Building permit intelligence · Boston, MA
135 William T Morrissey Bl has 170 municipal building permits on file in Ward 13. The latest recorded activity was a electrical permit permit dated Jul 28, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 3 mapped permits within 500 m of this address.
Connecting 20 office cubicles at 135 Morrissey Blvd 1st floor, Boston, for Hyperice.
Low Voltage
Low Voltage
Fire Alarm
Fire Alarm
Fire Alarm
3 mapped permits within 500 m, shown on the intelligence map above.
7 other addresses on William T Morrissey Bl with municipal permit records in Boston.
This address has 170 permit records in PropertyLabs' public history and is located in Ward 13. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 2, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 135 William T Morrissey Bl is dated Jul 28, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 135 William T Morrissey Bl in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Electrical
Electrical
Electrical
Plumbing
Plumbing
Plumbing
Electrical
Electrical
Fast Track Application
Fast Track Application
Electrical
Solar Panels
Solar Panels
Solar Panels
Electrical
Electrical
Amend ALT1631762 - 1st floor added scope includes new mezzanine level &;new conference room on existing mezznine level, structural, drywall, electrical/FA, sprinkler, plumbing HVAC…
change occupancy to add after school & summer camp program for children - work includes: Interior tenant fit out to include new mezzanine level with stairs and elevator, new drywal…
Kelonia Therapeutics 24-0063-10 300 Cables
Office, Agency/Professional Office, Research/Development, Product/Development/Prototype Manufacturing, Laboratory, Light Manufacturing, Restaurant, Bar, Bar with Live Entertainment…
Add new power in existing lab space for Kelonia fit out.
Lab Renovation
The scope of work includes converting existing shell space to accommodate future tenant fit outs by upgrading HVAC, plumbing, and electrical systems. New structural dunnage will be…
Office, Agency / Professional Office, Research / Development, Product / Development / Prototype Manufacturing, Laboratory , Light Manufacturing, Restaurant, Bar, Bar with Live Ente…
To allow BCP Beat Property LLC to change the occupancy to include, in addition to the existing uses, the following uses: Adult Education Center, Professional School, and Trade Scho…
26 security devices on the 1st and 2nd floors of 135 Morrissey Blvd for tenant SouthLine Portal (TK236305)
Furnish and install automatic temperature control wiring for the "Teaching Lab" Space consisting of 3 Fan Coil Units and 1 Exhaust Fan.
Office, Agency/Professional Office, Research/Development, Product/Development/Prototype Manufacturing, Laboratory, Light Manufacturing, Restaurant, Bar, Bar with Live Entertainment…
Amendment to building permit #ALT1258857. Attached documentation should only highlight information related to the updated control area boundary. All other attachments can be found…
Lab/Office fitout. Amendment the Building Permit App ALT1451142.;Seeking to substitute a fire barrier for an unrated glazing with special purpose window sprinklers.;eplan -- BBRS g…
Job#23-128, MJA-Beat Food Hall Exist Ltg. Rework for ACT Clg. Add; Remove and Re-Install of Nine (9) Track Fixtures and Nine (9) Pendants.
Installation of the new HVAC Energy Management System for "THE BEAT SOM C&S LAB PHASE II" Core & Shell space.
Installation of the new HVAC Energy Management System for the "Portal Fit-Out" space.
Installation of the new HVAC Energy Management System for the "NORTH LAB" Core & Shell space.
Connection of (2) temporary generators for outdoor event. Proper grounding will be installed.
Erect 8x16x24" platform on 10/27/23, removal on 10/27/23.
The fire alarm scope of work for this project is limited to adding a smoke detector in the new atrium bar ceiling, as well as in the new electric closet which is being installed to…
Very small tel data fit out for low voltage, 1st floor teaching lab. 4 data cables and patch panel within suite.
Low voltage Telecommunications fit out 1st and 2nd floors. New voice/data cabling for Tenant fit out for network connectivity.
Add Restaurant w/ seating to Occupancy - Atrium - 1st Floor -; New food &; beverage station within main atrium space work includes new drywall, electrical/fire alarm, plumbing, spr…
Interior renovation for future Teaching Lab space. Short Form application being submitted per ISD request. At Risk: Adult Education Center, Professional School &; Trade School.; Pe…
Install access control and CCTV
FoodCourt Bar area - install ceiling.
