Building permit intelligence · Minneapolis, MN
225 6TH St S has 200 municipal building permits on file in Downtown West. The latest recorded activity was a commercial permit dated Jun 16, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 4 mapped permits within 500 m of this address.
LEVEL 25 ELEVATOR LOBBY REMODEL. CORE RESTROOM REMODEL. NO CHANGE TO EXITING. (JJL) certificate of occupancy required: no special inspections required: no const type: IA occupancy:…
Relocate one fan powered VAV box with hot water piping, replace 1 diffuser per approved plan.
SUITE 2500. OFFICE REMODEL. (JJL) certificate of occupancy required: no special inspections required: no const type: I-A occupancy: B 2020 MSBC occupant load: 160 sprinklered: yes…
Pull and replace 1 drinking fountain, 6 lavs, 2 urinals & 5 toilets.
HVAC alterations include modifying the existing distribution system through the current air handling units, reusing existing fan-powered and VAV boxes to suit the new floor layout,…
4 mapped permits within 500 m, shown on the intelligence map above.
5 other addresses on 6TH St S with municipal permit records in Minneapolis.
This address has 200 permit records in PropertyLabs' public history and is located in Downtown West. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 29, 2026.
PropertyLabs compiled this permit history from municipal public records for Minneapolis, MN. The latest recorded permit activity at 225 6TH St S is dated Jun 16, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 225 6TH St S in the PropertyLabs platform, along with alerts when new permits are filed at this address.
2 dishwashers, 2 kit sinks 4 coffee makers
Demo tenant space at Level 46 -ACW certificate of occupancy required: no special inspections required: no const type: 1-A occupancy: B 2020 MSBC occupant load: 85 sprinklered: yes…
ComMFDNR
Remodel
ComMFDNR
ComMin
ComMFDNR
Remodel
install waste vent & water. Install 1 toilet, 1 lav, 2 break room sinks, 3 bar sinks & 3 garbage disposals
!0- Linear diffusers, 2- 2x2 lay in diffusers and 5 egg creates. BLDG1155107
Interior buildout of 11th floor office space -ACW certificate of occupancy required: no mechanical plans required for certificate of occupancy special inspections required: no cons…
Demolition only of existing 11th floor space -ACW certificate of occupancy required: no special inspections required: no const type: I-A occupancy: B 2020 MSBC occupant load: 315 s…
Relocate 2 diffusers and associated branch ducts and 1 return air ceiling grill, 2 linear diffusers and 1 10"x10" wall transfer. All work is associated with multi-tenant corridor 1…
Add demising wall, corridor, modify elevator lobby doors/walls, finishes, and selective demo in existing suite -ACW certificate of occupancy required: no special inspections requir…
remodel office suite 1800. 18th floor. certificate of occupancy required: no const type: 1a occupancy: b 2020 MSBC sprinklered: yes sac: __ charges __ credits = __ net met council…
Replace 3 branch ducts and diffusers. BLDG1110567
TENANT REMODEL. INFILL STAIRS. WORK TO BE DONE ON 11, 12, AND 13. REMOVE STAIRCASE FROM 11 TO 12. ADD STAIRCASE FROM 12 TO 13. (JJL) certificate of occupancy required: no special i…
FOR FLOORS 12 & 13/STAR & TRIBUNE - HOT H20 & ICE LINES: CONNECTIONS TO 3 HOT WATER DISPENSERS AND 1 ICE MAKER
HVAC system, installing one VAV box, GRDs and all associated ductwork per approved plans.
3rd floor capella towner white box Demo existing sink, demo waste, vent water and cap.
DEMO 3RD FLOOR 2020 MSBC architect: 47101 - Layne, Anthony William
27TH FLOOR CORRIDOR REMODEL. MOSTLY FINISH WORK. NO STRUCTURAL WORK. (JJL) certificate of occupancy required: no special inspections required: no const type: IA occupancy: B 2020 M…
FLOOR 15 AND 52. DEMO AND REMODEL FOR WHITESPACE. ELEVATOR LOBBY DOORS TO REMAIN. (JJL) certificate of occupancy required: no special inspections required: no const type: IA occupa…
R ework of existing HVAC for new floor plan per approved plans.
HVAC system, using existing building shell HVAC system and installing one new fan-powered box and one VAV box, one heat pump unit, GRDs and all associated ductwork per approved pla…
Remodel of 40th floor for new tenant Ciresi Conlin.
