Building permit intelligence · Boston, MA
115 Federal St has 226 municipal building permits on file in Ward 3. The latest recorded activity was a fsttrk permit dated Jul 20, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 3 mapped permits within 500 m of this address.
Fast Track Application
Low Voltage
Low Voltage
Renovations - Interior NSC
Electrical
Electrical
3 mapped permits within 500 m, shown on the intelligence map above.
4 other addresses on Federal St with municipal permit records in Boston.
This address has 226 permit records in PropertyLabs' public history and is located in Ward 3. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 115 Federal St is dated Jul 20, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 115 Federal St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Fire Alarm
Electrical
Electrical
Fast Track Application
Fast Track Application
Fast Track Application
Electrical
Electrical
Electrical
Electrical
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Low Voltage
Low Voltage
Fast Track Application
Fast Track Application
Fast Track Application
Plumbing
Plumbing
Plumbing
Electrical
Electrical
Low Voltage
Low Voltage
Electrical
Low Voltage
Low Voltage
Electrical
Low Voltage
Electrical
Electrical
Electrical
Electrical
Plumbing
Plumbing
9th floor renovations to included demo of interior walls, new interior walls, finishes (ceilings, flooring and millwork) and new MEPS system to accommodate.
65 telecom drops on the 9th floor of 115 Federal Street for tenant The Balwin Group JH-267170
Renovation of an existing space on levels 9, 10, 11. Running new plumbing waste and water pipe to fixtures.
Partial 9th floor interior renovations. Work includes New non structural gypsum partitions, new finishes (Flooring, Ceiling, Millwork, Painting) and the rework and new installation…
Network, FCU Temp sensors, VAV, Communication to controllers, CAT-6 rm sensors wiring.
Install mpthers room sink and breakroom sink. Install water heater as part of new build out
5 security devices on the 9th floor of 115 Federal St for tenant Eisner Boston TK-266340
Electrical Fire Alarm Work Associated with Tenant fitout on the 9th Floor
Electrical Work Associated with Tenant fitout on the 9th Floor
Project 20800 - Tenant fit out installing new fire alarm to accommodate new architectural layouts
Project 20800 - Tenant fit out installing new electrical rooms, lighting and power to accommodate new architectural layouts
MP Management Office - 8th floor new offices work includes :drywall, electrical/Lowvoltage/power/fire alarm. sprinkler, HVAC, plumbing and finish work.
Install network panel, provide 120v for transformer, connect network switch, wire PSH to field controller,mount 12x12 enclosure, electric & lighting control BACnet
Electrical Work Associated with Tenant Fitout on the 23rd Floor
Electrical Fire Alarm Work Associated with Tenant Fitout on the 23rd Floor
Install low voltage cable and system components associated with an LV system upgrade at 115 Federal Street for REM Winthrop.
Interior renovations to the 10th & 11th floors. Scope includes new partitions, ceilings, finishes, connecting commuting stair, electrical, HVAC, plumbing, and fire protection. Refe…
Installation of new Eversource Meter for New Tenant on the 8th Floor
Installation of new Eversource meter on the 8th Floor
321 Residential Units, Parking, Retail, Restaurants, Pet Daycare, Office Space, Assembly Space, Community Space and Management Office;Certificate for Offices - 8th FloorALT1767987…
Rockefeller - 23rd floor buildout of offices work includes drywall partition, mechanical, electrical -low voltage/power/fire alarm, plumbing, sprinkler and finish work.
S26-181 Provide Labor and Materials to install the manufacturers electrical jumpers between the added workstations using the provided circuitry
160 telecom drops on the 9th floor of 115 Federal St for tenant Eisner Boston JC-267015
Electrical Fire Alarm work associate with 9th floor fitout
Plumbing connections for 9th floor renovation
321 Residential Units, Parking, Retail, Restaurants, Pet Daycare, Office Space, Assembly Space, Community Space and Management Office;Certificate For Offices 23rd Floor;ALT-1750555…
Electrical Work Associated with New Tenant Fit out Out the 9th Floor
240 Devonshire St #4201 Install (4) outlets at desk area
EisnerAmper -9th floor Buildout new offices of 11,000 sf of offices meeting rooms and pantry work includes: drywall partition, electrical power/low voltage/fire alarm, sprinkler, p…
Connecting power to 56 Office cubicles.
