Building permit intelligence · Boston, MA
114 Western Av has 157 municipal building permits on file in Ward 22. The latest recorded activity was a lvolt permit dated May 15, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 1 mapped permit within 500 m of this address.
Low Voltage
Electrical
Electrical
Low Voltage
Low Voltage
Low Voltage
1 mapped permit within 500 m, shown on the intelligence map above.
7 other addresses on Western Av with municipal permit records in Boston.
This address has 157 permit records in PropertyLabs' public history and is located in Ward 22. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 114 Western Av is dated May 15, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 114 Western Av in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Low Voltage
Electrical
Gas
Gas
Gas
Gas
Gas
Gas
Gas
Solar Panels
Other
Other
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Renovations - Interior NSC
Renovations - Interior NSC
Fire Alarm
Electrical
Electrical
Fire Alarm
Plumbing
Plumbing
Installation of 2 - 15kv breakers in he DEF building and the installation of 2 - 15kv circuit from the DEF building to a manhole outside Western ave
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Remodle of 3rd floor office space
Renovations - Interior NSC
Fire Alarm
Fire Alarm
Demolition - Interior
Demolition - Interior
Electrical
Electrical
Solar Panels
Solar Panels
Solar Panels
Solar Panels
Other
Other
Renovations - Interior NSC
Renovations - Interior NSC
Low Voltage
Installing video conferencing and presentation system.
38 telecom drops on the 3rd floor of 114 Western Ave for Harvard University HRE Amenities space (LW227635)
Addition of three horn strobes
Tennant fit out of HRE convenience space to include plugs, lights, fire alarm and wiring of three VAVs all gear is existing to remain
Business Offices, Retail, Daycare, and Classrooms and Offices;Certificate for: Office(s) - 2nd fl.ALT1273154 issued 2/7/22
Install Schneider Building Automation System for ENE Systems @ 114 Western Ave Flr 3 Amenities Space
New Framing and Finishes for new office and conference room
Provide and install new break room sink on 3rd floor.
Install wiring within office cubicles on 2nd floor for Harvard Business School.
Remove & relocate section of existing gas main
Installing new devices to existing fire alarm system
Harvard Business pantry renovations at 2nd floor
Install Schneider Building Automation System/ HVAC Controls for ENE Systems. Floor 2 fitout
Project description: Electrical fit out of existing space (2nd Floor Partial): 7 HVAC Fan Power Boxes and 20 HVAC VAV’s. (2) 100a / 480v lighting panels, (1) 225a / 480v panel, (1)…
300 telecom drops on the 3rd floor of 114 Western Ave for Harvard HBS Co-Lo (LW227090)
Business Offices, Retail, Daycare,;Classrooms, Offices and Coffee Shop.Certificate for Office and Coffee Shop only.ALT1089178 Issued July 15, 2020 &; ALT1180982 Issued January 13,…
Fast Track Application for interior renovation of 16,000 SF of office space at 114 Western Ave on the second floor. Scope includes selective removal and upgrade of finishes such as…
Permit fee included in ALT1089178. Use to be a coffee shop with office space for Harvard Police. Occupancy of Coffee shop is 49.*Denied for 49 persons; APPROVED for 23 PERSONS per…
Business Offices, Retail, Daycare, and Classrooms and OfficesCertificate for: Offices 3rd floorALT1190494 issued 5/17/21
Temp. use of occupancy as a Coffee Shop from 8/13/21 - 2/13/21
Scope of work is to install card access to two doors on the third floor @ 114 Western Ave.
Water piping to install a coffee maker
Harvard Allston Land Co - 3rd Floor -; Renovations of Offices and Common areas on the 3rd Floor for Harvard University. Work includes removal of finishes, drywall, patching, painti…
Provide and install sub and spec combined lighting fixtures per plans and schedule Lutron lighting controls per plans Furnish and install panel boards and transformer tied into an…
FA work for an office space on the 3rd floor. ELA116x
Install Schneider Electric Building Automation System for ENE Systems- Flr 3 Fitout
56 telecom drops on the 3rd floor of 114 Western Ave for Harvard Allston Land Company (LW217155)
24 telecom drops on the 1st floor of 114 Western Ave for Harvard University (LW207330)
Install one (1) 58.75" x 22'-11" W wall sign. Letters to be internally illuminated with white LEDs. Background to be Opaque. To read "Fuel America, Coffehouse Cafe" Install one (1)…
to install 1 mop sink, 4 hand sinks, 1 3 bay sink and 1 dishwasher on the 1st floor
Renovation of existing space to retail
renovation of existing space to retail space
1500 SF fit-out of Harvard employee area. New drywall, finishes, minor relocations of Fire Alarm, Sprinkler and misc M/E/P work.;;;;;;;;;;;;;;;;;;;; E- Plans
Begin demolition framing and rough work associated with ALT 1089178 Fast Track
Begin demolition, construction of rough frame, electrical, pending issuance of ALT 1089178 F/T.
Install (6) Parking Pole Lights and (2) Security Phone.
Install Fabric Mesh Graphic Banner System to building facade recess. eplan
Business Offices, Classrooms,;Offices;;Day Care and Retail.; ALT880357 Issued 12/3/18, ;A912937;Issued 2/13/19 &; ALT1006577 Issued 10/10/19 ;
Need to add Day Care and retail use to this address. original description of work on approved ALT. 880357 and A912937. A TCO # COO 1002472 was issued 9/19/19 and need to convert TC…
Business Offices, Classrooms,;Offices &;;Day Care Temporary;Certificate for the;Business Office(s);- ONLY.; ( Excluding classrooms, day care and assembly space on the;3rd;floor).;…
S19-919, connect jumpers, receptacles and plug in base feeds for office workstations.
