Building permit intelligence · Boston, MA
1153 Centre St has 229 municipal building permits on file in Ward 19. The latest recorded activity was a intext permit dated Jul 24, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 2 mapped permits within 2 km of this address.
Interior/Exterior Work
Electrical
Plumbing
Fire Alarm
Electrical
Plumbing
2 mapped permits within 2 km, shown on the intelligence map above.
12 other addresses on Centre St with municipal permit records in Boston.
This address has 229 permit records in PropertyLabs' public history and is located in Ward 19. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 1153 Centre St is dated Jul 24, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 1153 Centre St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Fire Alarm
Electrical
Fire Alarm
Fire Alarm
Plumbing
Plumbing
Plumbing
Electrical
Electrical
Interior/Exterior Work
Electrical
Low Voltage
Electrical
Low Voltage
Interior/Exterior Work
Low Voltage
Electrical
Interior/Exterior Work
Interior/Exterior Work
Interior/Exterior Work
Interior/Exterior Work
Interior/Exterior Work
Plumbing
Plumbing
Low Voltage
Plumbing
Low Voltage
Low Voltage
Plumbing
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Low Voltage
Fast Track Application
Fast Track Application
Low Voltage
Low Voltage
Low Voltage
BWFH - Belkin House. MISC Low Voltage HVAC Control Wiring JG 264069
Low Voltage
Low Voltage
Provide and install 3 new access control locations, 6 panic buttons, 1 360’ camera, and a 8 reader ACM board will be added to the existing panel
210469WAW Renovation of existing 3rd and 4th Floor for new office space - Fire Alarm
210469WAW Renovation of existing 3rd and 4th Floor for new office space
210466WAW Renovation of existing medical support space.
210466WAW Renovation of existing medical support space.
Renovation of the Faulkner Hospital 5th floor. This includes toilet/sink replacements and new piping to connect fixtures.
Complete renovation of the 2nd floor at the BWFH Belkin House. This includes new pipe, toilets, sinks, and associated equipment.
210469WAW Demo of existing Second floor only Provide , power and lighting
210469WAW Demo of existing Second floor only Provide Temp FA, -Intall temp protecta wire fire alarm system for construction
Interior fitout of the 2nd floor to include new architectural finishes, as well as new mechanical, plumbing, fire protection, electrical, and fire alarm systems.
Hospital, Offices and Wireless Communication;Certificate for Radiology and Pre/Post Procedure Recovery Bays on the 1st floor.ALT1555173 Issued 4/23/24
Complete renovation of the 3rd & 4th floors at the BWFH Belkin House. This includes new pipe, toilets, sinks, and all associated equipment.
The scope of work includes the renovation of existing spaces including architectural changes, finish upgrades, and MEP modifications.
Interior fitout of the 3rd and 4th floors to include new architectural finishes, as well as new mechanical, plumbing, fire protection, electrical, and fire alarm systems.
Selective demolition, including electrical, mechanical, and plumbing, fire alarm, and fire protection.
Added five nurse call dome lights and four code blue stations to new Hospital Speech Therapy area
Electrical work associated with new Hospital Speech Therapy area @ 1153 Center Street, Boston MA 02130
Installation of casework, sinks, millwork, and room finishes improvements in three interior rooms of Brigham Women's Faulkner Hospital. This is all non-structural renovations.
210448WAW Demo of existing 2 floor Provide power and lighting
Install temp protecta wire fire alarm system for construction
Install 4 Hand sinks in the 2nd Floor Speech Therapy Rooms
Selective demolition, including electrical, mechanical, and plumbing on floors 3 and 4.F/A and F/P;
210402WAW Replace existing Air Handling Unit, add 2 panels
210402WAW Replace existing Air Handling Unit, add 2 panels
Inpatient fit out of existing space for new design documentary FBBJ
Electrical work associated with new Hospital Angio Procedure room and IT support area
Electrical Fire Alarm work associated with new Hospital Procedure room and IT support area
Scope entails installation of new rooftop air handling unit atop steel dunnage with upgrade MEPs as required.