Move laundry connection.
Cosmetic upgrades to unit #5202 including closet interiors, custom cabinetry, electrical, stone accents, paint and wallpaper. No structural no change of egress. One sprinkler elimi…
Network wiring for KLR on the 8th floor
New lighting recessed linear and decorative New lighting control new outlet location for millwork and closets.
Demo of slab for future commuting stairwell 10th and 11th
Unit 4001. Renovations include custom millwork, lighting, electrical, paint & wallpaper. Adjust partition wall to expand laundry area and install tray ceiling. **Alternate Address*…
Job #20333 Colliers 8th Floor AV/Sound Masking Install
Installation of new Eversource Meter for new Tenant on the 23rd Floor
WINTHROP CENTER 8TH FL KLR - Low Voltage Temperature Control Wiring - Extend communications loop to each panel/controller from network controller,field bus communication utilizes C…
Replace fan coil units on floors 14 and 15. Sprinkler heads may need to be relocated for work and moved back at completion of work
Plumbing connections in support of an office fit out.
Pathstone - 23rd floor - additional work under ALT 1750555 adding 1200 sf or area to contract board room, break out room &; print area Work will include minor demo, drywall partiti…
Electrical Work Associated with Tenant Fitout on the 8th Floor
Electrical Work Associated with Fire Alarm work on the 8th Floor
Replace jockey pump piping and control valves, Disconnect of old valves and reconnect new valves
Replace jockey pump piping and control valves, Disconnect of old valves and reconnect new valves
Application for our Ground Floor (The Connector) and Level 3 (The Collective) spaces at 115 Federal Street requesting to change use of space to include Live Entertainment. These sp…
Low Voltage Temperature Control Wiring Job#25-6045
240 Devonshire St Unit#3914 1) Install (1) outlet
KLR - 8th floor tenant fit out new offices work includes drywall, electrical/power/low voltage/fire alarm, sprinkler, plumbing, HVAC and finishes.
Plumbing connections for a tenant fitout.
low voltage access control system cabling and installation
159 telecom drops on the 23rd floor of 115 Federal Street for tenant Pathstone CZ-257430
Electrical Fire Alarm work Associated with Tenant Fitout on the 23rd Floor
Electrical Work Associated with Tenant fitout on the 23rd Floor.
PathStone 23rd Floor Office renovation for new tenant work includes demo, drywall, electrical/firealarm,/low voltage, sprinkler, plumbing HVAC and finish work.
New lighting and outlets for Unit 5814
Additional Bathroom work–remove\replace bath floor tile, shower wall/floor tile, threshold and add heated flooring. Footprint to remain the same. This is CHANGE ORDER for Contract…
(321) Residential Units, Parking, Retail, Restaurants, Pet Daycare, Office Space, Assembly Space, Community Space and Management Office; ;Certificate for Offices on the18th floor.;…
Full unit renovation, all new lighting, demo floors for tile, except bathroom & kitchen flooring. New countertops and backsplash in kitchen and bathroom. New closet system in bedro…
S25-035 - Connect new workstation wiring to existing building infrastructure
No Work / Zero Dollar. Requesting to change use of space to include Live Entertainment for the Mezzanine Restaurant. Work has been previously performed and paid under ALT1537231. T…
;321 Residential Units, Parking, Retail, Restaurants, Pet Daycare, Office Space, Assembly Space, Community Space and Management Office;;;Certificate for Offices on 12th Floor West…
240 Devonshire Unit #5901 Install wiring for new LED light strips in bedrooms and living room, Install wiring for new dining pendants, Replace decorative fixtures
Install wiring within office cubicles on floors 12-15 for Deloitte
Install low voltage cable and system components associated with an AV system upgrade at 115 Winthrop Square 18th Floor for M&T Bank
240 Devonshire St #5014 Install (2) outlets for televisions, Replace decorative lighting fixtures
Commercial tenant (M&T Bank) improvement of existing 18th floor. Alterations include partial demolition, addition of new partitions, carpentry, millwork, ceilings, finishes, elevat…
Job #17605 Deloitte Floors 12-15 Eversource metering WO#18264923. Feeder installation is under build out of project.
