1301 2ND Ave S has 97 municipal building permits on file in Loring Park. The latest recorded activity was a plumbing permit dated Apr 6, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 3 mapped permits within 500 m of this address.
Customer provided dishwasher, we are responsible to disconnect the existing dishwasher and reconnect the new. (water supply, drain)
Modify supply duct and install grease duct from new type 1 hood. (provided by others under their own permit BLDG1166323 ) Make up air is supplied from existing building systems. No…
In stalling commercial kitchen hood only. All other needed mechanical work to complete the kitchen ventilation and make up air are covered by a second permit that hasn't yet been i…
ComMFDNR
ComMFDNR
3 mapped permits within 500 m, shown on the intelligence map above.
7 other addresses on 2ND Ave S with municipal permit records in Minneapolis.
This address has 97 permit records in PropertyLabs' public history and is located in Loring Park. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 28, 2026.
PropertyLabs compiled this permit history from municipal public records for Minneapolis, MN. The latest recorded permit activity at 1301 2ND Ave S is dated Apr 6, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 1301 2ND Ave S in the PropertyLabs platform, along with alerts when new permits are filed at this address.
FoodBev
FoodBev
ComMFDRR
ComMFDRR
Remodel
Remodel
FOOD convention center Mill City Kitchen Concessions replace 2 sinks 4 fl drains All plumbing shall be installed in accordance with the 2020 Minnesota State Plumbing Code (MSPC), C…
buildout walk-up pizza restaurant with small area of seating nearby on 1st floor. certificate of occupancy required: yes special inspections required: no const type: 1b occupancy:…
temporary water line- drain lines Booth 2712,1726
Hookup temporary water and drain lines, Monday, September 15th at 9:00 AM Booths 425 and 529, Hall C-E, Tuesday, September 16th at 9:00 AM Booths 1436 and 1142, Hall C-E
Hookup temporary to install (4) shampoo bowls, water heaters & drains. Hall A. Install: August 13th, 2025 @ 10am Disconnect August 19th, 2025 @ 8am.
remodel rooms 200 through 213. certificate of occupancy required: no const type: 1a occupancy: a3 2020 MSBC sprinklered: yes architect: brendalen #20915 Alliance architects
Replacing GRDs and all associated ductwork per approved plans.
mpls convention center replace chilled water coils
convention center. remodel concessions area 136
Demo existing ductwork and install new per remodeled layout and approved plans.
remodel concession stand #136 first floor. certificate of occupancy required: no const type: 1a occupancy: A3 2020 MSBC sprinklered: yes architect: brendalen
Replace diswasher hood and exhaust duct per drawing. If the exhaust fan needs replacement, an additional permit will be needed.
HVAC alteration, reusing existing building system and rework low pressure duct work after VAV boxes and replacing diffusers.
setup (2) 3 compartment sink with Hot and Cold in Hall A and water and drain lines. Install: Thursday October 10th at 9am Install 3 compartment sink with Hot and Cold in Hall A. In…
setup temporary 3 compartment sink with Hot and Cold in Hall B,Install: Thursday October 3rd at 8am. Removed: Wednesday October 9th 10am
temp 3 compartment sink, install 9/16 remove 9/23
Replacing steam condensate lines per approved plans.
REMODEL OF FINISHES IN CONVENTION CENTER. LEVEL 1, MEZZANINE LEVEL, AND LOWER LEVEL. (JJL) TYPE 1A CONSTRUCTION ENGINEER: MBJ - MATT SMITH #49530 ARCHITECT: ALLIANCE - CAREY BRENDA…
Hookup Temporary 3 Compartment sink with hot and cold water in Hall C/D. Install Monday 8/5 and removed Thursday 8/8.
Hookup Temporary 3 Compartment sink with hot and cold water in Hall B. Install Wed 4/18 and removed Mon 4/22.
per email from applicant - project is to install approx. 200 new diffusers with demo of the old, installation of the new, and then test and balance the systems that are affected.
New ceiling diffusers and branch ductwork per approved plans.
Exhibit Halls A-D - Remove and replace doors certificate of occupancy required: no special inspections required: no occupancy: A-3 2020 MSBC sprinklered: yes architect: Carey Brend…
MEETING ROOM 103, MINNEAPOLIS CONVENTION CENTER. INTERIOR REMODEL OF MEETING ROOM 103. NEW FINISHES, CEILING, WALLS, MECHANICAL AND ELECTRICAL UPGRADES. NO STRUCTURAL WORK. (JJL) c…
Hookup Temporary Drain line Hall C/D. Install date 10/9/23 and removal date 10/12/23
Hookup Temporary 3 compartment sink with hot and cold water in Hall CD. Hookup Aug 7th and removal Aug 9th
Ceiling and lighting upgrade project. (JJL) certificate of occupancy required: no special inspections required: no const type: IA occupancy: A3 2020 MSBC occupant load: NO CHANGE F…
acoustic ceiling replacement in corridors.
Ceiling and Lighting Upgrade in Public Corridors outside of Exhibit Hall 'E' certificate of occupancy required: no special inspections required: no occupancy: A3 2020 MSBC sprinkle…
replace waste piping in ceilings after hours
FOOD 1ST FLR CORRIDORS & MEZZANINES A-F: DIFFUSERS
(DMH-ProjectDox) REMOVE AND REPLACE (7) SEVEN EXHIBIT HALL DOUBLE DOORS AT LOBBY 'E' IN CONVENTION CENTER. Architect: KEN SHEEHAN, #43965 (ALLIIANCE APPROVED PLANS AND PERMIT MUST…
replace diffusers
EXHIBIT HALL B INSTALL 2 TEMPORARY 3 COMPARTMENT SINK WITH 2 ELECTRIC WATER HEATERS IN EXHIBIT HALL B. INSTALL JULY 19TH, REMOVAL JULY 22ND
Relocating GRDs per attached plan.