Installation of underground raceway and branch circuits for new surface parking lot lighting and gate controls
New 6 Level Building that will be attached to the existing BWFH Main Building. Basement includes storage and mechanical space. Level 1 and 2 to be procedure rooms. Floors 3-5 to be…
Installation of Angio Equipment Room and IR Prep Bays
Install 45 DAS antennas and build out 1 Head End room
Connect furniture feeds for 31 stations
Complete Demolition of Parking GarageDig Safe#20251617819
Hospital, Offices and Wireless CommunicationCertificate for New Addition, Inpatient floors 3-5, Radiology on the 1nd floor,; Endoscopy 2nd floor and; Café &; Seating Area 3rd floor…
Renovation of the existing PACU Nurse Station and clinical support spaces.eplan
Scope of work includes removal and replacement of existing AHU-17; new unit to be installed atop steel dunnage on BWFH rooftop. Supplemental scope includes electrical, mechanical p…
Renovation of the men's and women's restroom. New toilet partitions, accessories, lights, floors, ceiling, plumbing work, and fire protection. [ePlans]
New 6 Level Building that will be attached to the existing BWFH Main Building. Basement includes storage and mechanical space. Level 1 and 2 to be procedure rooms. Floors 3-5 to be…
AT&T Cell Site Modification
The scope of the project is to perform sprinkler head maintenance as identified in the scoping letter. Existing hydraulic demands will not be altered.
Hospital, Offices and Wireless Communication;;Temporary for Employee Café -to Expires on 7/6/2025ALT1425972 Issued 4/26/2023 &; A1568625 Issued 7/25/2024
210371WAW Renovate 2 Existing Bathrooms 2 Door Openers with Push to open buttons
New fire pump room as an extension of existing Lvl 2 fire pump room in preparation of tying in future in-patient addition project. Select demo in existing fire pump room. Make wate…
New fire pump room as an extension of existing Lvl 2 fire pump in preparation of tying in future in-patient addition project. Use existing SLC loop from Lvl 1 DGP for new flow, tam…
Installation of water and sanitary piping for new bathroom fixtures (885728-1)
Two levels below grade & Three levels above. (7) Access Control Doors & (8) Parking gate locations
Install 13 dual Cat 6A devices
Cut in 16 loops in concrete for parking equipment. Install parking equipment (ticket dispensers, Pay on foot machines, card readers, direction signs and full signs), bolt down and…
Inpatient Tower Scope: New 6-Story Building - (77) Access Control doors & (70) Panic Buttons
210363WAW - Renovate existing PACU space
210363WAW - Renovate existing PACU space
210252WAW Faulkner AHU 17 R/R existing Air Handler with new
210252WAW Faulkner AHU 17 R/R existing Air Handler with new
Add 1 GFCI Receptacle at new exam room
installation of sink and faucet on level 3 OBGYN room 3C.
BWFH AHU-17. Misc. Low Voltage HVAC Control Wiring. AG-242568
Plumbing
The employee cafe addition will be built as an addendum to core shell structure built as part of ALT1425972. The Cafe fit out will provide 1,967 sf of seating and table space to th…
phase1 - Cafe Addition - FA work - new Booster panel for additional initiating devices and notifying devices tying into existing hospital FA system @ 1153 Centre St, Boston, MA 021…
Phase1 - Third Floor Cafe addition - includes new fixtures and outlets. @ 1153 Centre St, Boston, MA 02130
Selective demolition and renovation of existing physical therapy suite for new layout. Renovation includes new lighting and outlets.
Selective demolition and renovation of existing physical therapy suite. FA work - new booster panel for additional notifying devices tying into existing hospital FA system
BWFH Garage. Misc. Low Voltage HVAC Control Wiring. AG-242567
add a backflow preventer to the new BWFH AHU 17 for HVAC makeup water connection
renovate BWFH 5th floor sleep lab bathrooms replacing 4 water closets, 4 shower valves and adding 4 new floor drains and 2 kitchen sinks.
