Building permit intelligence · Boston, MA
154-158 Harvard Av has 11 municipal building permits on file in Ward 21. The latest recorded activity was a electrical fire alarms permit dated Jul 1, 2026. Permits at this address represent $500K–$1MM in total declared construction value. PropertyLabs also identified 1 mapped permit within 2 km of this address.
IN CONJUNCTION WITH PROJECT AT 156 HARVARD AVE ( ALT1651054) Modify existing fire alarm(s) to combine 2 systems into 1 within 156 Harvard Ave with remote ann-80 annuciators at entr…
Provide for alteration of existing fire alarms, to provide code complaint notification throughout building and make modifications associated with ALT1651054
install a new light box and new awning to the wall, and existing double sides lightbox refacing.
In conjunction with project at 156 Harvard Ave ( alt1651054 ) . Modify existing fire alarm in space to accomidate and combine with 154 Harvard Ave which is part of the same structu…
POS internet Wifi cable and CCTV cabing.
1 mapped permit within 2 km, shown on the intelligence map above.
12 other addresses on Harvard Av with municipal permit records in Boston.
This address has 11 permit records in PropertyLabs' public history and is located in Ward 21. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 154-158 Harvard Av is dated Jul 1, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 154-158 Harvard Av in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Install cook stove deep fayer
Install bathroom kitchen sink
Electrical wiring throughtout Dinning room and kitchen only, second floor to be remain ( NO—WORK).
Renovation of a Thai Restaurant work at 156 Harvard Ave Allston New install ceiling, wall, and floors, install new kitchen equipment per design plan.
Install 15 teporary light and 5- 110/voltage electric outlet for demolition company.
Work at 156 Harvard Ave Allston. Interior demolition, remove existing bathroom, non structural partition walls for first floor and basement, remove existing hard wood floor, rollin…