T/I - 40TH FLOOR const type: IA occupancy: B 2020 MSBC occupant load: 100 sprinklered: yes architect: 53229 - Batcheller, Kim M.
install plumbing for break sinks and appliances, remove and install fixtures in building restrooms.
SUITE 2800. INTERIOR RENOVATIONS ON 27TH AND 28TH FLOOR. INCLUDES LOBBYS, RESTROOMS, ETC. NO CHANGE TO EXITING. (JJL) certificate of occupancy required: yes special inspections req…
AT 15TH FLOOR ROOF DECK - INSTALL GAS PIPING FOR FIREPIT. WINTROP & WEINS PHASE 2
STAIR INFILL BETWEEN THE 17TH AND 18TH FLOOR. (JJL) certificate of occupancy required: no special inspections required: yes - CONCRETE, STEEL. BRAUN INTERTEC const type: IA occupan…
Gas outdoor fireplace on roof deck/ Ste 1223
Rework duct system, installing new 4 pipe fan coil unit, and modify existing bathroom exhaust. BLDG1065826
DEMO PLUMBING AND CAP AT MAIN
INSTALL PLUMBING FOR (1) TOILET, (1) LAV, (1) SINK, (1) ICE MACHINE, (1) DISHWASHER
40th floor demo and floor infill
Replace dishwater Suite #2300
15th floor remodeling and roof deck space certificate of occupancy required: no special inspections required: yes, structural and spray fire proofing const type: 1-A occupancy: A-3…
BLDG1055577 Duct and HP modifications.
31ST FLOOR/MASLON - PLUMBING FIXTURES: INSTALL PLUMBING FOR (1) TOILET, (1) LAV, & (1) BREAK SINK
Suite 3100 - Interior build out of office space certificate of occupancy required: no special inspections required: no const type: 1-A occupancy: B 2020 MSBC occupant load: 112 spr…
SUITE 3100 - INTERIOR DEMO ONLY certificate of occupancy required: no const type: 1-B occupancy: B 2020 MSBC sprinklered: yes Tenant: TBD Floor(s): 31 architect: T Layne #47101
Re-work existing ductwork and VAV for new floor plan on levels 32 through 37
DEMO EXISTING PLUMBING, REMODEL EXISTING RESTROOMS, INSTALL PLUMBING FOR NEW BREAKROOMS FLOOR 32-37. Not food service - no plumbing plan review required
Remodel of floors 32-37 certificate of occupancy required: no special inspections required: yes const type: 1-A occupancy: B 2020 MSBC occupant load: no change sprinklered: yes (in…
NON STRUCTURAL INTERIOR DEMO ONLYAT FLOOR 32, 33,34,35,26,37 (MAA) ARCHITECT KIM M, BATCHELLER # 53229
Office Remodel - Add wall for separate tenant space - 18th Floor certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2020 MSBC sprink…
DEMO EXISTING RESTROOM FIXTURES, INSTALL NEW RESTROOM FIXTURES & INSTALL PLUMBING FOR NEW BREAK SINK & WELLNESS SINK
Using existing system, installing one new water source heat pump, VAV boxes, GRDs and all associated ductwork. Refer to attached drawings.
Interior remodel of 29th and 30th floors certificate of occupancy required: no const type: 1-A occupancy: B 2020 MSBC occupant load: no change sprinklered: yes sac: __ charges __ c…
HVAC alteration, using existing VAV & fan-powered boxes and main ductwork, installing one new water source heat pump, one VAV box, GRDs and all associated ductwork. Refer to attach…
47th floor remodel certificate of occupancy required: no const type: 1-A occupancy: B 2020 MSBC occupant load: no change sprinklered: yes 20% accessibility upgrades_ fully accessib…
HVAC alteration installing 13 VAV boxes, 2 fan-coil units, chilled water piping, GRDs and all associated ductwork. Refer to attached drawings.
Selective demo. Install plumbing for (7) lav, (7) WC, (2) UR, (1) EWC, (1) MS, (1) Wellness Rm SK, (3) Break/Lounge type SK, (1) Electric Water heater, (4) FD,
REMODEL OFFICE TO BE 'AMMENITY' MINOR STRUCTURAL 2ND FLOOR certificate of occupancy required: no special inspections required: no const type: I-A occupancy: B 2020 MSBC sprinklered…
Plans uploaded. Duct re-work for new floor plan.
FOR FLOORS 29 & 30 RESTROOMS - DEMO RESTROOMS AND INSTALL NEW FIXTURES AND INSTALL PLUMBING FOR NEW FIXTURES.