TELECOMMS EQUIPMENT - REPLACE & INSTALL ----- engineer: JOSHUA ERIC HERZOG - 42392 engineer: THOMAS LAWRENCE MACH - 42357 - "[T]he framing members have been analyzed and have been…
tearoff and reroof eastern quarter of convention center with new PVC system. scope of work and area map in attachments.
remodel existing employee dining area and tasting room on mezzanine level.
EXHIBIT HALL E HOOK UP TEMPORARY WATER LINE TO WASHING MACHINE 12/6/21 12NOON AND REMOVE 12/20/21
FOR EXHIBIT HALL C - INSTALL 3 TEMP ELEC WATER HEATERS 2 TEMP HAIR WASH STATIONS AND 1 TEMP LARGE SINK. REMOVED 9/28/21
HVAC system modification, adding new DX fan-coil and condensing unit, GRDs and all associated ductwork. Refer to attached drawings.
MAINTENANCE MODIFICATION OF TELECOMMUNICATION EQUIPMENT. VERIZON WIRELESS PROPOSES A LIKE FOR LIKE EXCHANGE OF 6 PANEL ATNETANAS AND 3 RRUS. ALL PROPOSED EQUIPMENT REMAINS WITHIN T…
IN HALL B DRIVE THRU - TEMPORARY 3 COMPARTMENT SINK FROM 2/11 - 2/13 2020
NE CORNER OF HALL
HVAC system, replacing 4 fan-coil units with new one and all associated ductwork and registers. Refer to attached drawings.
KITCHEN SINK
ADD 325 CFM EXHAUST FAN & DUCTS FOR CATERING AREA / DEMO & REDO DUCTS FOR CONFERENCE ROOM, RECEPTION AREA, BOARD ROOM ON 1ST FLOOR PER ENG. DRAWINGS
Interior non-structural remodel of 4 exhibitor services offices and First Aid room. No change to occupancy or exiting. Architect Landry #43730
Install (5/17/19) temporary 3 compartment sink in hall A
Board Room #104 - 2 sinks
SECURITY COMMAND CENTER 1ST FLOOR / 1 NEW FCU / GRD'S HVAC PER PLANS / GAS PIPING TO GENERATOR W SHUT OFF
3 EXHAUST FANS & REDO- DUCTS FOR STEAM ROOM / NO PLANS
FOR EXHIBIT HALL E/3 COMPARTMENT TEMPORARY SINK AND ELECTRIC WATER HEATER FROM MAY 1ST 10 AM - MAY 5TH 8 AM
remodel administrative boardroom certificate of occupancy required: no mechanical plans required for certificate of occupancy mechanical plans/letter of means of compliance submitt…
Final Four - Dribble Event - Entry Truss system - to cross S 12th Street on Sunday, April 7, 2019. engineer: reder
Final Four - Temporary Bleachers - Convention Center Final Four FanFest. sck#2 engineer: barrios #22451
INSTALL 3 COMPARTMENT TEMPORARY SINK WITH COLD AND HOT WATER FROM 2/12 - 2/14 2019
REPLACE STEAM / CONDENSATE / HW / CW / PIPING IN EXISTING MECHANICAL ROOM / & EXHAUST
INSTALL 400 LINEAL FEET OF DOMESTIC WATER PIPING
FOR REMODELING IN EXHIBIT HALL E - CONNECT 3 SINKS
kitchen equipment
Kitchen Exhaust Hood/Duct Replacement & Associated Ceiling Work certificate of occupancy required: no special inspections required: no sprinklered: yes architect: Luken Architectur…
Exhibit Hall D Engal booth 1037 Hook up 1 Temp water line and drain
FOR EXHIBIT HALL E - HOOK UP TEMPORARY CLEAN UP SINK WITH WATER LINE AND DRAIN
Reroute copper water piping for icemaker
4 temp water heaters for Aveda display
Replace grease duct
Replace 2 gas water heaters
FOR CLEAN UP SINK IN EXHIBIT HALL D AND E - INSTALL 2 TEMPORARY WATER LINES AND DRAINS
INSTALL TWO SMALLER WATER HEATERS REMOVE ONE EXISTING LARGER WATER HEATER
FOR HALL B - 3 COMPARTMENT HANDWASHING TEMPORARY SINK 8/14 - 8/16 2018
restrooms
RESTROOM UPDATES certificate of occupancy required: no special inspections required: no const type: 1-A occupancy: A-3 2015 MSBC sprinklered: yes sac: not required met council lett…
FOR EXHIBIT HALL B - INSTALL TEMPORARY CLEAN UP SINK FROM 2/20/18 - 2/21/18
Super Bowl Temp Structure Verizon at Convention Center Temporary Jet Tent structure for Verizon activation outside Convention Center - structure is 33' wide and 17' deep Must have…
exhibit hall B and C
REPLACE 44 DRINKING FOUNTAINS WITH FOUNTAINS AND BOTTLE FILLERS
coredrilling related to installation of fiber conduit from exterior of building. sck#2