Project scope entails installation of new modulating combination fire/smoke dampers and (4) duct smoke detectors. A POA (purge-off-auto) switch system has been added as part of thi…
Interior Radiology Department Renovations at Faulkner Hospital. Work includes the demolition of existing radiology treatment spaces and reconstructing new imaging and patient pre/p…
Replace (2) MCC's with new distribution panels. refeed existing pumps and wire new VFD's 2-600A distribution panels 11 VFD's
Project is a new parking structure with a new fire alarm system. System is made up of 99 detection and initiating devices, 70 alerting devices, new Fire Alarm control panel, and it…
Construction of parking structure with two levels below below grade and three levels above grade New 13KV feed's from existing Eversource Station #536
installation of reduced pressure back flow preventer and 2 roof drains
210203MGB Replace 10 receptacles, 13 lights and wiring due to flood.
New ATS and panelboards for new AHU unit
Fire alarm work - (2) duct smokes for new AHU and relocated ductwork
SM#210248WAW - BWFH AHU 02 replacement - R/R existing Air Handler with new
Replacement of R/R existing Air Handler with new - Install new FA Initiating devices
BWFH Nuclear Medicine Misc. Low Voltage HVAC Control Wiring PG - 231847
SM#210294WAW - Renovate existing nuclear med imaging suite for new equipment
Installation of three (3) new dual and one (1) single yellow plenum-rated Category 6A locations
Scope of work includes removal and replacement of radiology equipment, new HVAC components, upgraded lighting, flooring, and finishes throughout the room.
BWFH Inpatient Tower, 6 Fl. Misc. Low Voltage HVAC Control Wiring. AG-231561
The BWFH inpatient addition includes the construction of a new 6 level building the will be attached to the existing BWFH main building. Basement includes storage and mechanical sp…
Install temporary 40x40 tent to be used for ground breaking ceremony. Installed 4/26. Removed 4/27. Event date 4/27/23.
Demo existing AHU; cut, cap, and drop MEPs.
Install temporary 20x20 tent used for ground breaking ceremony. Tent will be in addition to 20x40 tent permitted on SF1441897. Installed 4/26/23. Removed 4/28/23. Event date 4/27/2…
Replace 85 gallon commercial electric water heater.
;AUTHORIZED FOR FOUNDATION ONLY PERMIT under 780 CMR Phased approval, with supportive independent peer structural engineers foundation report provided.*NOTE: Construction cost fee'…
Install temporary 20x40 tent to be used for Groundbreaking Ceremony. Installed 4/26. Removed 4/28. Event date 4/27/23.
Install temporary 10kva generator used to power lights and a/v equipment in temporary tent. Installed 4/26/23. Removed 4/28/23. Event date 4/27/23.
Wire and install telecom on floors 1-5
Hospital, Offices and Wireless CommunicationCertificate for Pharmacy 2nd floorALT1255797 Issued 11/10/21
600A 120/208V Power Service for Temp Trailers Eversource WO #11115888
New 6-Story Inpatient Building Addition New 13KV feed's from existing Eversource Station #536
Installation of Visual Mock Up per BPDA requirements. Mock up to consist of building elements including curtainwall, precast, and metal panel for the Faulkner Inpatient Addition, P…
Provide misc circuits from existing panel for new Boston Ems radio equipment.
SM#210237DSN- BWFH Faulkner Sign Replacement at 5 locations
Demolition and Installation of plumbing piping, Medical gas piping, fixtures and drains in preparation and including the hospital tower.addition
Installation of plumbing piping and fixtures in the new garage addition of the Brigham and Women's Faulkner Hospital.
BWFH RCM - Misc. Low Voltage HVAC Control Wiring. AG - 220865
Install (2) temporary 170,000BTU heaters each connected to (1) 100lb propane tank. Installed 10/25. Removed 10/28. Event date 10/26.
