Building permit intelligence · Minneapolis, MN
120 6TH St S has 122 municipal building permits on file in Downtown West. The latest recorded activity was a commercial permit dated Mar 26, 2026. Permits at this address represent $5MM–$25MM in total declared construction value. PropertyLabs also identified 3 mapped permits within 500 m of this address.
Add office in existing space (related to BLDG1158381) -ACW certificate of occupancy required: no special inspections required: no const type: I-A occupancy:B 2020 MSBC occupant loa…
Suite 1400/Dishwasher, icemaker
office remodel - suite 2400. certificate of occupancy required: no const type: 1a occupancy: b 2020 MSBC sprinklered: yes sac: _0_ charges __ met council letter dated _2/5/26_ arch…
ComMin
Remodel and connect 2 existing tenant suites -ACW certificate of occupancy required: no special inspections required: no const type: I-A occupancy: B 2020 MSBC occupant load: 80 sp…
3 mapped permits within 500 m, shown on the intelligence map above.
5 other addresses on 6TH St S with municipal permit records in Minneapolis.
This address has 122 permit records in PropertyLabs' public history and is located in Downtown West. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 29, 2026.
PropertyLabs compiled this permit history from municipal public records for Minneapolis, MN. The latest recorded permit activity at 120 6TH St S is dated Mar 26, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 120 6TH St S in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Remodel office suite in existing building -ACW certificate of occupancy required: no special inspections required: no const type: I-A occupancy: B 2020 MSBC occupant load: 79 sprin…
Installing GRDs and all associated ductwork per approved plans.
Installing GRDs and all associated ductwork per approved plans.
21st floor, Furnish and install fixtures, 5 water closets, 2 urinals, 3 lavs, 1 water cooler, 1 electric water heater
COMMON AREA FINISHES UPGRADES 21ST FLOOR const type: I-A occupancy: B 2020 MSBC architect: 17408 - Hustad, Mary B @ NELSON
fridge and dishwasher
Remodel of existing office certificate of occupancy required: no special inspections required: no const type: I-A occupancy: B 2020 MSBC occupant load: 33 sprinklered: yes architec…
Suite 2100/Remodel of office break room.
Division of existing suite into two tenant spaces, including corridor extension for new suite entries and exiting. special inspections required: no const type: IA occupancy: B 2020…
Furia Law sink and dishwasher and coffee maker
Interior Tenant Renovations - Furia Law - Suite 1240 certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2020 MSBC occupant load: 34…
Tenant office expansion into adjacent space certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2020 MSBC occupant load: 120 sprinkle…
No piping work associated with this permit. BLDG1076079
GUSTAFSON GLUEK/STE 2500 - FIXTURES PER EXPANSION, SINK AND WATER HEATER
REMODEL SUITE 2500 const type: IA occupancy: B 2020 MSBC sprinklered: YES architect: 17408 - Hustad, Mary B SAC (0 charges) 7.16.24
diffusers like for like and stats like for like
Remodel of an existing office break room. Includes replacing a sink in the same location, and connecting water to a fridge and a coffee maker. No relocation or replacement of sink…
REMODEL SUIT 2350 const type: IA occupancy: B 2020 MSBC occupant load: 46 sprinklered: YES architect: 17408 - Hustad, Mary B SAC (0 charges) 5.20.24
FOR 22ND FLOOR COMMON AREA - PLUMBING: Replacing 5 water closets, 4 lavatories, 1 drinking fountain, 2 urinals. No new piping work.
Relocating three diffusers to accommodate the new floor plan.
#1400 waterline serving coffeemaker
new office break sink
Tenant Improvement - Suite 1200 certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2020 MSBC occupant load: 18 sprinklered: yes Tena…
common area 22nd floor bathrooms corridor and elevator lobby refresh finishes certificate of occupancy required: no special inspections required: no const type: 1-A occupancy: B 20…
14 Floor Tenant Remodel - Remove Existing Communicating Stairway to 13th Floor certificate of occupancy required: no special inspections required: yes const type: 1A occupancy: B 2…
DEMO WORK RELATED TO BLDG993050 PREPARE FOR STAIRWAY & ELEVATOR DEVICE 17TH TO 18TH FLOORS certificate of occupancy required: no special inspections required: no const type: IA occ…
OFFICE EXPANSION/RENOVATION. FUTURE STAIRS AND LIFT TO BE ADDED AT A LATER DATE ON SEPARATE PERMIT. (JJL) certificate of occupancy required: no ***** special inspections required:…
Installing GRDs and all associated ductwork. Refer to attached drawings.