S23-868 Provide Labor and Materials to install the provided electrical interconnections between the added workstations using the provided circuitry
Job #18397 Deloitte Floors 12-15 AV System install
Unit 6001 New branch circuit wiring for new speakeasy, New recessed lighting new decorative lighting new devices.
Plumbing connections for a bank headquarters fitout.
Unit 6001 - Complete renovation of the existing primary bathroom. Including electrical, plumbing, millwork, stone, tile, glass, and painting. Custom millwork throughout the unit. I…
Low Voltage Wiring permit for M&T Bank at 115 Federal St 18th Floor
12th Floor Corridor project is an interior fit out consisting of the demising and construction of the common tenant corridors between leasable areas. Work to include non-structural…
Replacement of three gas-fired water heaters located in the Level 2 Mechanical Room.
Interior non-structural demo, wall layout, and non-structural framing ahead of ALT1603810 being issued. Full cost of project reflected in ALT1603810.; floor 12
Electrical Fire Alarm Work on the 12th Floor Common Area. Installation of New Speaker Strobes and Strobes Only.
Electrical Work Associated with Tenant Fitout for Common Corridors on the 12th Floor. Installation of new Fixtures and Receptacles.
Renovation to the 18th Floor of 115 Federal for M&T Bank.
Renovation to the 18th Floor of 115 Federal for M&T Bank.
Select demolition in preparation for a tenant fitout project.
Audio Visual
Add a motion light in closet Add 2 outlets
;321 Residential Units, Parking, Retail, Restaurants, Pet Daycare, Office Space, Assembly Space, Community Space and Management OfficeCertificate for Restaurant in Mezzanine SpaceA…
321 Residential Units, Parking, Retail, Restaurants, Pet Daycare, Office Space, Assembly Space, Community Space and Management Office;Certificate for Offices on the 8th FloorALT154…
Low voltage access control and camera device installation.
To supply and install miscellaneous light fixtures and outlets in existing walls and ceilings
Install wiring within office cubicles on 8th floor for Arthur j Gallagher & Co
New millwork and light fixtures in existing condo unit #4103 (41st floor)
Reference ALT1562651. Amendment to long form being filed to include fire protection for the L3 pantry space as the original permit excluded fire protection. Due to the addition of…
Installing voice and data cables
321 Residential Units, Parking, Retail, Restaurants, Pet Daycare, Office Space, Assembly Space, Community Space and Management Office;Certificate for Offices floors 19, 20, &; 21AL…
Rework existing Pre-Engineered Fire Suppression System for the commercial hood due to new cooking equipment placed under hood per NFPA 17A, State and Local Codes.
Installation of (1) New 320A Meter for New Tenant Fit Out On 8th Floor Of 115 Federal St.
Set 10 existing 2x2 drop in fixtures into new hung ceiling
Renovations to the Mezzanine level kitchen and installation of a new bar at the mezzanine level.
Low Voltage Temperature Control Wiring Winthrop SQ Deloitte Floors 12-15
Requesting FT Program. Work includes the installation of a new 500 SF ACT ceiling in a previously permitted space on the 3rd floor of 115 Federal St. Work includes sprinkler reconf…
This permit is for the installation of the Access Control, CCTV, and Intercom systems on floors 12, 13, 14, and 15. VJ3186
Galaxy to run wiring and install access control doors/ intercoms. Galaxy to install cameras.( Cabling by others)
Lighting modifications, Millwork coordination, patching, painting and wallpaper. No structural change, no change of egress, no life safety modifications Address: 240 DEVONSHIRE STR…
321 Residential Units, Parking, Retail, Restaurants, Pet Daycare, Office Space, Assembly Space, Community Space and Management Office;Certificate for Offices 22nd FloorALT1424601 I…
321 Residential Units, Parking, Retail, Restaurants, Pet Daycare, Office Space, Assembly Space, Community Space and Management Office;;Certificate for Offices - 19th FloorALT145584…
Unit 5801 - Install new lighting and lighting control panel.