INTERIOR DEMO ONLY LEVELS 29 & 30 certificate of occupancy required: no special inspections required: no const type: 1-A occupancy: B 2020 MSBC occupant load: TBD sprinklered: yes…
SUITE 4300 - INSTALL DEMISING WALL certificate of occupancy required: no const type: 1-A occupancy: B 2020 MSBC occupant load: no change sprinklered: yes Floor(s): 43 architect: M…
SUITES 4200 & 4300 - OFFICE RENOVATIONS certificate of occupancy required: no const type: 1-A occupancy: B 2020 MSBC occupant load: no change sprinklered: yes Floor(s): 42 & 43 arc…
plumbing for 1 toilet and 1 lav
Capella Tower 16th floor tenant improvement, installing new ductwork, diffusers and relocating one heat pump. refer to attached drawings.
FOR 15TH FLOOR - GAS PIPING/LINE TO 80000 BTU FIREPLACE
REMODEL RESTROOMS AT 26TH FLOOR (MAA) const type: I A occupancy: B 2020 MSBC occupant load: N/A sprinklered: YES 20% accessibility upgrades__________ Tenant: SHORENSTIEN PROPERTIES…
FOR ROOFTOP FIRE PIT - INSTALL GAS LINE FOR OUTDOOR ROOFTOP FIREPIT
replacement of an existing , above ceiling, water source heat pump that is ducted into the equipment rooms with VRF system.
17th and 48th floor bathrooms
REMODEL 17TH FL CORRIDOR & RESTROOMS ON 17TH & 48TH FLRS (26th floor restrooms removed from scope) certificate of occupancy required: no special inspections required: no const type…
HVAC alteration for floors 44 & 45 Capella Tower, reusing existing VAV and fan powered boxes, GRDs and all associated ductwork. Refer to attached drawings.
INSTALL PLUMBING FOR NEW BREAK SINKS AND REMODEL RESTROOMS FOR NEW LAYOUT.
certificate of occupancy required: no special inspections required: yes const type: I-A occupancy: B 2020 MSBC occupant load: sprinklered: yes energy code chapter used: elevator re…
NON STRUCTURAL DEMO FOR FUTURE REMODEL AT LEVEL 44 AND 45 (MAA) ARCHITECT: 49342
Temporary 76" X 52" floor opening for Elevator modernization Additional building permit is required. Architect's analysis and documents to show fire rating and construction require…
PARTIAL ROOF REPLACEMENT OF 15TH AND 45TH FLOORS. (JJL) SEE SCOPE ATTACHED.
INSTALL (1) SINK, (1) DISHWASHER, (1) COFFEE WATER, (1) FRIDGE WATER
HVAC alteration, reusing seven existing water source heat pumps, rework piping and adding GRDs and all associated ductwork. Refer to attached drawings.
buildout 15th floor offices - approx. 5300 sq ft, Forsgren Fisher tenant space.. certificate of occupancy required: no const type: 1a occupancy: b 2020 MSBC sprinklered: yes archit…
INSTALL ONE WATER LINE FOR COFFEE MAKER
Tenant Improvement - Skyway Level Restaurant - Mother Dough certificate of occupancy required: no special inspections required: no const type: 1A occupancy: A2 2020 MSBC occupant l…
Fixture install, 14th floor
HVAC modification, using main building supply and return, reusing existing VAV and Fan-Powered boxes and adding five cooling only VAV boxes, hydronic piping, GRD's and all associat…
1 water booster pump
non-structural remodeling of approximately 16,000 SF of the 14th floor certificate of occupancy required: no special inspections required: no const type: I-B occupancy: A-3, B 2020…
48TH FLOOR. CORRIDOR REMODEL ON 48TH FLOOR. ELEVATOR LOBBY FINISHES, NEW LOBBY DOORS. certificate of occupancy required: no ***** special inspections required: no***** const type:…
Install one (1) new water cooler - 48th floor
Installation of type 2 hood, duct, and exhaust fan. Confirm discharge location complies with MSMC 506.4.2. Also confirm equipment below hood is approved for a Type 2 hood installat…
SUITE 250 - REPLACE TWO 8 TON HEAT PUMPS
FOR SUITE 250 - INSTALL BIDET TOILET SEAT ON EXISTING ADA TOILET
Building HVAC system partial modification, replacing two CRACs and providing new Liebert with condensate pump and connecting to existing chilled water lines, demo supply diffusers…
