johnson controls on new HVAC equipment in Wheatley & McCormack buildings. Controls installed on VAV boxes, Fan coil units & AHU's
UMASS Boston - Healey Library Heat Trace, Misc low voltage HVAC control wiring - JAG, 186765
UMASS Wheatley Building---Install Tel/Data, BDA and AV cabling and Equipment for renovation of various areas on Levels 1 through 4.
UMASS McCormack Building---Install Tel/Data, and AV cabling and Equipment for renovation of various areas on Levels 1 through 5.
Relocate existing FA AVs and install new FA devices for Renovations of various areas at the UMASS McCormack Building Levels 1 through 3.
Relocate existing FA AVs and install new FA devices for Renovations of various areas at the UMASS Wheatley Building Levels 1 through 4.
UMASS Boston, Wheatley Building: Demo existing Electrical, install temp lights/power, install new power, distribution, lighting, mechanical feeds, and Low voltage conduits. Renovat…
UMASS Boston McCormack Building: Demo existing Electrical, install Temp Light/Power, New Lighting, New Power, New Distribution, New Mechanical Feeds and low voltage raceways for re…
Install Temp Services to (2) Construction Trailers at UMASS Boston Wheatley/McCormack Buildings
Installation of parking equipment at new parking garage. Installation of 7 gates, 14 loops, 3 entry devices, 4 exit devices, 7 LED signs, and 6 pay on foot credit card machines. In…
UMass Boston West Building - work associated with electrical finishes in entry vestibules
UMass Boston Student Housing - East Building, finish work associated with entry vestibules.
UMass Boston Student Housing - site electrical work including installation of site lighting, landscape lighting.
Install two new surface mounted light fixtures in new bus shelter, install new underground conduit from building out to serve new fixtures. Connect new conduit to existing site lig…
Remodel Dunkin donuts. Replace hand sink with three bay sink with grease interceptor, misc indirect drains & coffee water lines, new hand sink
renovation of coffee shop
Installation of a 75kVa Transformer for NSTAR
Electrical Installation of Temperature Controls at Dorms
New Installation/ New Construction
New Construction
Temporary power and lighting
Temporary generator power and electrical distribution for Mayoral Debate at the UMass Boston Ballroom on October 25th of 2017.
Removal and new installation of lighting and branch circuits for rehab project at the Clark Athletic Center, University Of Massachusetts Boston.
New construction of an 8 story parking garage
60 amp 120/240 single phase service to feed monitoring equipment for natural gas regulation and control
New installation of disconnects, MI cable, Automatic transfer switches, conduit, feeders, branch circuits, lighting and receptacles for upgrades to elevators at the university of M…
Wiring for new addressable fire alarm system to serve the new ground-up student housing building at UMass Boston - East Building.
Wiring for new ground up student housing building including lighting, site lighting, conv, power, HVAC power, distribution equipment, generator etc. West Building.
Furnish & install telephone and data cabling, security system cabling and camera system cabling - West Building
Furnish & install telephone and data cabling, security system cabling and camera system cabling - East Building.
Wiring for new addressable fire alarm system to serve the new ground-up student housing building at UMass Boston - West Building.
Wiring for new ground up student housing building including lighting, site lighting, conv. power, HVAC power, distribution equipment, generator etc. East Building
Fox Point Dock Replacement Project. New wiring associated with new lighting for gangway, handicap ramp, and docks as well as wiring for power pedestals and prefabricated buildings…
Banc of America 50 Morrissey Boulevard Dorchester, MA 02125 Low voltage electrical 45 new tel/data locations job number 17-0075-60
Temp power for construction of two new dorms.
Install addressable control modules on 9 new fire dampers in the elevator machine rooms
Install new 100A panel boards in the elevator machine rooms to support the new HVAC equipment
installing (4) EMON current usage meters
UMASS Boston Campus Wide Heat Trace Installation for Plumbing Piping
Wiring for VDC Lab renovation, 3rd floor Wheatley Building
Install outlets and light fixtures in Campus Center Book Story (UMass Boston)
Temporary generator power and electrical distribution for the UMass Boston Block Party event outside the Clark Gym on June 17th of 2015.
demo 4 lights, move 1 light. add 5 new lights, and 1 CO. and install 1 new 277volt VAV
Low voltage wire work at UMASS 100 Morrissey Blvd job number 14-0376-10
Disconnect and reconnect chiller and air handler install new 60 AMP panel wire three motors
Install a Johnson Controls HVAC control system at the new General Academic Building at University of Mass Boston campus. Work is on all floors (1st - penthouse)
Installation of pole lights and underground conduits.
Install low voltage cable and Audio Visual System Components
Install 400A, 480V temporary services from Clark Building existing MCC to new 800A 208V temporary trailer service shed.
Install two motor starters for in line fans 7.7HP@ 480V
Install new campus 15KV primary loop cable and install new 15KV services at at (6) existing campus buildings. New Campus site lighting.
New Campus site lighting, fire alarm & communication campus loop
Installation of new UMASS Campus 15KV & Communication concrete encased ductbanks (137,000'-4" PVC. 13,300'- 5"PVC & 59,000' - 6"PVC)
UMASS Healy Library - Misc. low voltage HVAC control wiring - PAG 141571
Replace humidifier water and drain for Healey Library Book storage room.
Temporary generator and temporary power for a renuion 'block party' event at Umass Boston on June 18th of 2014.
Healy Library Archive Room - Misc. low voltage HVAC control wiring PAG - 141304
University of Massachusetts Utility Plant Fire Alarm System Modifications to existing fire alarm system.
Installation of communications and power ductbanks
Healey Library 5th floor Archive Storage Renovations. Renovations to storage RM # 05-10C & Mech RM # 05-17A including lighting, Lighting Motion sensors, 60 Amp Sub-panel, outlets,…
Office Remodel of 2 floor in McCormick Building
New Lighting for Healy Library Penthouses
Wiring for Mcormack and Wheatley Hall office Renovations