Building permit intelligence · Minneapolis, MN
121 8TH St S has 99 municipal building permits on file in Downtown West. The latest recorded activity was a plumbing permit dated Jul 23, 2026. Permits at this address represent $5MM–$25MM in total declared construction value. PropertyLabs also identified 4 mapped permits within 500 m of this address.
Suite 1400 -Install sink on existing rough in
Adjust existing duct system to accommodate new floor layout. Replace all troffer style GRD's to meet building standard for GRD's suite 950
Replace two existing fan coil unit like-for- like
SUITE 950. INTERIOR TENANT IMPROVEMENT. (JJL) certificate of occupancy required: no special inspections required: no const type: I-B occupancy: B 2020 MSBC occupant load: 66 sprink…
#1400 interior demo - patch finishes and lighting.
4 mapped permits within 500 m, shown on the intelligence map above.
1 other address on 8TH St S with municipal permit records in Minneapolis.
This address has 99 permit records in PropertyLabs' public history and is located in Downtown West. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 29, 2026.
PropertyLabs compiled this permit history from municipal public records for Minneapolis, MN. The latest recorded permit activity at 121 8TH St S is dated Jul 23, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 121 8TH St S in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Food/Rough-in and install, sink,coffee, dishwasher, water for fridge, electric water heater
ComMFDNR
Remodel
FoodBev
GAS EQUIPMENT connections. All gas piping and appliances shall be installed in accordance with the 2020 Minnesota State Fuel Gas Code Code (MSFGC). Approved plans and plan review c…
#1450 replace dishwasher
New low pressure ducts added to existing VAV's and FPVAV's BLDG1102789
T/I - SUITE 1450 const type: IB occupancy: B 2020 MSBC occupant load: 121 sac: _3.41_ charges _3.77_ credits = _-0.36_ net met council letter dated _12/19/24_ architect: 24515 - Sh…
10TH FLOOR TENANT IMRPOVEMENT. LAKE STREET CAPITAL MARKETS. (JJL) certificate of occupancy required: no special inspections required: no const type: IA occupancy: B 2020 MSBC occup…
FOR #215/SPICE SHACK - INSTALL CLIENT SUPPLIED COOKING FIXTURES ONTO EXISTING GAS STUB OUTS.
TENANT REMODEL. INFILL FLOOR AFTER REMOVING COMUNICATING STAIRS AND LIFT. 14TH AND 15TH FLOORS. FIRE PROTECTION REQUIRED. (JJL) certificate of occupancy required: no ***** special…
Demo & Cap Plumbing
PROVIDE, ROUGH-IN AND INSTALL RESTROOM FIXTURES FOR 6TH FLOOR COMMON AREA
(DMH - ProjectDox) DEMO AND REMODEL TO 6TH FLOOR BUILDING CORE MENS & WOMENS RESTROOMS. REPLACE ALL FIXTURES WITH NEW IN SAME LOCATIONS. DEMO AND RECONSTRUCT ELEVATOR LOBBY SMOKE P…
Allina Clinic Security Upgrades - TCF Tower Women's Health - Suite 600 Required egress doors shall be readily openable from the egress side without the use of a key or special know…
HVAC system alteration adding one VAV box and rework existing ductwork per attached plan.
ROUGH-IN AND INSTALL (1) SINK, (1) ELECTRIC WATER HEATER, AND (1) WATER SUPPLY FOR COFFEE MAKER - SUITE 890
INTERIOR REMODEL SUITE 890 certificate of occupancy required: no const type: 1-A occupancy: B 2020 MSBC occupant load: 24 in suite 890 sprinklered: yes Tenant: CSC Gold Floor(s): 8…
Modifications to ductwork venting and hydronic baseboard radiation.
INSTALL NEW ROOF DRAINS
Tenant buildout of 7th floor. One break room area, two unisex restrooms, one wellness room.
HVAC for tenant finish out, adding and reusing VAV boxes, supply diffusers, return grilles and all associated duct work. Refer to attached drawings.
7th floor demo. sck
remodel office suite 1320 - 13th floor approx. 4700 sq ft. const type: 1a ***occupancy: b ***2020 MSBC***** sprinklered: yes
ROUGH IN AND INSTALL BREAKROOM SINK DISHWASHER AND ELECTRIC HEATER
ROUGH IN AND INSTALL BREAKROOM SINK DISHWASHER AND ELECTRIC HEATER
(DMH - ProjectDox) OFFICE REMODEL TO SUITE 1425, APPROX 1,795 SQ.FT. RECEPTION AREA, KITCHEN/ COPY RM, HUDDLE RM, SMALL CONFR. RM AND SMALL OFFICES. NO CHANGE IN EXITS OR CORRIDOR.…
14th floor suite remodel, new break room fixtures
Replacing one VAV box and adding one new VAV box.
