Building permit intelligence · Boston, MA
815 Centre St has 28 municipal building permits on file in Ward 19. The latest recorded activity was a electrical permit dated Jun 26, 2026. Permits at this address represent $100K–$500K in total declared construction value. PropertyLabs also identified 5 mapped permits within 2 km of this address.
Electrical
Electrical
Renovations - Exterior
Electrical
Renovations - Interior NSC
Plumbing
5 mapped permits within 2 km, shown on the intelligence map above.
12 other addresses on Centre St with municipal permit records in Boston.
This address has 28 permit records in PropertyLabs' public history and is located in Ward 19. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 815 Centre St is dated Jun 26, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 815 Centre St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Renovations - Interior NSC
Electrical
Plumbing
Gas
Plumbing
Electrical
replace bathroom fixtures
To strip tiles from floor and walls. Put in recess lights in celing over shower. Install bathtoom and valve. Tile shower, walls, and floor
wire bathroom
Replace stove in unit 5, move location and install stove unit 3
replace kitchen sinks and dishwashers unit 3 and 5
Unit #5: New kitchen remodel. Also rewiring a small pantry area a ajacent hallway. Adding a 100AMP rated subpanel on the floor. Misc new fixtures
Unit #3: New kitchen remodel. Also rewiring a small pantry area a ajacent hallway. Adding a 100AMP rated subpanel on the floor.
Unit 3, full kitchen remodel, new floor, blue board plaster, cabinetry, update pantry, update electrical, new window in existing opening
Partial Kitchen Remodel, replace flooring, update electrical, install new cabinetry ( work performed @ unit # 5 )
• Demo all existing porch structure excluding roof structure and support roof where needed , dispose of all waste created during project • Remove existing footings • Set and pour 3…
renovate
40 amp sub panel, 2 laundrys, electric dryers, 220 volt 30 amp dryers
renovate closet in third floor unit and add laundry.
install laundry connections in third floor unit
elec in 2 bathrooms on 3rd floor
remodel of existing bath, instalation of full bath , instalation of whasher and dryer work with closet space(change locationn of the door painting
Short Form Bldg Permit · INSUL · Jul 20, 2026