office suite 4300 remodel - tenant expansion into vacant suite. sck certificate of occupancy required: no const type: 1a occupancy: b 2020 MSBC sprinklered: yes
INSTALL 2 BREAK ROOM SINKS AND 6 LAVATORY SINKS
remodel 53rd floor offices. sck certificate of occupancy required: no const type: 1a occupancy: b 2020 MSBC sprinklered: yes 20% accessibility upgrades___new single user toilet roo…
WATER HEATER
FULL FLOOR OFFICE REMODEL certificate of occupancy required: no ***** special inspections required: no***** const type: I-A ***occupancy: B ***2020 MSBC***** occupant load: 96 ****…
Fixture Installation 10/21/20 Level 14
EXECUTIVE OFFICE BUILD OUT IN EXISTING OFFICE SUITE (MAA) ARCHITECT NATE ENGER 47250
Fixture install/hookup. Level 14
Tenant Interior Remodel - Northrock Partners certificate of occupancy required: no special inspections required: no const type: 1A ***occupancy: B ***2015 MSBC sprinklered: yes 20%…
LEVEL 2 OFFICE EXPANSION. NEW OCCUPANT LOAD 43. Architect Enger #47250
NON-STRUCT ELEV LOBBY FLOORING,LIGHTING, PAINT UPGRADES 14TH LEVEL. Restore disrupted fire rated assemblies as occurs. Architect: Griffith #56497. !-A, sprinklered, B occupancy. SA…
SKYWAY LEVEL ELEVATOR LOBBIES. No impact on rated assemblies, occupant exiting, or mechanical systems.
INSTALL 14 INCH ROUND GREASE DUCT FROM NEW HOOD TO EXISTING LOUVER / INSTALL CLEANOUTS TO CODE / 3 INCH STAND OFF PANEL INSTALLED UNDER HOOD
DISCONNECT/RELOCATE ROUGH-INS, 5 WATER CLOSETS,1 URINAL, 5 LAVATORIES
SUITE 4600. 46TH FLOOR. CIRESI CONLIN RENOVATION. DEMO SOME EXISTING INTERIOR PARTITIONS. NO CONSTRUCTION FOR BATHROOMS, NO CHANGE OF EXITING. (JJL)********** certificate of occupa…
THE NAUGHTY GREEK - INDIRECT WASTES AND GAS PIPING PLAN REVIEW NOT REQUIRED PER MATT FIGUS AND SCOTT EGGEN.
INSTALL PLUMBING FOR BREAK ROOM - LEVEL 43
Corridor, lobby and toilet room renovation level 43 certificate of occupancy required: NO ***** special inspections required: YES - FIRE RATED PENETRATIONS***** const type: I-A ***…
Tenant remodeling for new whitebox shell space in prep for future tenant. certificate of occupancy required: NO ***** special inspections required: NO***** const type: I-A ***occup…
Corridor and lobby remodeling level 31 certificate of occupancy required: NO ***** special inspections required: NO***** const type: I-A ***occupancy: B ***2015 MSBC***** occupant…
RUN 2" GAS MAIN LINE FOR TENANT BUILD OUT
Tenant remodeling certificate of occupancy required: NO ***** special inspections required: YES - FIRE RATED PENETRATIONS***** const type: I-A ***occupancy: B ***2015 MSBC***** occ…
Non-structural remodel existing restaurant to new restaurant. __certificate of occupancy required: no __ new grease duct does not penetrate rated or structural assemblies __special…
HVAC system, rearranging the supply diffusers with new layout and adding two 2 ton water source heat pump and 3 fan-powered box and 9 VAV boxes and all associated duct work and dif…
EXISTING BATHROOM REMODEL. FIXTURES TO GO IN THE EXACT SAME PLACE. NO STRUCTURAL WORK. SAME LAYOUT AS PREVIOUS. (JJL)************* ARCHITECT: ESG NATHANIEL ENGER #47250************…
remodel 10th floor offices - single tenant floor. sck***** certificate of occupancy required: no **** const type: 1a ***occupancy: b ***2015 MSBC***** sprinklered: yes ***** Tenant…
REWORK EXISTING DUCTS & DIFFUSERS FOR NEW FLOOR PLAN PER PLANS / NO NEW EQUIPMENT
certificate of occupancy NOT required: ********** ***All criteria of 1008.1.9.8 (printed on sheet AN-1) must be in place for the Inspector to Final-Approve the Access-controlled eg…
INSTALL BREAKROOM SINK & DISHWASHER
FOR 15TH FLOOR - CONNECT 2 GAS FIREPLACES TO EXISTING GAS SERVICE
Install 2 Heat Pumps and distribution ducts. in new head end room, per drawing.
