Building permit intelligence · Boston, MA
167 Marlborough St has 31 municipal building permits on file in Ward 5. The latest recorded activity was a extren permit dated Jun 3, 2026. Permits at this address represent $1MM–$5MM in total declared construction value. PropertyLabs also identified 2 mapped permits within 500 m of this address.
Renovations - Exterior
Renovations - Exterior
Other
Other
Electrical
Plumbing
2 mapped permits within 500 m, shown on the intelligence map above.
12 other addresses on Marlborough St with municipal permit records in Boston.
This address has 31 permit records in PropertyLabs' public history and is located in Ward 5. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 167 Marlborough St is dated Jun 3, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 167 Marlborough St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Demolition - Interior
Renovations - Exterior
Install new shower valve and drain. Finish trim also to be installed.
Wire new work one bathroom.
Master bathroom reno
Renovate/update existing bathroom; fixtures to remain in existing locations.
Three Family Dwelling COO for Unit #1 Alt573785 issued 5/31/2016 &; SF568473 issued 3/4/2016
Renovate #1
Gas piping for one boiler, two fireplaces, and a gas range
2 level condo. 3 full baths, one half bath
This is a permit change due to a change in master plumber Permit fee and scope reflected in previous plumbing permit
This is a permit change due to a change in master plumber Permit fee and scope reflected in previous plumbing permit
Install Fire alarm systems to common area and new lower 2 floors of the condo
Gas piping for one boiler, two fireplaces, and a gas range
Low Voltage Wiring for Audio Video - work on floors 1-3
Rewire kitchen new work.
Change Occupancy from;4 Res Units to;3 Res Units by removing existing mud mat and replace in kind - Demo one flight of stairs from unit 1 to unit 2. Infill floor joists at this loc…
Remove existing kitchen cabinetry, replace kitchen cabinetry in same footprint as existing.
Lower Unit: Drywall demo to the ceiling strapping and wall studs. Strip Hardwood flooring
Unit #3, Bathroom remodel, hallway remodel.
Installing 2 sinks toilet shower
Renovate master bathroom bedroom and dressing room and laundry.
Emergency repairs to chimney that has loose brick ready to fall. We will reset and repoint as needed.
reparing slate and reparing gutters instaling flashing
Add on to existing burglar system.