Air handling unit relocation/replacement. Mechanical and electrical enabling for Faulkner Hospital Inpatient Tower. Preliminary demolition of existing structures. Minor interior re…
Installation of a temporary construction office trailer. Trailer consists of 2 levels totaling 1,920 square feet. Use of trailer will be office space and conference space to suppor…
BWFH - RTU-13. Misc. Low Voltage HVAC Control Wiring. AP - 220581
Repair floor slab potholes in parking garage
Elec app. Per BPDA approval 7-6-22 replace signs: wall signs B1, B2, B2a, B4. Ground signs: W1, W2, W4, W5, W6, W7. To read: logo/Mass General Brigham//Brigham and Women's Faulkner…
Hospital, Offices And Wireless CommunicationCertificate For 5th Floor Breast Imaging Center;ALT1270481 Issued 1/28/2022
Install temporary 40x80, 16x16, and 10x10 tents to be used for corporate event. Installed as early as 10/5. Removed 10/8. Event date 10/7/22.
BWFH Faulkner Hospital Task #4. 1153 Centre Street. Misc. Low Voltage HVAC Control Wiring. PG - 220858
SM#210219WAW - BWFH RTU 13 Replacement
SM#210219WAW - BWFH RTU 13 Replacement
Remove and replace roof over Operation Recovery
BWFH Faulkner Hospital Task #1. 1153 Centre Street, Misc. Low Voltage HVAC Control Wiring. PG-220612
SM#210201TGG - BWFH Water Heater Replacement. Replace existing water heaters with new. Add electrical panel
Furnish and install fire alarm devices to existing fire alarm system
SM#210198WAW - BWFH Breast Imaging Suite Furnish and install Nurse Call Low voltage wiring system
BWFH AHU 1/1A. Misc. Low Voltage HVAC Control Wiring. PG - 220528
BWFH Water Heater Replacement. Misc. Low Voltage HVAC Control Wiring -PG-220477
Installation of 3 PVI Cobrex Instantaneous tankless hot water heaters and 1 backflow preventer.
BWFH BIC (Breast Imaging Center) 1153 Centre Street Misc. Low Voltage HVAC Control Wiring - PG - 220370
87 Dual Data Locations, IDF Buildout and Security Rough Cabling (D220088 Faulkner Breast Imaging)
Labor to install 20 data location
a 6,200sf full gut renovation of 3 existing medical office suites on the 5th floor of BWFH. New Space will be a;Breast Imaging Center;with 4 Mammography screening rooms, 3 ultra so…
Installation of 2 new floor drains with trap primers and 1 backflow preventer including associated drain, vent, and water piping to support new air handling unit installation.
420400 - Renovation of existing clinical space with new fixtures.
SM#210199WAW - BWFH OR AHU- fire alarm @ 1153 Centre Street
SM#210198WAW - BWFH Breast Imaging Suite Furnish and install fire alarm
SM#210198WAW - BWFH Breast Imaging Suite Furnish and install lighting, power
SM#210199WAW - BWFH OR AHU - Furnish power to HVAC equipment, panels - (1)400A 208/120V 3p 4wire & (1) 100A 208/120V, 3P, 4W Panels & (1) 30 KVA XMR
Renovation of first floor ERCP Unit
Demolition of MEP. Cut Cap and Dropping duct work.
General wiring for Pharmacy area at Faulkner Hospital
Installation of an OSHA compliant non-penetrating rooftop guardrail system
Renovation of Compounding Pharmacy Space of Faulkner Hospital
Brigham &; Women's Faulkner Hospital - 2nd Floor -; Interior Renovations and MEP Upgrades to an existing 2nd floor Pharmacy. Work includes demolition to existing partitions and MEP…
26 voice data location on floor 5C
BWFH Pharmacy Floor 2. 1153 Centre Street. Misc. Low Voltage HVAC Control Wiring - PG - 219630
5th Floor Suite 5E Wiring for power and lighting at renovated rooms - replacement fire alarm devices.
5th Floor XRay Room #1 - New wiring for new xray equipment
Renovation of existing medical office.
Install temporary 40x80,16x16, and 10x10 tents to be used for corporate event. Installed by 9/30/21. Removed 10/2/21. Event date 10/1/21.
