Building permit intelligence · Minneapolis, MN
819 2ND Ave S has 12 municipal building permits on file in Downtown West. The latest recorded activity was a mechanical permit dated Mar 24, 2026. Permits at this address represent $5MM–$25MM in total declared construction value. PropertyLabs also identified 4 mapped permits within 500 m of this address.
his is a 72-unit multi-family 8-story heat pump remodel/Addition. There will be 2 DOAS units: 1 with 4,800 CFM, 30 tons, and 576 MBH, and one with 3,100 CFM, 21 tons, and 330 MBH.…
ANTENNAS ON BUILDING Rated Exit Stair Enclosures are not allowed as a raceway for any of the installation 2020 Minnesota State Building Code
ComMaj
Temp heating for construction - (8) heaters used: (2) 1.5m btu, (6) 500K btu
Renovation of existing 8 story apartment building including an 8 story addition. Total new apartments will be 72 -ACW certificate of occupancy required yes mechanical plans require…
4 mapped permits within 500 m, shown on the intelligence map above.
7 other addresses on 2ND Ave S with municipal permit records in Minneapolis.
This address has 12 permit records in PropertyLabs' public history and is located in Downtown West. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 29, 2026.
PropertyLabs compiled this permit history from municipal public records for Minneapolis, MN. The latest recorded permit activity at 819 2ND Ave S is dated Mar 24, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 819 2ND Ave S in the PropertyLabs platform, along with alerts when new permits are filed at this address.
swap out rooftop telecommunications equipment. engineer: jiang #54790
TELECOMMS EQUIPMENT - INSTALL/ADD ---- ST OLAF ----- engineer: THOMAS LAWRENCE MACH - 42357 "[T]he framing members... have been found to have SUFFICIENT CAPACITY to support the pro…
Maintenance modification of telecommunications equipment. Remove and replace antennas, cables, and RRUs. Mounts will be re-used. ______ Maintain fire-caulking/fire-rating at any pe…
Remove equipment. Install equipment. ______ Maintain fire-caulking/fire-rating at any penetrations. ______ See engineer's letter from Herzog Engineering dated 11/1/19; recommendati…
GAS FOR 923,000 BTU GENERATOR
CONCRETE PAD EXTENSION FOR NEW GENERATOR REPLACMENT
REPLACE 3 ANTENNAS & ADD TELECOMMUNICATIONS EQUIPT ENGINEER IS ROBLEY E EVANS LICENSE #43119 Replace 3 antennas to same size and location. add/replace support equip. Subject to con…