Winthrop 8th Floor Gallagher - HVAC Low Voltage Temperature Control Wiring
Install wiring within office cubicles on 22nd floor for Income Research Management
Install wiring within office cubicles on floors 19-21 for McKinsey
Job #17776 Winthrop Towers Mezzanine AV System Install
install 2 kitchen sinks, 1 water heater
Job #17208 McKinsey Installation of Eversource metering for build outs of 19th, 20th, & 21st floors
reinstall (6) smoke detectors, (3) AVs
reinstall (1) AV and commission previously installed Ansul System
Install low voltage cable and connectivity associated with a tel/data fitout of Floors 12-15 of 115 Federal Street for Deloitte.
restaurant fit out level 1m Kitchen area is a separate permit
Kitchen area for restaurant
Job #17605 Deloitte Tenant build out of floors 12-15 to include new fire alarm installation for new architectural layouts.
Job #17605 Deloitte Tenant build out of floors 12-15 to include new light & power installation for new architectural layouts.
321 Residential Units, Parking, Retail, Restaurants, Pet Daycare, Office Space, Assembly Space, Community Space and Management OfficeCertificate for Offices - 24, 25, &; 26ALT13458…
Electrical Work associated with new tenant fit out located on the 8th Floor.
Fire Alarm work associated with new tenant fit out located on the 8th Floor
Requesting the new FT program.; The; restaurant space was issued under ERT860060/2020 this application is for the tenant;fit out of a restaurant in the existing mezzanine space.. T…
Retail, Restaurants, Pet Daycare, Office Space, 317 Residential Units, Assembly and Community Spaces, Management Offices and Below Grade Parking.Temporary Certificate for Parking P…
321 Residential Units, Parking, Retail, Restaurants, Pet Daycare, Office Space, Assembly Space, Community Space and Management Office , And Food KioskTemporary for Kiosk - Valid fo…
Intall 2 toilets,6 lavs, 13 sinks, 12 water heaters , and 6 floor drains on the 12,13,14,15th Floors
Gallagher - 8th floor Interior fit out work includes drywall, flooring, HVAC, electrical/fire alarm, sprinkler, plumbing, structural steel and finish work
Interior tenant fit-out of floors 13-15 (partial 12th floor) including office workspace, conference rooms, and communing stairs. Work to include new office layout, FP and FA modifi…
New lighting new branch circuit wiring and rework of existing for new layout.
Unit PH2A - Interior Only - Removal of non structural wall between LR &; kitchen and LR &; 3rd Bed. Installation of switched glass. Installation of mirrors. Relocation of electrica…
321 Residential Units, Parking, Retail, Restaurants, Pet Daycare, Office Space, Assembly Space, Community Space and Management Office;Certificate for Offices 22nd Floor Expires 2/2…
Audio Visual Install
321 Residential Units, Parking, Retail, Restaurants, Pet Daycare, Office Space, Assembly Space, Community Space and Management OfficeTemporary Certificate for Offices - 24,25, &; 2…
Retail, Restaurants, Pet Daycare, Office Space, 317 Residential Units, Assembly and Community Spaces, Management Offices and Below Grade Parking.Certificate for Retail, Restaurants…
321 Residential Units, Parking, Retail, Restaurants, Pet Daycare, Office Space, Assembly Space, Community Space and Management Office;Temporary;Certificate for Offices - 19th Floor…
Installation of Pre-Engineered Ansul Fire Suppression System Per NFPA 17A, State and Local Codes for area b also known as main level, 1st floor.
115 Wintrhop St McKinsey floors 19-21 Floor Net work Control Panel HVAC - Low Voltage Temperature Control Wiring Provide BACnet IP Comm to all field COntrollers Mount and wire 9!8)…
This permit is for the fitout of approx 2000 SF of space at 115 Federal St. The work will include the installation of flooring, non-load bearing walls and associated finishes. Exis…
Modifications to Ground floor South Kitchen Kiosk
RELOCATE AND ADD FIRE ALARM DEVICES TO GREAT HALL FOR KIOSKS
Modifications to ground floor, south kitchen kiosk
Job #17375 Winthrop Center 13-15 Re-work existing temp wiring, make safe demo, and provide temp power.
