Building permit intelligence · Boston, MA
60 Western Av has 79 municipal building permits on file in Ward 22. The latest recorded activity was a lvolt permit dated Jun 25, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 1 mapped permit within 500 m of this address.
Low Voltage
Low Voltage
Low Voltage
Other
Other
Other
1 mapped permit within 500 m, shown on the intelligence map above.
7 other addresses on Western Av with municipal permit records in Boston.
This address has 79 permit records in PropertyLabs' public history and is located in Ward 22. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 60 Western Av is dated Jun 25, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 60 Western Av in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Interior/Exterior Work
Interior/Exterior Work
Interior/Exterior Work
Interior/Exterior Work
Interior/Exterior Work
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Fast Track Application
Fast Track Application
Fast Track Application
Fast Track Application
Fast Track Application
Fast Track Application
Fast Track Application
Fast Track Application
Fast Track Application
Electrical
Electrical
Electrical
Fire Alarm
Fire Alarm
Fire Alarm
Fire Alarm
Electrical
Electrical
Electrical
Plumbing
Plumbing
Plumbing
Plumbing
Electrical
Electrical
Electrical
Electrical
Interior/Exterior Work
Interior/Exterior Work
Interior/Exterior Work
Lab/Office, Assembly Spaces, Retail/Café, Daycare and Parking Garage;Certificate for Office &; Lab Space - 2nd FloorALT1672457 Issued 12/19/2024
Lab/Office Spaces, Assembly Spaces, Retail/Cafe White Box Space, Day Care White Box Space, Below Grade Parking Garage.Certificate for Base/Building Core Shell Basement-9th floor.ER…
Install access control and CCTV for Genentech Fit out on the 9th floor
Lab/Office, Assembly Spaces, Retail/Café, Daycare and Parking Garage;Temporary Certificate for Office &; Lab Space - 2nd Floor Exp 3/23/2026 Pending Competition Of Base Building;;A…
Lab/Office Spaces, Assembly Spaces, Retail/Cafe White Box Space, Day Care White Box Space, Below Grade Parking Garage.Temporary Certificate for Core Shell Only.; Pending Completion…
Connect furniture feeds for 60 cubicles
Electrical scope associated with 9th floor tenant build out. New light fixtures, lighting controls, panelboards, transformers & receptacles to be installed.
Plumbing connections for a tenant fitout.
Install Rainwater Reclaim System Control Wiring
Fire Alarm scope associated with 9th floor buildout. New fire alarm devices to be installed throughout, tied into an existing system.
Low voltage tel/data cabling
Electrical scope associated with a tenant fit out located on the 2nd floor of 60 Western Ave. Scope includes new light fixtures, lighting controls, receptacle outlets, & panelboard…
Installing new fire alarm devices in tenant space on the 2nd floor (259090)
L2405x - fit out of the security on the 11 floors
Low voltage controls for new (2) heat recovery skids located on rooftop @ 52-60 Western Ave
Interior fitout of the 9th floor consisting of office space. Work includes: new drywall partitions, act, new lighting, new architectural finishes / millwork / MEPs
Interior fitout of the 2nd floor consisting of office & lab space. Work includes: new drywall partitions, act, new lighting, new architectural finishes / millwork / MEPs.
52-60 Western Ave. Boston - Enterprise Research Campus Lab. East-West Core & Shell Misc. Low Voltage HVAC Control Wiring. KG- 242311
Temporary Toilets for New 9-story lab building East & West Towers with a connector between towers.
Installation of Pre Action
Installation of Pre Action
Fire Alarm System for a new 10-story (core & shell) commercial research and development laboratory building with an approximate area of 440,000sf. 11 total levels inclusive of a be…
New 10-story (core & shell) commercial research and development laboratory building with an approximate area of 440,000sf. There are 11 total levels inclusive of below grade parkin…
New 9-story lab building East & West Towers with a connector between towers. Future lab space, below grade parking, and retail space
New 9-story lab building East & West Towers with a connector between towers. Future Lab Space Core Toilet Rooms Below grade parking Retail space
Temporary 58KW Generator for construction trailers/activities associated with ERC Lab Building project.
Temporary 58KW Generator for Construction Trailers/Activities
3000A Temporary Electrical Service for ERC Lab Building project.
New 9-story lab building with approximately 440,000 SF with two towers (East and West) connector between towers, assembly areas, retail/cafe white box, Day Care white box, and 123…