Office, Agency/Professional Office, Research/Development, Product/Development/Prototype Manufacturing, Laboratory, Light Manufacturing, Restaurant, Bar, Bar with Live Entertainment…
1st & 2nd floors: New power and lighting for office/lab tenant fitout. New panels and transformers to accommodate new power and lighting needs.
1st & 2nd floors: Newfire alarm devices for office/lab tenant fitout.
prep work for new tenant space remove walls and flooring - Atrium 1st floor full permit under review ALT 1448756
New power and lighting for office and lab space. 2 new panels and a transformer.
New fire alarm devices for lab and office space.
Lab/Office fitout with new finishes and new mechanical, electrical, plumbing and fire protection equipment and runs. The first floor will consist of offices, labs and individual me…
Lab Fit-Out
The scope of work includes converting existing shell space to accommodate future office and laboratory building suites and upgrading HVAC, plumbing, and electrical systems. New str…
Lab Fit Out
Office, Agency/Professional Office, Research/Development, Product/Development/Prototype Manufacturing, Laboratory, Light Manufacturing, Restaurant, Bar, Bar with Live Entertainment…
Install wiring within office cubicles on 1st and 2nd floors for Nobull.
install 2 gas water heaters
Upgrade the existing addressable Autocall system and wiring in the SOM Building fitout.
Office, Agency/Professional Office, Research/Development, Product/Development/Prototype Manufacturing, Laboratory, Light Manufacturing, Restaurant, Bar, Bar with Live Entertainment…
Office, Agency/Professional Office, Research/Development, Product/Development/Prototype Manufacturing, Lab, Light Manufacturing, Restaurant, Bar, Bar with Live entertainment, Baker…
New fire alarm devices to support core & shell upgrades. Levels 1-4
Core & Shell upgrades on levels 1 through roof. New breaker's in existing substations to feed future tenant spaces. New panelboards for new mechanical equipment. New generator & AT…
Core & Shell
Core & Shell (Southline Boston Lab - South)
Cafe Fit Out
22-0272-10 AV Cabling NOBULL
Job#22-175, MJA-Beat SOM Ph. 2 Core Shell; Core Shell Renovation for SOM Building Ph. 2 Infrastructure. 1200A Dist. Add with Feeder from SOM USS2 to SOM building Threshold (FBO-Gas…
Office, Agency/Professional Office, Research/Development, Product/Development/Prototype Manufacturing, Lab, Light Manufacturing, Restaurant, Bar, Bar with Live entertainment, Baker…
15 security devices on the 3rd floor of 135 Morrissey Blvd for Nordblom (TK226285)
Permit amendment as requested by Pat Curran (inspector on the Southline Phase 1b project, ALT1287665). This is ONLY for a mechanical shaft that was relocated slightly on the floor…
Job#22-206, MJA-Beat Atrium Bar; F&I of 100A Feeder with Panel to Serve Atrium Bar. F&I of Accent Ltg. Atrium Bar Kick Space. Branch Power with Branch for Small Atrium Bar for Equi…
Add Gas Shutdown Relay and Roof Hydrant Monitoring Module at Rooftop Mechanical Room to Serve Rooftop Lounge.
Install wiring within office cubicles on 3rd floor for The Beat (Suite E).
The BEAT - NOBULL Headquarters. Misc. Low Voltage HVAC Control Wiring. KG - 220993
3rd floor Suite A & D. Add (2) relay modules, (1) for each suite, to interface to the tenant security system to unlock all card reader egress doors upon fire alarm system activatio…
Job#22-194, MJA-Beat AV Infrastructure Raceways with Cable (FBO) Installations Only. Furnish and Install of Two (4) Receptacles with Branch at Tel/Data Closets for Equipt. Racks.
Gas line to existing boilers on the first floor and gas piping up to pent house to feed gas water heater. Gas line also going to the roof for generator.