Non-Structural Demo of partitions, doors and flooring levels 17 and 18 new floor opening and new stair, partitions, doors, etc require separate permits. certificate of occupancy re…
remove escalator and replace with stair between basement and first floor. engineer: grant
remodel office suite 2260. approx. 6200 sq ft. SAC (0 charges)
FOR FLOORS 12 & 24 - RESTROOM FIXTURES
REMODEL 12TH AND 24TH FLOORS ELEVATOR LOBBY, RESTROOMS, CORRIDORS certificate of occupancy required: no special inspections required: no const type: 1-A occupancy: B 2020 MSBC occu…
Dishwasher Suite 1700
Corridor and restroom remodel special inspections required: no const type: 1A occupancy: B 2020 MSBC sprinklered: yes Tenant: Common Areas Floor(s): 19 & 23 architect: Mary Hustad…
Plumbing for office remodel - common areas - Floors 19 and 23
Replace existing storefront and door system with new storefront and revolving door. Concourse level Architect: NELSON - Mary Hustad #17408
Plumbing for remodel of restrooms on 14th and 25th floors
whitebox remodeling of office spaces 1240, 1951, and 2450. sck
Replace diffusers in common areas on 4 floors.
NONSTRUCT INTERIOR REMOD OF CORE FACILITIES certificate of occupancy required: no ***** special inspections required: no***** const type: I-A ***occupancy: B ***2020 MSBC***** occu…
Plumbing for remodel of office, Sink replacement.
(DMH - ProjectDox) 17TH FLOOR SELECT DEMO OF OFFICE DEMISING WALL, PARTITIONS, RECEPTION AND LIGHTING TO COMBINE ADJACENT OFFICE SPACE AND REMODEL FOR NEW 4,117 SQ.FT. TENANT SPACE…
DEMO INTERRIOR OFFICES TO CREATE A WHITE BOX FOR FUTURE TENANTS (MAA) certificate of occupancy required: NO ***** const type: I A ***occupancy: B ***2020 MSBC***** occupant load: 2…
Modifying existing supply diffusers and return grilles for 6 office remodeling.
Tenant space remodeling certificate of occupancy required: NO ***** special inspections required: NO***** const type: I-A ***occupancy: B ***2015 MSBC***** occupant load: NO CHANGE…
Interior Renovations to Existing Coffee Shop certificate of occupancy required: no ***** special inspections required: no***** const type: 1A ***occupancy: B ***2015 MSBC***** occu…
remodel of office space on first floor suite 100. certificate of occupancy required: no ***** special inspections required: no***** const type: 1a ***occupancy: b ***2015 MSBC*****…
NON STRUCTURAL REMODEL SUITE 1400.. CO not reqd. Type I-A nfpa 13 __B occupancy. Occupant load of suite 1400 increased to 68 so 2nd exit access provided, sep by 1/3 diag.
Fan coil unit.