Floor opening for communing stairwell between floors 13,14 and 15. Work to include relocating sprinkler main for the new floor openings.
KIOSKS IN LEVEL 1 GREAT HALL AREA
ECG - 19th floor Additional Scope of work to build out common corridor amending ALT1455849, work includes drywall, electrical, sprinkler/plumbing, HVAC, electrical and finishes.,
Install low voltage cable, connectivity, and system components associated with a tel/data network being deployed on Floors 19, 20, and 21 of the new Winthrop Center tower being bui…
Winthrop Sq 19th fl HVAC Low temperature control wiring. VAV/CV terminals cooling only, pipe fan coil units - monitoring for elec. meter BTU monitoring
Installation of Pre-Engineered Ansul System per NFPA 17A, State and Local Codes for area C -Mezzanine .
Job #17208 McKinsey & Co Tenant fit out of floors 19, 20, & 21 with fire alarm devices
Job #17208 McKinsey & Co Tenant fit out of floors 19, 20, & 21 with new lighting fixtures
install 5 toilets, 6 lavs, 1 shower, 4 kit sinks, 2 hand sinks, 4 drinking fountains, 1 water heater and 3 floor drains on the 19-21st flr @ 115 Federal
Replacing 6 recessed lights in kitchen from existing ones. Adding 3 fixtures in dining room
Winthrop Sq. Fitout 19th Floor
tel/data low voltage renovations floor 19
Plumbing connections for a tenant fitout
Electrical Fire Alarm Work Associated With New Tenant Fit Out On 19th Floor. This is a Partial Floor Fit out
Electrical Work Associated With New Tenant Fit Out on 19th Floor. This is a Partial Floor Fit Out
Job #17133 McKinsey & Co 20th & 21st floors Electrical make safe demo, rework temp wiring, and temp power.
McKinsey &; Company -; Floors 19, 20 &; 21 -; Interior Office fitout. Project includes installation of a communicating stairwell, new partitions, ceilings, HVAC, Lighting, FA and F…
Repair / replace same as existing kitchen,dining room,living room ceiling . Patch closet walls . Install edge trim detail to ceiling recessed sections .; Work being performed at th…
Install wiring within office cubicles on floors 24, 25, and 26 for Cambridge Associates.
ECG - 19th Floor -; Office tenant fit out.; Work includes : demo existing space. new drywall, MEP work, Fire Alarm and Sprinkler work.; All new millwork and finish work
Installation of Pre-Engineered Ansul Fire System per NFPA 17A, State and Local Codes.located at level 26
OME#23-023 IR+M - 115 Federal Street 22F. Furnish and install fire alarm impairment temporary heat loop per engineers drawings.
AV Install
313 telecom drops and 20 security devices on the 22nd floor of 115 Federal St for tenant IR+M (TK236055,JC227840)
Change the number of units to 317 residential from 321 residential scope of the work on penthouse floors.;eplan;
Winthrop IR&;M Floor 2 - HVAC Low Voltage Control Wiring
Install parking equipment at 2 parking garage entrances. Install gates, cameras, and card readers. Cut in loops in cement ramp.
OME#23-023 IR+M - 115 Federal Street 22F. Furnish and install fire alarm devices, wiring and programing per engineers drawings.
OME#23-023 IR+M - 115 Federal Street 22F. Furnish and install electrical distribution, lighting, devices and wiring per engineers drawings.
Renovations of space on the 22nd Floor for IR&;M. Work includes construction of new open office areas, conference Rooms and common areas, HVAC, Plumbing, Electrical, Fire Alarm and…
install 1 toiet, 1 lav, 5 sinks, and 1 water heater on the 22nd flr @115 Federal St
Unit 28 E+F ,misc lighting, switching and power
Project # 10206 - AV installation in rooms located on floors 24, 25 & 26
installation of new floor drains, water heater floor drains and toilets and pantries