Building permit intelligence · Minneapolis, MN
200 6TH St S has 83 municipal building permits on file in Downtown West. The latest recorded activity was a commercial permit dated Jul 27, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 4 mapped permits within 500 m of this address.
Tenant improvement in existing office spaces on 2 level -ACW certificate of occupancy required: no special inspections required: no const type: IA occupancy: B 2020 MSBC occupant l…
us bank plaza in wall piping only restrooms
Full white box demo of levels 14N and 35N -ACW certificate of occupancy required: no special inspections required: no const type: I-A occupancy: B 2020 MSBC sprinklered: yes Floor(…
T/I - "LEVEL 19S REGULATORS" (19TH FLOOR) const type: IA occupancy: B 2020 MSBC occupant load: 199 sprinklered: YES architect: 52351 - Brown, Michael Tipton @ RSP
Install 3 transfer fans, relocated several diffusers and install 1 duct heater. BLDG1168869 South tower U.S. Bank levle19.
4 mapped permits within 500 m, shown on the intelligence map above.
6 other addresses on 6TH St S with municipal permit records in Minneapolis.
This address has 83 permit records in PropertyLabs' public history and is located in Downtown West. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 29, 2026.
PropertyLabs compiled this permit history from municipal public records for Minneapolis, MN. The latest recorded permit activity at 200 6TH St S is dated Jul 27, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 200 6TH St S in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Replace waste, vent water piping restrooms /13th floor
Adding 2" remote fill line for generator. Rest of work under BLDG1130788. BLDG1145509 Contractors permit application stated $200,000.00 but emailed a notice to us of the typo. $20,…
Install HVAC per plans N. Floors 13,36,37,38. Add 4 new fan coil units, 1each to floors N13, N36, N37, and N38. Rework 20 dual air boxes and associated ducts per floors 13N,36N,37N…
Install waste, vent, water and fixtures. 24 toilets, 8 urinals, 26 lavs, 4 break room sinks, 2 wellness room sinks, 4 drinking fountains & 4 EWHs. All plumbing shall be installed i…
T/I - 13N, 36N, 37N, 38N const type: IA occupancy:B 2020 MSBC sprinklered: YES architect: 52351 - Brown, Michael Tipton @ RSP
RE-ANCHOR TRAVERTINE CLADDING. (JJL) ENGINEER: WJE - MARK CHAUVIN #42769
interior demo on floors 13, 36, 37, and 38.
Generator piping per approved plan.
CONCRETE PAD FOR NEW GENERATOR, DOOR. (JJL) ENGINEER: MBJ - JW MURPHY CURRAN #47174 SPECIAL INSPECTIONS: AET
HVAC system per approved plans.
Scope includes new plumbing for restrooms and breakrooms on multiple floors. All plumbing shall be installed in accordance with the 2020 Minnesota State Plumbing Code (MSPC), Chapt…
reworking existing ductwork and replacing existing diffusers with new
Tenant Improvement 39th and 40th floors certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2020 MSBC sprinklered: yes Tenant: US Ban…
Replace (2) air handling unit fans with new fan arraysReplace (4) vaneaxial fans with new fan arrays
FOR 40TH FLOOR - REPLACE HORIZONTAL RAINWATER PIPING
Installing 1 new supply diffuser and transfer grille at new demising.
interior demo of floors 39 and 40.
Installing new fan-coil, duct humidifier, GRDs and all associated ductwork per approved plans.
Tenant Interior Remodel - US Bank - 11th Floor certificate of occupancy required: no special inspections required: no SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HE…
Ductwork modification and installation of transfer fan per approved plans.
T/I - RECONFIGURE SPACE const type: IA occupancy: B 2020 MSBC architect: 11902 - Norback, David Charles
Installing (26) chilled water ductless fan-coil Units for telephone room cooling with associated pumps, plate heat exchangers, chilled water and condensate pipes per approved plans…
US Bank/40th floor-break room sink
demo and restore walls and horizontal assemblies related to plumbing work certificate of occupancy required: no special inspections required: yes const type: 1/A occupancy: B 2020…
escalator removal. demo only certificate of occupancy required: no The building inspector must approve the restoration of fire rated assemblies disrupted by the work before conceal…
escalator modernization certificate of occupancy required: no const type: 1-B occupancy: B 2020 MSBC occupant load: no change sprinklered: yes Additional elevator review required b…
new 4" water riser from 15th fl to 38th floor less than 250'
Replacement chillers Refer to drawing attached as well as mark up notes notes I sent to the engineer. the notes show up as a blue PDF. You will have to choose yes to open it once y…
Replacing various branch ducts and diffuser per engineer drawing for level 28 and 29 of the north building. Drawing attached.
office remodel throughout 28th and 29th level certificate of occupancy required: no special inspections required: no const type: 1-A occupancy: B 2020 MSBC occupant load: no change…
FOR 28TH - 29TH FLOORS RESTROOMS - INSTALL PLUMBING FOR NEW SINKS, TOILETS, AND DRINKING FOUNTAINS INSTALL SALVAGED TOILETS AND URINALS WITH NEW LAVS IN EXISTING BATHROOMS
demo/cap fixtures 28th /29th floor for white box
GRDs and ductwork modification per attached drawings.
Office Remodel certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2020 MSBC occupant load: 133 sprinklered: yes 20% accessibility up…
15th floor break sink, drinking fountain and restrooms
HVAC system, adding new fan-coil unit, reheat coil for outside air, hydronic piping, supply diffusers, return grills and all associated duct work. Refer to attached drawings.
INTERIOR REMOD SUITES 140 AND 145 6/25/20 changed value of work from $418,827 to $185,744 based on contracts and recalculated fees certificate of occupancy required: no ***** speci…
#145 Elect Water Heater & Kitchen Sink
Supply diffuser relocation.