REPLACE DIFFUSERS FOR SUITE #2480
RELACE DIFFUSERS FOR SUITE #1300 AND 1475
REPLACE DIFFUSEERS FOR SUITE #2550
FIXTURES FOR 13TH FLOOR RESTROOM(S)
SUITE 2480 WHITE BOX TYPE REMODEL of 1610 SF office space. All disruption of horiz assembly must be restored. NFPA 13 sprinkler.. Architect Hustad #17408
SUITE 2550 WHITE BOX TYPE REMODEL. NFPA 13. 3870 SF remod of office space. Door entry hardware must be compliant by future TI. All disruption of horizontal assemblies must be resto…
SUITE 1300 and 1475 WHITE BOX TYPE REMODEL AND RESTROOM REMODEL. NFPA 13. 3870 SF remod of office space. Elev Lob Door hardware must be compliant by future TI. All disruption of ho…
FOR CLUB ROOM - INSTALL AND VENT NEW GAS FIREPLACE. GAS LINE BY OTHERS
RELOCATE DIFFUSERS AND RETURN AIR GRILLES - SUITE 1750
RELOCATE DIFFUSERS & RETURN GRILLES IN MISC AREAS - FLOORS 9 & 10
PER INCLUDED PLANS - FIRST FLOOR CONFERENCE CENTER / RELOCATE FCU,S / INSTALL 4 NES VAV'S AND DUCTS
1ST FLOOR - FIXTURES FOR RESTROOMS & 2ND BREAKROOM
INTERIOR REMODEL FOR NEW AMENITY SPACES FOR ARTIS REIT ON FIRST FLOOR OF EXISTING COMMERCIAL BUILDING. AAJ#1 certificate of occupancy required: NO mechanical plans required for cer…
interior remodel of office suite 2500. sck********** sprinklered: yes no ********** Tenant: lapp libra stoebner pusch Floor(s): 25 ************ architect: hustad
9TH 10TH AND 11TH FLOORS. REMODEL OF SOME SPACES. NO CHANGE TO EXITING. TYPE 1A CONSTRUCTION, NON COMBUSTIBLE ONLY. 9TH FLOOR: REMOVING 4 OFFICES, ADDING 7 OFFICES. 10TH FLOOR, ENL…
TENANT IMPROVEMENT #1750. No impact on rated assemblies
NEW FCU'S / VAV'S / EXHAUST FAN / PER ENG DRAWINGS
BREAK ROOM 1ST FLOOR
FOR SUITE 1725 - INSTALL BREAKROOM SINK AND ELECTRIC WATER HEATER
Minor remodel suite 1725
RELOCATE GRD'S ONLY FOR NEW LAYOUT
SUITE 150 AND 175 REMODEL - Office Remodel - No change to occupancy or occupant load certificate of occupancy required: no special inspections required: no const type: 1A occupancy…
break room sink in office space
Tenant buildout SUITE 2190 approx. 1,650 s.f. certificate of occupancy required: NO special inspections required: YES - FIRE RATED PENETRATIONS const type: I-A occupancy: B 2015 MS…
REPLACE RESTROOM EXHAUST / RELOCATS DIFFUSERS FOR LOWER LEVEL
relocate breakroom sink suite #2300
STREET LEVEL
replace water cooler level 1 fitness center
REMODEL OF SUITE 2300. TYPE IA CONSTRUCTION. NON-COMBUSTIBLE. REMOVING SOME INTERIOR NON LOAD BEARING WALLS. ADDING WALL. NO STRUCTURAL WORK. NO CHANGE TO EXITING. (JJL) certificat…
TENANT IMPROVEMENT AT UNIT # 2305 (MAA) const type: 1-A occupancy: B 2015 MSBC occupant load: 13 sprinklered: yes Tenant: CANADIAN PACIFIC Floor(s): 23RD architect: COLE DANIEL BAE…
TENANT IMPROVEMENT AT UNIT # 2310 (MAA) const type: 1-A occupancy: B 2015 MSBC occupant load: 13 sprinklered: yes Tenant: CANADIAN PACIFIC Floor(s): 23RD architect: COLE DANIEL BAE…
interior common area upgrade at grade level/concourse level. AREA BEING UPDATED IS NEAR PARKING AREA. EXISTING RAMP TO GET NEW RAILING AND DOORS. NO STRUCTURAL WORK. NEW ADA BATHRO…
1ST FLOOR - DIFFUSERS AND DUCT ALTERATIONS INSTALL ERU IN EXISTING MUA DUCT RELOCATE DIFFUSERS AND GRILLES PER NEW WALLS INSTALL ODOR ELLINATOR IN EXISTING OA DUCT
ADD DIFFUSERS FOR OFFICE - RELOCATE DIFFUSERS
EXISTING FITNESS CENTER RENOVATION AT FIRST FLOOR. NEW FINISHED. MOVING WALL. NO STRUCTURAL WORK. NO CHANGE OF EXITING. (JJL) certificate of occupancy required no mechanical plans…
NON STRUC OFFICE REMODEL COMBINING TWO OFFICES AND INSTALLING APPROX 12 X 10 NEW OFFICE IN OPEN OFFICE AREA (JAG) certificate of occupancy required: no mechanical plans/letter of m…
SUITE 1450 - RELOCATE DIFFUSERS for new layout and balance.
