Building permit intelligence · Boston, MA
15 Channel Center St has 60 municipal building permits on file in Ward 6. The latest recorded activity was a chgocc permit dated Jun 12, 2026. Permits at this address represent $1MM–$5MM in total declared construction value. PropertyLabs also identified 2 mapped permits within 500 m of this address.
Change Occupancy
Change Occupancy
Low Voltage
Plumbing
Plumbing
Change Occupancy
2 mapped permits within 500 m, shown on the intelligence map above.
5 other addresses on Channel Center St with municipal permit records in Boston.
This address has 60 permit records in PropertyLabs' public history and is located in Ward 6. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 15 Channel Center St is dated Jun 12, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 15 Channel Center St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Plumbing
Fire Alarm
Electrical
Renovations - Exterior
Renovations - Interior NSC
Temporary Service
There is NO WORK being performed. Adding a occupancy group to existing occupancy of the building. Owner has been using the space for events with temp certs and has been ask by ISD…
Renovations - Interior NSC
Demolition - Interior
Renovations - Exterior
Renovations - Exterior
Other
Renovations - Exterior
Repair/repoint exterior masonry wall (parking lot)
Relocate switches and exit sign; add switches and exit sign at new door location.
Change existing front door, add conference room door, install glass panels on existing wall, minor relocation of electrical outlets as needed
Install tectum acoustical panels on ceiling
Construct interior drywall partition and associated finishes.
Existing power & lighting upgrades in expanded office space: add 6 data/power outlets, remove/replace 20 fixtures with new LEDs, all on existing circuits
The Fight Club. Gas water heater.
The Fight Clyb. Gas Water Heater
Supply & install (20) 8ft Florescent fixtures relocate (6) outlets and (6) switches Install (20) data outlets
Fit out existing office space. New lighting, flooring, cabinets and paint. Interior work only
Install security system
Change in material of issued;awning per Historic Fort Point Channel District as previously approved by BRA; to comply with 780 CMR 3202 Projection not to exceedingly project 2/3 of…
Install new electric meter to divide tenant space power
Remove interior drywall partition walls, remove acoustical ceiling tiles, remove existing carpet.
Install washer and dryer receptacles
SECURITY SYSTEM
Install Burglar Alarm 14 devices
Change Occupancy include juicebar in Fitness Center.; Fitout juice bar, new partition wall, lighting, plumbing for sinks.
"The CLUB by George Foreman III" signage BRA approved;: Install 20" x 89" x 36" deep awning over entrance on front building elevation; works to be done by CS D.Glispin of Sunshine…
New Fire Alarm Devices being tied into an existing FA System at 15 Channel Center for Tenant Fight Club Boston
Install wall panels on existing interior walls
Installation of lighting and power in an existing space
Change Occupancy from;a Theatre Use to a Fitness Center and Gymnasium Use;with Retail and Gallery uses (and retain other current uses (89 apartments, studios, offices, cafe, garage…
Proposed Work: Include function room into occupancy - twelve hundred person capacity, Last Action: READY TO ISSUE
Demolition of 3 inetrior partitions, relocate one existing door, construct new partitions,paint throughout, install new sink and new lights & receptacles
cut and point mortar joints, install clear sealer, replace damaged bricks
Install metal hold down straps on existing skylight. Work is not visable from any street. Drawing from Engineer submitted with permit application
Spot point brick Repair sill
Install power and data for 12 office cubicles and 2 plotters ,2 appliance circuits
Remove and replace existing kitchen sink
Relocation of interior partitions.
Replace damaged feed for trash compactor
build out temporary offices 3mo.
repair to brick repair granite caulking
Install lighting and power.
Furnish and Install Plumbing.
Electrical fit out for light industrial space with offices
Non-structual demo, refinish wood floors, new drywall walls, HVAC and electrical improvements, concrete floor infill, paint, glass storefronts for offices.
Non-structural demo,wood floor decking, floor underlayment, new drywall walls, new finishes, misc. HVAC and electrical improvements, some new fire protection.
installation of 2 check valves 6"
Install new 100A meter and feeder for ceramic kiln.