Demolition, MEP Upgrades, and Interior renovations/finishes to Suite 5E on the 5th floor on Brigham and Women's Faulkner Hospital
Hospital, Offices and Wireless CommunicationCertificate for: Offices -4th floor - only;Alt1166296 - 3/26/21
Roof. T-Mobile to replace nine (9) antennas, three (3) TMA’s, replace twelve (12) remote radio heads with six (6) new remote radio heads, add three (3) diplexers and three (3) Hybr…
SMC Job# 210168SCC BWFH 4th Floor Presidents Suite. Renovation of lighting, power
SMC Job# 210168SCC BWFH 4th Floor Presidents Suite. Renovation of fire alarm.
BWFH 4th Floor Admin, 1153 Centre Street, Boston. Misc. Low Voltage HVAC Control Wiring - PG - 219518
Renovations of existing President and Admin Office space. Scope of work includes new finishes and HVAC, FA and Electrical upgrades. No sprinkler scope.
885323 - BWFH - 4th FL Administration - Install new water closet and water line to coffee maker.
perform concrete slab repairs on top parking garage level
AT&T proposes upgrades to its existing rooftop telecommunications facility including the removal and replacement of three (3) antennas and ancillary equipment as more fully detaile…
upgrading T-Mobile's power from the existing building power from 100A to 200A and installing a 200A panel on the roof the replace existing 100A one. We will be using existing condu…
HospitalCertificate for the EMERGENCY DEPARTMENT at FAULKNER HOSPITALALT897086 issued: 12/20/18
885311 - BWFH - Suite 51 - Demoing 1 bathroom, replacing the fixtures in one bathroom, and adding hand sink.
BWFH Suite 51, 1153 Centre Street, Boston. Misc. Low Voltage HVAC Control Wiring - PG - 219330
Install new notification devices and wiring per plans. Suite 5I 5th Floor
Install new power and lighting per plans. Suite 5I 5th Floor
Make safe electrical, plumbing and fire protection. Demo and upgrade all architectural finishes.
Hospital, Offices and Wireless Communication Certificate for: Surgery Check-In -;1st floor ALT1042430 issued 6/11/20
Wire Neruo Scanner unit room and scanner
885165 - BWFH IN - Relocating existing water piping and adding OED drain for HVAC contractor per engineered drawings.
BW Faulkner Hospital, 1153 Centre Street, Bosoton, MA. Misc Low Voltage HVAC Control Wiring - P.G - 209047
BWFH Interventional Nephrology, 1153 Centre Street, Boston, MA. Misc. Low Voltage HVAC Control Wiring. - P.G - 209013
Offices, Lab and Exam Room, Hospital Certificate for the 5th floor Exam Room ALT1029923 issued 1/21/2020
Renovation of radiology suite. Replace ceiling, floors, casework, lights and MEP updates. Relocate 9 heads.
BWFH Pharmacy-1153 Centre Street, Misc low voltage hvac control wiring - PG, 208929
Install data drops in new Surgery Check-in 12 drops
Faulkner Hospital 3rd Floor RPMS 1153 Centre Street; low voltage HVAC control wiring, 208628 PG
Brigham &; Women's Faulkner Hospital - Surgery Check-In - 1st Floor -; Demo existing space, new drywall,elec.,hvac,paint,act and flooring and modify existing Fire Alarm system;;;;;…
add e strobs and 1 speaker strobe to existing system
new doctors suite fit up
Furnish labor and materials to install lavatory in existing 5th floor extremities room.
Hospital, Offices and Wireless Communication Temporary Certificate for the Phase I- ;Emergency Department;-1st fl. -Only Certificate expires on;4/30/2020- pending completion. ALT89…
Renovation of surgical waiting area. New AV's and smokes
Renovation of existing surgical check in and waiting area. General lighting, receptacles and fire alarm. All circuits and panels are existing to be re-used. Low voltage to be by ot…
Renovation of surgical waiting area. Fire alarm low voltage wiring
remove exsisting casework and flooring install new drywall,elec.,hvac,paint and flooring
Faulkner Hospital Extremities CT low voltage HVAC control wiring 208230 - PG