Tenant Remodel 23rd Floor certificate of occupancy required: no ***** special inspections required: no***** const type: 1A ***occupancy: B ***2015 MSBC***** sprinklered: yes *****…
INSTALL PLUMBING FOR AGILE TENANT SPACES ON 10TH & 17TH fLS & REMODEL EXISTING CORE RESTROOMS
10TH AND 17TH FLOORS certificate of occupancy NOT required: ********** special inspections NOT required: **** const type: 1A ** occupancy: B ** 2015 MSBC************** occupant loa…
May 7 removed demo cost covered under BLDG761186. **REMODEL ELEVATOR LOBBY AND TENANT SPACES 17TH FLOOR SOUTH TOWER. MOST CORE ELEMENTS ARE unaffected by work. As permitted by Acce…
Demo only 17th floor in prep for BLDG 761152
REWORK EXISTING DUCTS / ADD FIRE SMOKE DAMPERS / TRANSFER FANS PER ENG DRAWINGS FOR FLOORS 11,12,& 19
REMODEL FLOOR 11, 12 19
REMODEL OF 11TH, 12, AND 19TH FLOORS. PARTIAL REMODEL OF 11TH FLOOR. ADDING ADA BATHROOMS AND RECONFIGURING SPACE. LOBBY ADDED TO 11TH FLOOR. (JJL)********** certificate of occupan…
RELOCATE DUCTS & DIFFUSERS ONLY FOR 22ND FLOOR / NO PLANS SUBMITTED
FOR 22ND FLOOR/PRIVATE RESTROOM - REPLACE BREAKROOM SINK AND ELECTRIC WATER HEATER, ADD LAVATORY AND TOILET
TENANT SPACE REMODELING certificate of occupancy required: NO special inspections required: YES - FIRE RATED PENETRATIONS const type: I-A occupancy B 2015 MSBC occupant load: NO CH…
INTERIOR DEMO AT FLOOR 11 (PARTIAL) ENTIRE 12 AND 19 (MAA) const type: I A occupancy: B 2015 MSBC occupant load; NO Tenant: US BANK Floor(s): 11, 12 AND 19 architect: DAVID NORBACK…
Boiler coupling repair
2ND FLOOR/NORTH TOWER - ALT RESTROOM EXHAUST
CHILLER TEARDOWN
ADD ROOFTOP TELECOM EQUIPMENT AT NORTH (TALLER) TOWER. 3 RADIOS AND ANCILLARY EQUIPMENT ENGR: CHRISTOPHE J WARREN #43496 ROOFTOP FRAME EVAL ENGR: STEVENS #52443
New ductwork for interior zones and one VAV box for exterior zone.
FOR 31ST FLOOR - TOILET, WALL HUNG LAVATORY, STAINLESS STEEL SINGLE COMPARTMENT SINK AND 2 INCH DIAMETER FLOOR DRAIN
TENANT OFFICE REMODEL TO 7,460 S.F AT NORTH SIDE OF 31ST FLOOR. DEMO EXISTING FOR NEW OFFICES, OPEN OFFICES, SMALL CONFR RMS AND EMPLOYEE BREAKROOM. (DMH#1) INSTALL NEW SINGLE USER…
15th floor - rework new ductwork and diffusers per plans
install plumbing for 2 single restrooms skyway level
KITCHEN SINK 15TH FLOOR
Tenant Improvement - Partial 15th Floor certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2015 MSBC occupant load: 155 sprinklered:…
16TH FLOOR: A/C, DUCTS, DIFFUSERS, & VAV'S
19TH FLOOR SOUTH TOWER - DUCT AND VENTILATION MODIFACATIONS PER ENGINEERED DRAWINGS
19th Floor, demo 2 sinks 2 elec water coolers install water heater ice maker and lines. run w/v and water piping to new fixtures. install sink and faucet
TENANT IMPROVEMENT 19TH FLOOR. TWO HOUR FIRE RESISTIVE RATING REQUIRED FOR FLOOR CONSTRUCTION AND ASSOCIATED SECONDARY MEMBERS certificate of occupancy required: no special inspect…
Green and the Grain
FOR 16TH FLOOR BREAKROOM: BREAKROOM SINK, WATER HEATER AND FLOOR DRAIN
NEW RESTAURANT IN SHELL SPACE (MAA #02) ********EXIT DOORS TO PROVIDE PANIC HARDWARE certificate of occupancy required YES mechanical plans required for certificate of occupancy YE…
RAINWATER LEADER
CREATE TWO WELLNESS ROOMS WITH DEMISING WALL AT 7TH FLOOR, NORTH TOWER US BANK PLAZA. (LAH) certificate of occupancy required NO mechanical plans required for certificate of occupa…
ADD SINK
NORTH TOWER SECURITY ENHANCEMENT AND DESK REMODEL (MAA #02) AS PER DISCUSSION WITH DAN AND STATE THE PROPOSED SECURITY GATES MEET THE ACCCESSIBILITY CODE. EMAIL COMMUNICATION WITH…
ADD DOORS, FRAMES AND HARWARD IN CORRIDORS TO ENSURE NON-EMPLOYEES ACCESS TO CERTAIN AREAS (KAS #1) certificate of occupancy required no mechanical plans required for certificate o…
temp heat for 10 days
2ND FLOOR / BROADWAY PIZZA - VENTILATION WORK INCLUDES - NEW DIFFUSERS & DUCTWORK - RELOCATE KITCHEN HOOD 2ND FLOOR / BROADWAY PIZZA - VENTILATION WORK INCLUDES - NEW DIFFUSERS & D…
4 ice makers on 30th floor 4 ice makers on 30th floor