1717 S J St

Building permit intelligence · Tacoma, WA

158 at this address2 nearby within 500 m
At this address
158
Nearby (500 m)
2
Latest activity
Jul 17, 2026
Total permitted value
$39M

Permit history for 1717 S J St

  1. BuildingPermit IssuedProject value hiddenJul 17, 2026

    Alteration of unoccupied suite within St Joseph Medical center to become a 16-chair infusion center. Plumbing drawings have been reviewed under the approved building permit BLDCA26…

  2. BuildingPermit IssuedProject value hiddenJul 2, 2026

    Alteration of an unoccupied suite within St. Joseph Medical Center to become a 16-chair infusion center. Mechanical scope includes moving 6 existing diffusers by less than 10 feet…

  3. BuildingPermit IssuedProject value hiddenJun 16, 2026

    Alteration of an unoccupied suite within St. Joseph Medical Center to become a 16-chair infusion center. Scope to include demolition of non-bearing walls, casework, and finishes. N…

  4. BuildingPermit IssuedProject value hiddenJun 15, 2026

    Modifying existing overhead fire sprinkler system to accommodate new tenant walls & ceilings.

  5. BuildingPermit IssuedProject value hiddenJun 11, 2026

    The project consists of two separate interior spaces: 1. An interior remodel of existing Operating Room 3 and converting into a Hybrid Operating room including a new control room,…

  6. BuildingPermit IssuedProject value hiddenJun 11, 2026

    Demo and relocation of ducts and grilles for the installation of a new clean suite (by others) in each space. at MEDICAL OFFICES

  7. BuildingPermit IssuedProject value hiddenJun 11, 2026

    Demo and relocation/reconnection of existing medical gas piping. Installation of new medical gas outlets. Relocation of (1) existing hand sink.

  8. BuildingPermit IssuedProject value hiddenJun 10, 2026

    Relocate sprinklers for new full height pharmacy carousel on Level 1

  9. BuildingPermit IssuedProject value hiddenApr 29, 2026

    Replacement of four pharmacy carousels and associated architectural and electrical work to accommodate new equipment at St.Joseph's Hospital.

  10. BuildingPermit IssuedProject value hiddenMar 10, 2026

    Scope to include demolition of non-bearing walls, casework, fixtures, and finishes at St. Joseph's Hospital. Work is in correlation to separate tenant improvement permit.

  11. BuildingFinaledProject value hiddenFeb 28, 2025

    Replace existing chiller with new Carrier air-cooled chiller on roof of central plant. ** Field Revision Approved.07.24.2025. Suction strainer removed, suction elbow replaced by a…

  12. BuildingFinaledProject value hiddenJan 27, 2025

    Plumbing scope associated with Tenant Improvement project that creates Ante/Postpartum Patient Rooms on two existing floors at the St. Joseph Medical Center.

  13. BuildingFinaledProject value hiddenJan 27, 2025

    Mechanical scope associated with Tenant Improvement project that creates Ante/Postpartum Patient Rooms on two existing floors at the St. Joseph Medical Center.

  14. BuildingFinal InspectionProject value hiddenJan 27, 2025

    TI to create Ante/Postpartum Patient Rooms on two existing floors at the SJMC. Level 11 A Quad scope of work includes 8 new patient rooms and clinical support areas. Level 12 A Qua…

  15. BuildingFinaledProject value hiddenJan 10, 2025

    11th & 12th Floor TI: adding smoke coverage for new patient rooms and audibility and strobe coverage in common areas.

  16. Right-of-WayPermit IssuedProject value hiddenNov 5, 2024

    48ct Fiber - 161' pulled through existing conduit

  17. BuildingFinaledProject value hiddenOct 17, 2024

    Adding 2 New Speaker Strobes at commercial building

  18. BuildingFinaledProject value hiddenAug 7, 2024

    ADD AND RELOCATE REQUIRED SPRINKLERS FOR NEW CEILING AND WALL LOCATIONS.

  19. BuildingFinaledProject value hiddenJun 7, 2024

    Tenant Improvement to modify an existing waiting area on Level 06 of the SJMC tower to create new office space for five (5) Medical Residents currently working on the floor. Existi…

  20. Right-of-WayClosedProject value hiddenJun 3, 2024

    Set up 60 ton boom truck for two hours to lift a heating/air conditioning unit to the roof for install. Omega Morgan working for PSF Mechanical. Work, including set up and dismantl…

  21. BuildingFinaledProject value hiddenMay 30, 2024

    Add 2 and relocate 48 pendent sprinklers for new wall layout and ceiling elevations.

  22. Right-of-WayClosedProject value hiddenMar 15, 2024

    Testing of Fire Pump.

  23. Right-of-WayClosedProject value hiddenFeb 22, 2024

    CRANE WORK FOR REMOVE/REPLACE OF HVAC ON ACUTE CARE BLDG

  24. Right-of-WayClosedProject value hiddenSep 22, 2023

    A 3rd party contactor will be performing site work on the ER entrance lid requiring foot traffic to enter from another side of the building. Reserve some on street parking for emer…

  25. BuildingFinaledProject value hiddenSep 20, 2023

    This project is a Level 2 alteration that modifies an existing Multi-Disciplinary Rounding Room to create a new Family Lounge to serve the 4th Floor of the South Pavilion. Scope of…

  26. BuildingFinaledProject value hiddenSep 20, 2023

    This project is a Level 2 alteration that modifies an existing Multi-Disciplinary Rounding Room to create a new Family Lounge to serve the 4th Floor of the South Pavilion. Scope of…

  27. BuildingFinaledProject value hiddenSep 14, 2023

    Adding a SpeakerStrobe and Smoke Detector to a room that has been divided into two spaces.