Add two new VAVs and relocate one VAV. Duct and GRDs as necesary
Install plumbing for new washer/dryer
Tear off all materials to deck . Install new isocyanurate roof insulation New fully adhered 60 mil EPDM roof system complete with all required flashing and trim.
ADD 2 VAV'S & CONNECT TO EXISTING DUCTS
INTERIOR REMODEL AT SUITE # 995 certificate of occupancy required: NO ***** const type: B ***occupancy: IA ***2015 MSBC***** occupant load: 32 sprinklered: YES Tenant: SYNERFUSE **…
SUITE 995 BREAKROOM - ROUGH-IN AND INSTALL SINK, DISHWASHER, WATER HEATER & STANDPIPE
INTERIOR REMODEL OF EXISTING OFFICE SPACE OF A COMMERCIAL BUILDING. AAJ#1 certificate of occupancy required yes no mechanical plans required for certificate of occupancy mechanical…
Relocate VAV ______ INSPECTION REQUIRED. CONTACT INSPECTOR TO SCHEDULE INSPECTION.
REWORK EXISTING HVAC FOR 13TH FLOOR CORRIDOR
REWORK DUCTS / 2 NEW VAV'S / GRD'S FOR SUITE #1300
(DMH#1) BUILD-OUT TO 4,400 SQ.FT TENANT OFFICE SPACE. INSTALL PARTITION WALLS FOR SMALL OFFICES, CONFERENCE ROOM AND EMPLOYEE KITCHEN. NO CHANGE IN CORRIDOR. Const type: I-A Occupa…
CREATE CORRIDOR FOR FUTURE TENANTS AND RESTROOM REMODEL AT 13TH FLOOR (MAA) const type: IA ***occupancy: B ***2015 MSBC***** Tenant: RYAN COMPANIES ***Floor(s): 13TH architect: MAR…
REMOVE AND RE-INSTALL DIFFUSERS FOR NEW CEILING IN ELEVATOR LOBBY
REPLACE BATH FIXTURES AND BREAK ROOM SINK
CORRIDOR REMODEL AND BATHROOM REMODEL ON 11TH FLOOR. NON COMBUSTIBLE CONSTRUCTION. (JJL)******** rtificate of occupancy required: no************** mechanical plans required for cer…
Non-structural remodel Office Space- Suite 1100. Type I-A fully sprinkled. No chg to occupant load or exiting. No change to core. Permit fully accessible
9TH FLOOR RESTROOM/CORRIDOR REMODEL. ***new electric water cooler plumbing rough-in must not penetrate exit stair enclosure*** Re-construct north elevator lobby to original smoke p…
Non-structural interior remodel of existing space - 10th FL. No impact on floor or wall rated assemblies.
FIXTURES FOR 9TH FLOOR RESTROOM
REWORK EXISTING HVAC / ADD 1 NEW VAV & 1 FAN
SUITE # 490 ROUGH IN FINISH BREAKROOM SINK LAUNDRY WASHER BOX RELOCATE WATER HEATER IN CEILING
(DMH#1) REMODEL TO SUITE 940, 5,072 S.F. SELECT DEMO AND INSTALL NEW PARTITIONS WALLS FOR NEW CONFERENCE ROOM AND CLOSET. REMODEL OPEN EMPLOYEE BREAKROOM. REPLACE SELECT DOORS. INS…
2ND FLOOR NEW FAN COIL UNITS, DUCTS , DIFFUSERS,& CHILLED WATER PER PLANS
REWORK DIFFUSERS FOR SUITE #1140
OFFICE BUILD-OUT TO SMALL 16' X 27' OFFICE SPACE. NO CHANGE IN USE, EXIT OR CORRIDOR. (DMH#2) APPROVED PLANS AND PERMIT MUST BE ON SITE BEFORE INSPECTIONS WILL BE PROVIDED. SEPARAT…
Tenant office remodel approx. 50 s.f. no change in layout or occupancy
Parking garage repair ENGINEER: Palanisami - Michael Deiss #26604
TENANT BUILDOUT OF EXISTING SHELL SPACE certificate of occupancy required: YES mechanical plans required for certificate of occupancy mechanical plans/letter of means of compliance…
FOR 10TH FLOOR "SPEC SUITES" - 2 ELECTRIC WATER HEATERS, 2 KITCHEN SINKS, AND 2 FLOOR DRAINS TOTAL
RENOVATION OF PARTIAL FLOOR ON 8TH FLOOR TENANT SUITE 893 (MAA#02) const type: 1-A occupancy: B 2015 MSBC occupant load: 8 sprinklered: YES Tenant: LUNDGREN & JOHNSON Floor(s): arc…
INTERIOR REMODEL OF PARTIAL 8TH FLOOR AT SUITE 895 (MAA #02) certificate of occupancy required: YES const type: B occupancy: IA 2015 MSBC occupant load: 20 sprinklered: YES Tenant:…
INTERIOR REMODEL OF 10TH FLOOR. 2 SEPARATE SPACES. ONLY DEMO IS AT CORRIDOR WALL. ADDING DOORS TO SPACES. (JJL) certificate of occupancy required: no special inspections required:…
OFFICE BUILDOUT & REMOD FLOORS 14, 15, 16 certificate of occupancy required: no special inspections required: Yes const type: 1A occupancy: B 2015 MSBC sprinklered: yes Tenant: Sch…
1ST FLOOR/GREY FOX - DUCTWORK AND DIFFUSERS
14th floor common corridor restrooms. Fixture change outs for 6 lavs, 3 urinals, 5 toilets, and 1 hi-low drinking fountain.