replace sink with new connect dishwasher suite1450
SUITE 1450 TENANT REMODEL certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2015 MSBC occupant load: 31 sprinklered: yes Tenant: Bi…
new sink
RELOCATE DIFFUSERS
SUITE 2190 - MODIFY DUCTWORK AND DIFFUSERS
REMODEL EXISTING OFFICE SUITE 1650 (4,064 SF) INCLUDING DEMO TO CREATE SPEC SUITE WITH OPEN OFFICE AREA AND MINOR STEEL STUD PARTITION FRAMING TO ENCLOSE ONE CONFERENCE ROOM. OPEN…
SUITE 2000-SINK/ROUGH IN
SUITE 2190-SINK/ROUGH IN
SUITE 1400 - RELOCATE DIFFUSERS
TENANT IMPROVEMENT OF EXISTING OFFICE SPACE IN PREPARATION FOR FUTURE TENANT. AAJ#1 certificate of occupancy required: NO mechanical plans required for certificate of occupancy mec…
TENANT IMPROVEMENT OF EXISTING OFFICE SPACE IN PREPARATION FOR FUTURE TENANT. AAJ#1 certificate of occupancy required: NO mechanical plans required for certificate of occupancy mec…
replace domestic water booster pumps in lower level with 1 in lower level to feed up to 27th floor and gravity down to 13th floor and the 2nd on 6th floor to pump up to the 12th fl…
INTERIOR TENANT REMODEL - SUITE 2260 certificate of occupancy required: no special inspections required: no const type: 1A occupancy: b 2015 MSBC occupant load: 82 sprinklered: yes…
TENANT-BUILD OUT OF 1,038SF SPACE IN SUITE 175 FOR TEMPORARY OFFICE TENANT (TICKETMASTER) DURING THE SUPERBOWL. MINOR DEMO INCLUDING REMOVING PARTIAL HEIGHT WALL AND BUILT-IN DESK,…
FOR 16TH FLOOR RESTROOMS: 2 ELECTRIC WATER HEATERS, 5 TOILETS, 2 URINALS, 3 LAVATORIES AND A DRINKING FOUNTAIN
#1600 - RELOCATE DIFFUSERS AND RETURN GRILLES
#1220 - RELOCATE 5 DIFFUSERS AND 3 THERMOSTATS
suite #1220 sink faucet and water heater
suite #1600 sink faucet and water heater
16TH FLOOR CORRIDOR AND ACCESSIBLE RESTROOMS (MAA #02) certificate of occupancy required NO const type: I-A occupancy: B 2015 MSBC sprinklered: yes Tenant: ARTIS Floor(s): sac: __c…
OFFICE TENANT IMPROVEMENT - SUITE 1220. SCK#1
REMODEL APPROX 4300 SQ FT OF OFFICE SPACE ON 16TH FLOOR. SCK#1
unit # 900 dishwasher
unit # 1000 dishwasher
unit # 1100 dishwasher
REPLACE THREE DISHWASHERS- 9TH, 10TH & 11TH FLOOR
FLOORS 9-11/MOBILE SOFT ADX RELOCATE DUCTWORK & GRD'S FOR STUDIO ROOM 11TH FLOOR
tenant improvements on 9th 10th and 11th floors. sck#2 certificate of occupancy required no special inspections required no const type: 1a occupancy: b 2015 MSBC sprinklered: yes a…
remodel office suite 1510 - approx. 2700 sq ft. sck#2 certificate of occupancy required no special inspections required no const type: 1a occupancy: b 2015 MSBC sprinklered: yes