NoBull 135 Morrissey BLVD 474 Cables
Renovation of existing building providing Core & Shell bathrooms for future labratory/office spaces.
install parking space id's install two illuminated parking ID signs
25 security devices and 127 telecom drops on the 1st and mezzanine floors of 135 Wm T Morrissey Blvd for tenant NoBull (RS227615, TK226320)
The Beat - "SOM building" Phase 2 core and shell renovations 1-4th floorseplan
3rd Floor Suite E & B. New Tel Data fit out and Security Rough
Job#22-170, MJA-Beat Food Truck Pedestal Feed Outlet - Cat 6 for POS Exterior Installation.
Job#22-161, MJA-Beat Rooftop Terrace Adds Requested. Branch Power Adds and Gas Controls for Outdoor Fireplaces.
Install Gas to 2 Gas Fire Pits
Office, Agency/Professional Office, Research/Development, Product/Development./Prototype Manufacturing, Laboratory, Light Manufacturing, Restaurant, Bar, Bar with Live Entertainmen…
Minor Demo Then renovation Most work will be on 1st floor with a second Lavatory, Toilet and Pantry sink to go on 2nd floor
Amendment to ALT821591. Build a loading dock in the North Courtyard. This area is currently an exterior brick facade wall.eplan
New Fire Alarm system for tenant fitout.
Tenant fitout, with new power and lighting.
Office And Lab, Fitness Rooms, Game Room, Conference;RoomsTemporary Certificate For 90 Days For Offices / Labs On 3rd Floor, Core and Shell spaces on 1,3,4 . To Expire 10/8/2022ALT…
remove 1st floor slab 5000 square feet
Install wiring within office cubicles on 3rd floor for Boston Globe.
Office fit out of core shell space of approx. 75,000 sq. feet on 1st level at 135 Morrissey blvd. Work includes new offices, conf. rooms, kitchen, restrooms, showers, sauna,work ou…
clarify for certificate of occupancy of current ALT 821591 of the core /shell renovation of existing building, including common areas, fitness rooms, game room, conference rooms, t…
The BEAT, Spec Lab - Phase 1B. Misc. Low Voltage HVAC Control Wiring. KG-220561
The BEAT - Food Hall. Misc. Low Voltage HVAC Control Wiring. KG-220331
Office, Agency/Prof. Office, Research/Dev, Product Dev. or Prototype Manu, Lab. Light Manu, Restaurant, Bar, Bar w/Live Entertainment, Bakery, General Retail Business, Local Retail…
Job#22-088, MJA- Beat Fitness Center Adds Bull#113 1st Floor; Add of One (1) 4' Light with Branch and Control. Add of (2) Duplex for Added Reception Counter. Add of Four (4) Duplex…
Install fire alarm system wiring in the food hall and kitchen at the first and second floor levels
Install smoke detectors, beam detector and speaker strobe devices in SOM Atrium as part of smoke control system.
Job#22-084, MJA-Beat West Shite Box Temp Adds; Add of Twelve (12) LED Temp Fixtures and Repair of Existing Exits for Egress.
SOW includes interior renovations with selective demo, new GWB partitions, flooring, ceilings, as well as upgrades/re-work and tie-in to existing plumbing, fire protection, HVAC an…
SOW includes interior renovations with selective demo, new GWB partitions, flooring, ceilings, as well as upgrades/re-work of existing fire protection system, plumbing, HVAC and el…
3rd floor Suite B, C, & E. New power and lighting for lab space. New panels and transformers to feed space.
3rd floor Suite B, C, & E. New fire alarm devices for lab space fitout.
Lab Fit Out
3rd Floor Suite A & D. New Tel Data fit out and Security Rough.
The BEAT - Lab Fitout Phase 1A. Misc. Low Voltage HVAC Control Wiring - KG-220141
Miscellaneous electrical items to closeout job. Original permit for the job was closed last year.
Gas piping commercial kitchen
Plumbing demolition in support of atrium repair.
3rd floor Suite A & D. New power and lighting for lab space. New panels and transformers to feed space.
3rd floor Suite A & D. New fire alarm devices for lab space fitout.
Plumbing connections in support of a food hall fitout.