REWORK DUCTS & DIFFUSERS FOR 14TH, 15TH, 16TH FLOORS
floor 14 and 15 14th sink 15th breakroom sink
replace dishwasher suite # 1111
INSTALL NEW DIFFUSERS FOR THE 14TH FLOOR
Adding smoke doors, and making bathrooms accessible on the 14th Floor. certificate of occupancy required no mechanical plans required for certificate of occupancy mechanical plans/…
SUITE 610 - REWORK DIFFUSERS
duct work and VAV's for new floor plan. -SUITE 1250
4 VAV's and ductwork
7000 btu suite # 215. Condensing unit will be placed in parking garage above tenant space.
REMODEL OF EXISTING OFFICE SPACE - SPECIAL INSPECTIONS ARE REQUIRED FOR ALL FLOOR AND RATED WALL PENETRATIONS IF ANY (WSS) certificate of occupancy required no special inspections…
rough in and install 3 sinks 3 water heaters suite #1250
12th floor restrooms
FOR 12TH FLOOR RESTROOMS - 4 LAVATORIES, 5 TOILETS, 2 URINALS
INTERIOR REMODEL OF 12TH FLOOR COMMON CORRIDOR, RESTROOMS AND ELEVATOR LOBBY AREA OF EXISTING COMMERCIAL BUILDING. AAJ#1. Construction type: 1 - A occupancy: B 2015 MSBC certificat…
SUITE 215 TENANT BUILD OUT - NAF NAF GRILL RESTAURANT SIGNAGE REQUIRED IDENTIFYING THE LOCATION OF NEAREST PUBLIC RESTROOM certificate of occupancy required yes mechanical plans/le…
REMODEL OF 12TH FLOOR, 8,725 SQ.FT OFFICE SPACE. MULTI-TENANT FLOOR. (DMH#1) INSTALL PARTITION WALLS FOR SMALL OFFICES, OPEN OFFICE, CONFERENCE ROOMS AND BREAKROOM. NO CHANGE IN CO…
REWORK EXISTING VAV'S - NEW 1 TON DX UNIT FOR SERVER ROOM. DUCTWORK AND DIFFUSERS
electric water heater, floor drain, breakroom sink
Duct & diffusers from 5 fan coils - kitchen hood connections.
future gas line for restaurant
floor 17-restrooms
17th floor remodel restrooms and drinking fountain. certificate of occupancy required no special inspections required no const type: 1A occupancy: B 2015 MSBC occupant load: NA spr…
17TH FLOOR TENANT BUILDOUT APPROX 21,325 SF FOR OFFICES NOT INCLUDING CORE AREAS. certificate of occupancy required : no special inspections required: no const type: 1-A occupancy:…
ADD A MAKE-UP AIR @ 274696, 2 EXHAUST FANS (1 @ 2,925 CFM & 1 @ 750MBH), 5 FAN COIL UNITS PER ENGINEERED PLANS
relocate existing diffusers - 10 floor (Unimax) A/C System to follow on future permit
food ok 10 floor- break room
INTERIOR REMODEL 10TH FLOOR INTERIOR OFFICE REM APPROX 11,236 SF AT PARTIAL 10TH FLOOR OFFICES NOT INVOLVING CORE. certificate of occupancy required no special inspections required…