(DMH#1) INTERIOR OFFICE DEMO ONLY AT FLOORS 14, 44 AND 45. SELECT DEMO OF TENANT PARTITION WALLS. ADDITIONAL PLANS, APPROVALS AND PERMITS REQUIRED FOR REMODELING. Const type: I-A O…
15TH FLOOR GAS PIPING TO ROOF DECK FOR FUTURE FIREPLACE / BATHROOM EXHAUST & VESTABULE HEATER / GAS PIPING ONLY, ADDITIONAL PLBG. PERMIT IS REQUIRED FOR FIREPLACE
NEW DUCTS, DIFFUSERS & VAV'S FOR 4TH FLOOR PER PLANS
15TH FLOOR INSTALL NEW RESTROOMS
add 1 vav 26th floor
LEVEL 4 SHEPHERD DATA
4TH FLOOR -LIEBERT A/C, DUCTWORK, DIFFUSERS & FPVAVS PER ENGINEERED DRAWINGS
15TH FLOOR - DEMO DUCTWORK AND MODIFY DUCTWORK
INTERIOR REMODEL - 26TH FLOOR certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2015 MSBC sprinklered: yes Tenant: Winthrop & Weins…
TENANT IMPROVEMENT AT 4TH FLOOR (MAA#01) const type: I A occupancy: B, A3 2015 MSBC occupant load: 97 sprinklered: YES Tenant: SHEPHERD DATA Floor(s): 4TH architect: NATE ENGER 472…
breakroom sinks 4th floor jp morgan
restroom 4th floor
restroom 43rd floor
REMODEL LEVEL 15 TO INCLUDE NEW FUTURE TENANT SPACE, TOILET ROOMS AND OCCUPIED ROOF DECK certificate of occupancy required: YES special inspections required: YES - Fire rated penet…
43RD FLOOR CORRIDOR - REWORK DIFFUSERS
41ST FLOOR CORRIDOR - REWORK DIFFUSERS
4th floor Interior build-out of partial floor office suite in Capella. No structural or exterior work. Building owner to provide demising walls for space. (JJL) certificate of occu…
interior improvements level # 4. IMPROVEMENTS ARE TO BATHROOMS AND CORRIDOR. OTHER SPACES ARE NOT INCLUDED ON THIS PERMIT. ALL NON COMBUSTIBLE CONSTRUCTION. (JJL) certificate of oc…
breakroom sink 2nd floor - modern
41ST FLOOR ATTIC - REWORK DUCTWORK AND DIFFUSERS FOR NEW FLOOR PLAN
25TH FLOOR REWORK EXISTING DUCTWORK AND DIFUSERS Refer to Plan for notes. Note: Balancer to verify minimum 145 cfm outside air
BREAK ROOM SINK 41ST FLOOR
BREAK ROOM SINK
Interior Office Build Out- 2nd floor space. NO CHANGE OF BATHROOMS OR EXITING ON THE FLOOR. NON-COMBUSTIBLE CONSTRUCTION. (JJL) *************APPLICANT DID NOT PAY. DRAWINGS ARE BEH…
REWORK EXISTING RESTROOMS 41ST FLOOR
TENANT INTERIOR IMPROVEMENTS SUITE 2590 (MAA#02) REMODEL RESTROOMS, ELEVATOR LOBBY AND CORRIDORS, MAINLY FINISHES, NO CHANGE IN EXITING AT 4I ST FLOOR (MAA#01) certificate of occup…
REMODEL RESTROOMS, ELEVATOR LOBBY AND CORRIDORS, MAINLY FINISHES, NO CHANGE IN EXITING AT 43 ST FLOOR (MAA#01) certificate of occupancy required: NO const type: 1-A occupancy: B 20…
REMODEL RESTROOMS, ELEVATOR LOBBY AND CORRIDORS, MAINLY FINISHES, NO CHANGE IN EXITING AT 4I ST FLOOR (MAA#01) certificate of occupancy required: NO const type: 1-A occupancy: B 20…
TENANT INTERIOR IMPROVEMENTS SUITE 4125 (MAA #02) certificate of occupancy required: NO occupant load 27 const type: 1-A occupancy: B 2015 MSBC sprinklered: YES Tenant: SHORENSTIEN…
Relocate 3 heat pumps and extend core loop.