Job#22-001, MJA-135 Morrissey Beat Food Hall; Food Hall Tenant Fit Out, SOM Building. Add of Three (3) New Dist. Panels for Kitchen Loads. Lighting with Lighting Controls and Power…
Lab Fit-Out
Job#21-224, 135 Morrissey, MJA-Beat SOM Atrium FA Exhaust Fan Unit Replace.
Job#21-225, 135 Morrissey, MJA-Beat SOM Temp Feeds for Construction Heaters.
Gas piping to support office fit out
Core &; Shell Upgrades for Lab Tenants. New dunnage platforms for additional mechanical chillers, new AHUs and new Exhaust Fans. New Freight Elevator.eplan
Amend ALT821591 to include responses to BFD's comments generated during Smoke Evacuation testing of the main building atrium (ISD inspector indicated that a permit amendment should…
Interior fit-up of the Morrissey Hall food hall dining area and lounge space. Work includes new plumbing, electrical and HVAC systems, new framing, drywall, millwork and food equip…
Install Low Voltage wiring for 20 Valve Irrigation System
Fit out
Tenant fitout of open tenant space on level 3 of existing building.
Removing/replacing (6) antennas and removing (3) RRUS and adding (6) RRUs, adding (2) 6x12 hybrid cables, removing (1) equipment cabinet and adding (1) equipment cabinet and (1) ba…
Lab Upgrade
Lab Upgrade
Install toilet rooms on 4 floors, new roof drains, and new waste, vent and water piping.
Install 1-Babfar Temp Heat Furnace. addition of unit to existing gas permits, G1028812, G925438.
150 security devices installed on all 4 floors of 135 Morrissey Blvd for tenant "The Beat". (TK206100)
The Beat, low voltage HVAC control wiring 197551, PAG
99 telecom drops on the 1st, 2nd 3rd and 4th floors of 135 Morrissey Blvd for "The Beat" (RS207120)
30 security devices on the 1st, 2nd 3rd and 4th floors of 135 Morrissey Blvd for "The Beat" (TK206100)
Intall 4-Babfar Temp Heat Furnaces
The Beat Heat Mat, Misc low voltage HVAC control wiring - NPB, 197261
Ammend ALT821591 to include structural changes to components of the new foundation after permit was issued. Cost is reflected on ALT821591.
all floors
all floors fire
New Gas pipe installation in building being renovated. 16" welded gas main connecting to, gas booster,roof top units, water heaters and boilers.
Renovation of the former 4 story Boston Globe building . Renovation will result in a code compliant, " Tenant Fit-out ready" (Mixed use) space. Projects also includes improvement t…
Site preparation permit including selective demolition, concrete , and mini piles in preparation for ALT821591. Cost is reflected on ALT821591.
Complete gut out of interior finishes/executive offices in association with alt821591
Erect 30x60 tent on 6/5/18. Removal on 6/6/18.
Complete gut out of interior finishes
Remove portion of front window,disconnect plant services to press (electrical,plumb,ect...)demolition of existing quite room and floor system,dismantle and remove press and associa…
descont of exsting electrical to press
Replacing 3 existing antennas with 3 new antennas. Propose 3;additional antennas mounted on the existing tower on the roof. Additionally related equipment will be located on a new…
INSTALLATION OF 8 SOIL BORINGS
annual electrical maintenance
Add three (3) radio heads to serve existing panel antennas.
replacing old fire alarm panal
Spot Light Movie Location. Install temporary generators for Lights and Power to shoot Movie in Globe Building area on 10/1/14 Dave Norcott is the electrician 508-631-0666
Spot Light Movie Location. Install temporary generators for Lights and Power to shoot Movie in Globe Building area after hours inspection will be required. Dave Norcott is the elec…
Furnish & install of (1) new 100amp 120/208 feed to new cabinet. Rework existing circults to cabinets
annual electrical maintenance
Temporary generator for film production
Temporary generator for film production
Modification of an existing wireless communications facility, all as depicted on the plans.
remove and replace existing cabinet with one of equal size, shape and weight
Applicant seeks to modify existing antennas on existing telecommuncations tower site.
One test boring adjacent to Boston Globe building
trench excavation manhole & pipe replacement of existing fueling system. Rear of building Boston Globe. Backfill and asphalt replacement