Building permit intelligence · Boston, MA
225 Marlborough St has 21 municipal building permits on file in Ward 5. The latest recorded activity was a extren permit dated May 28, 2026. Permits at this address represent $5MM–$25MM in total declared construction value. PropertyLabs also identified 2 mapped permits within 500 m of this address.
Renovations - Exterior
Renovations - Exterior
Renovations - Exterior
Renovations - Exterior
Interior/Exterior Work
Single Family Dwelling COO for Single Family Dwelling Alt23711 issued 1/30/2013, A344346 issued 3/27/2014, SF365284 issued 5/21/2014, SF38284 issued 8/13/2010, SF49603 issued 11/1/…
2 mapped permits within 500 m, shown on the intelligence map above.
12 other addresses on Marlborough St with municipal permit records in Boston.
This address has 21 permit records in PropertyLabs' public history and is located in Ward 5. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 225 Marlborough St is dated May 28, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 225 Marlborough St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Cost and work to be completed after permit ALT23711 is closed. This work was previously part of that permit. - Glass rails at roof deck - Tile at basement stair landing - Tile in l…
Removal of optional magnetic holders from first floor 1 hour rated fire doors with automatic closers.
networking and AV
Fire and Low voltage
Complete renovation of structure.
Selective demplitiono, new windows at basement elevation - south and west west elevations only, new elevator,new utilities, new Mechanicals, new finishes throughout, add roof deck…
Townhouse remodel.
Gas piping to boiler, dryer, range and grille.
Connect temporary job heater.
Remodel kitchen , laundry And five baths.
Gas piping for Boiler stove and grill
Continuation of short form permits #SF38284 and SF49603 and the filing of long form permit #ALT23711 which has been approved under Article 32 and waiting for final letter from ZBA…
Alarm system - low voltage.
Continuation of short form permit #SF38284 and the filing of long permit #ALT23711 which is pending Article 32,ZBA approval hearing date, scheduled for November 23, 2010. Continuat…
Selective demolition of interior space, which includes 6 floors. Selective work on North and South elevations of the building, minor framing and new rough in portion for MEP's.; no…