Conduits needed for security wiring getting out to new gates only. (install new PVC from exterior walls, out to 2 new gates in yard outside of building in playground)
Furnish & Install card access to (28) doors, (14) motions, keypads,and (10) camera locations on the 1st floor Furnish & Install card access to (9) doors and (5) cameras on the 2nd…
Job# 19-0203-10 Harvard University
Install Schneider Building Automation System- ENE Sytems
Amend ALT- 880357 to include HU day care center on 1st level per amended IMP. New spaces, bathrooms, snack areas, areas separated by age groups. No work to be done. Cost and work r…
Demo of existing tenant and new tenant fitout for each floor.
Demo of existing tenant and new tenant fitout for each floor.
600 telecom drops on the 1st, 2nd and 3rd floors of 114 Western Ave., Allston for Harvard University
Renovation of existing building into day care and office space
Complete interior demolition and reconstruction of interior spaces on all levels. Change occupancy to classrooms, offices (1st level). New and reused MEP's, FA/FP.
Renovation of existing building into day care center and office space
Interior demolition of 3 levels in this building for new departments and add 1st level Day Care center. Full ALT permit ( # 880357) was applied for 9/18/18.
Utility duct and street lighting
DEMOLITION OF WEST ENTRY VESTIBULE FOR FUTURE WORK BY OTHERS
Minor interior demo on 1st level and removal of West entry doors ( outside canopy removed later). Associated FA/elec. work related to demo and entry closure.
Excavate 25 test pits to classify soil conditions. Existing paring lot area- vacant land.
Business Offices and Gym.; Certificate for the 2nd floor office ALT653098 issued: 1/24/17
Minor interior renovation. Add 4 FA devices, Add 1 sprinkler head, frame new walls, finishes.
Install 4 new A/V Devices and replace 4 existing A/V devices
Remodel of space on 2nd floor
Install telephone & data cables for New Office
Provide electrical feed to new server in grill room
Kitchen sink, icemaker, ejection pump and electric water heater
tenant buildout first floor
add three strobes and one horn strobe
Tenant finish project with no structural changes of an office space. Scope of work is to construct new partitions to create 3 small conference rooms and 5 small offices, new archit…
Construct 3 small private offices ( "phone booths" ) within the existing finished space. No demolition required. Scope of work is to constrct new sheetrock walls with sound insulat…
replace lights ,addoutlets.
Audio Visual and Sound cabling
relocation of sprinkler heads and fire alarm modifications to meet requirements for interior renovations. narratives being submitted with plan
Kitchen sink installation with piping and installation of water heater
wire first floor office space.
relocate strobes in the restrooms
Renovate existing office space - Build new 7' tall partitions (existing ceiling is 8'6" high ) to surround new conference room, install 3 sliding doors into 7' tall conference room…
Replace 3 toilets, 1 urinal, 4 sinks, 2 showers Replace water heater
Install new lighting and outlets in bathrooms on 1st floor
renovate men and womens bathroom. new floor tile, sheetrock, paint, fixtures, electrical, plumbing and HVAC
Removing existing rooftop air handler and replacing with a new gas-fed one. Gas piping will be added to the existing gas piping on the roof.
114 Western Ave - Misc. Low Voltage HVAC Control Wiring; RTU disconnect reconnect SGG 130393
rewire 2 bathrooms second floor
replace 5 toilets, 2 urinals, and 2 lav sinks in 2nd fl mens and ladies room with new fixtures
Renovating too bathrooms : new tiles , toilet partitions , acoustical ceiling , toilet fixtures , vanities , lights and paint.
Install one fire alarm audio visual device. Relocate one audio visual device.
Relocate lights and switches and outlets as needed for office renovation.
interior renovations. sheetrock, paint, carpet
rewire 2 bathrooms
Legal Use and Occupancy is Offices and Fitness Center Certificate of Use and Occupancy for Fitness Center ALT79047 Issued 3/7/12 No Work
Add the use of Fitness/exercise facility to the building.*Plans 8/01/2011* Plans 1/17/2012 &; 2/22/2012
Legal Use and Occupancy is Offices and Fitness Center. Certificate of Use and Occupancy for Fitness Center. ALT79047 Pending Board of Appeal Approval. Temporary Certificate to Expi…
new telephone and data
Add outlets, switches and rework existing lighting
Renovation of existing restrooms , adding new means of egress, flooring, painting and interior dimising partitions. All work in common areas.
Frame up new office partition walls, Patch ceilings, data work, new doors, paint and carpet - 2 floor "D2Dfund"
demo associated with long form #Alt91333 (cost reflected &; contract;- demo cost;included on long form)
Painting , New Carpet Installation. new light sensors,Relocate existing sink.
Gas piping to roof top units Special Projects
Misc HVAC Power and Interlock wiring. 118919 SGG
Strip and Reroof
add fiber optic cables
; Business office C/O-For Offices 2nd. fl. -Only permit# sf17851, issued 3/12/10, 02-18330, issued 4/5/10
Interior modifications for commercial, tenant office space. Includes new carpet, paint, HVAC modifications, relocating sprinkler heads, lighting and power.
rework of existing fire alarm system. 1 level - partial floor.
Office Fitout
Remove carpet and select non-structural walls, ceilings, lighting, and ductwork.