install plumbing for tenant floor 17 and 18
Rework ductwork to accommodate tenant layout per engineered drawings on 17th and 18th floors
Levels 17-19 demo and remodels of freight elevator lobbies and modifications for roof deck. sck#1 occupant load : 118 installation of platform lift between level 18 and 19. archite…
OFFICE REMODEL TO 17TH AND 18TH FLOOR FOR SINGLE TENANT USE. EXISTING CONVENIENCE STAIRS FOR 17TH & 18TH FLOOR. (DMH#1) INSTALL NEW SINGLE USER ADA RESTROOMS ON 17TH & 18TH FLOORS.…
REWORK DIFFUSERS FOR NEW FLOOR PLANS FOR SUITE #4600
47TH FLOOR DEMO ONLY. PREPARING FOR FUTURE TENNANT. (JJL) NO STRUCTURAL MODIFICATIONS.
45TH FLOOR DEMO ONLY. (JJL) NO STRUCTURAL WORK.
46th floor remove 2 sinks modify plumbing at 1 location , install 2 new sinks re use water heaters
DUCTWORK/DIFFUSERS PER NEW FLOOR PLAN ON 18TH FLOOR
minor office alterations on 46th floor. sck#1
suite # 1850 breakroom sink
interior remodel at suite 1850 certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2015 MSBC occupant load: 36 sprinklered: yes Tenan…
level 43. 1 sink and 1 water heater
relocate supply and returns 27 & 28th floor
relocate vav box
kitchen sink
a/c equipment
NON STRUC INT REM LEVEL 43 OFFICES APPROX 1,772 SF (JAG) certificate of occupancy required :no special inspections required :no const type: 1-A occupancy: B 2015 MSBC occupant load…
INSTALL MOTORIZED BARRIER PANELS AT ELEVATOR LOBBIES ON SKYWAY LEVEL (WSS) certificate of occupancy required no special inspections required no const type: TYPE 1 occupancy: B 2015…
ADD 2 OFFICES AND MOTHERS ROOM AT 2ND FLOOR (MAA#01) ARCHITECT NATHANIEL SHEA MN REG# 24515
FOR SUITE 2675 BREAKROOM: SINK AND UNDER THE COUNTER WATER HEATER
duct work distribution, server rooms
16th flr-4 VAV and 1 heat pump with distribution
suite # 1730 2 kitchen sinks
remodel office suite 2575. sck#1
Tenant Build out approx. 5,635 s.f. certificate of occupancy required no const type: I-A occupancy: B 2015 MSBC occupant load: 57 sprinklered: yes energy code chapter used: ASHREA…
16th floor bathroom remodel 3 kitchen sinks
19TH FLOOR/RELOCATE DIFFUSERS & NEW HEAT PUMP
floor 18 reset bathroom fixtures
office alterations on 20th floor. sck#2 certificate of occupancy required no special inspections required no const type: 1a occupancy: b 2015 MSBC sprinklered: yes Tenant: baker ti…
18th floor 3 kitchen sinks
NON STRUCTURAL DEMO AT 17TH FLOOR FOR FUTURE REMODEL (MAA #02)
REMODEL COMMON CORRIDOR AND RESTROOMS FOR ACCESSIBILITY - 1,970 SF - 18TH FLOOR, CAPELLA TOWER. (LAH) *B-R/R BUSINESS OCCUPANCY REMODEL OR REPAIR certificate of occupancy required…
NON STRUC INTERIOR OFFICE TENANT FINISHES APPROX 6194 SF NOT INVOLVING CORE AT PARTIAL 18TH FLOOR. (JAG) EXISTING EXIT SYSTEM UNCHANGED. certificate of occupancy required :no mecha…
COMPLETE OFFICE DEMO AND REMODEL TO 19TH FLOOR, 15,421 S.F, INCLUDING MENS & WOMENS RESTROOMS FOR SINGLE TENANT. (DMH#1) RESTROOM REMODELS UPDATED TO MEET ADA. CONFIRM COMMUNICATIO…
backflow
sink floor drain elec water heater suite #2700
tenant improvements on floors 38 , 39 and 40th floors (MAA #02) certificate of occupancy required NO mechanical plans/letter of means of compliance submitted: YES const type: I A o…
remodel offices on 27th and 28th floors. single tenant. sck#1 certificate of occupancy required no special inspections required yes no const type: 1a occupancy: b 2015 MSBC sprinkl…
16TH FLOOR - 18 fixtures: lavs, breakroom sink, toilets urinals
whole remodel of 38th, 39th, and 40th floors: 56 fixtures: 12 floor drains, 3 break room sinks, 16 toilets, 6 urinals, 3 water coolers