  28. BuildingFinaledProject value hiddenSep 14, 2023

    Modify existing fire sprinkler system to accommodate new wall and ceiling layout. Add and relocate heads in new ceiling.

  29. BuildingFinal InspectionProject value hiddenJun 29, 2023

    Renovation of a portion of Level G at the St Joseph Medical Center to create new meeting rooms, offices and support areas for Graduate Students and Medical Residents. The Existing…

  30. BuildingFinaledProject value hiddenJun 16, 2023

    Like-for-like replacement of two custom air handling units serving the level 5 floorplate.

  31. BuildingFinaledProject value hiddenJun 7, 2023

    Renovation of a portion of Level G at the St Joseph Medical Center. This project creates new meeting rooms, offices and support areas for Graduate Students and Medical Residents. T…

  32. BuildingFinaledProject value hiddenJun 7, 2023

    Small TI on level G, adding new SpeakerStrobe and Smokes to TI space

  33. Right-of-WayClosedProject value hiddenJun 6, 2023

    Lane closure related to fire sprinkler upgrades.

  34. BuildingFinaledProject value hiddenMay 23, 2023

    RELOCATE ADD 13 QR PENDENTS TO NEW CLASSROOM SPACES.

  35. Right-of-WayClosedProject value hiddenMay 16, 2023

    Installing blackout film on the two skybridges using two boom lifts to access. Includes 1 day barricade per approved TCP.

  36. BuildingFinaledProject value hiddenMay 8, 2023

    Renovation of a portion of Level G at the St Joseph Medical Center to create new meeting rooms, offices and support areas for Graduate Students and Medical Residents. The Existing…

  37. Right-of-WayClosedProject value hiddenApr 21, 2023

    Annual testing of the fire pumps flowing from the roof

  38. BuildingFinaledProject value hiddenApr 4, 2023

    This permit covers the Plumbing scope associated with the renovation and expansion of an existing Catheterization Laboratory Preparation and Recovery suite. Main permit # is BLDCA2…

  39. BuildingFinaledProject value hiddenApr 4, 2023

    This permit covers the Mechanical scope associated with the renovation and expansion of an existing Catheterization Laboratory Preparation and Recovery suite. Main permit # is BLDC…

  40. BuildingPermit IssuedProject value hiddenApr 4, 2023

    Renovation and expansion of an existing Catheterization Laboratory Preparation and Recovery suite. Project scope includes the addition of 7 Phase II bays, a Treatment Room, Clean a…

  41. BuildingFinaledProject value hiddenApr 3, 2023

    Modify existing fire sprinkler system to accommodate new wall and ceiling layout. AddRelocate (90) heads in new ceiling.

  42. BuildingFinaledProject value hiddenJan 31, 2023

    install a 2 hour fire rated soffit around pipe in stairwell. Mechanical scope will require a separate permit

  43. BuildingFinaledProject value hiddenDec 7, 2022

    This permit covers the Mechanical scope associated with the renovationconversion of half (9,923 SF) of an Existing Administration Floor (B Occupancy) into 14 new Patient Rooms (I-2…

  44. BuildingFinaledProject value hiddenDec 7, 2022

    This permit covers the Plumbing scope associated with the renovationconversion of half (9,923 SF) of an Existing Administration Floor (B Occupancy) into 14 new Patient Rooms (I-2 O…

  45. BuildingFinaledProject value hiddenOct 12, 2022

    RELOCATE 22 PENDENT SPRINKLERS, ADD 17 NEW PENDENT SPRINKLERS TO CONFORM WITH TENANT IMPROVEMENT.

  46. BuildingFinaledProject value hiddenSep 23, 2022

    Replacement of existing CT scanner within existing room on 1st floor at St Joes Medical Center.

  47. BuildingFinaledProject value hiddenSep 21, 2022

    Mechanical scope associated with the conversion of existing Orthopedic Treatment and Rehabilitation areas on Level 4 of the SJMC South Pavilion into new MedicalSurgical Patient Car…

  48. BuildingFinaledProject value hiddenSep 21, 2022

    Plumbing scope associated with the conversion of existing Orthopedic Treatment and Rehabilitation areas on Level 4 of the SJMC South Pavilion into new MedicalSurgical Patient Care…

  49. BuildingFinaledProject value hiddenSep 14, 2022

    Modify Existing Fire Sprinkler System

  50. BuildingPermit IssuedProject value hiddenSep 13, 2022

    Revise existing seismic bracing in the St. Jospephs Medical Center, South Pavilion building to allow for additional patient beds on the 4th and 5th Floors. Scope of work includes r…

  51. BuildingFinaledProject value hiddenSep 8, 2022

    Install one Emergency Oxygen Supply connection on outside of building. Connect new EOSC to existing 1 1/2" oxygen line to existing services.

  52. BuildingFinaledProject value hiddenAug 31, 2022

    Mechanical work associated with the renovation of existing portions of St. Joseph Medical Center Level G, including existing business area to create new Office space.

  53. BuildingFinaledProject value hiddenAug 23, 2022

    Level 5 alteration (per IBC) Converting half (9,923 SF) of an Existing Administration Floor (B Occupancy) into 14 new Patient Rooms (I-2 Occupancy), 1 bed per room, to serve as a m…

  54. Right-of-WayRevisions ApprovedProject value hiddenAug 23, 2022

    110T Crane to remove and replace a rooftop cooling tower located at 1717 South J Street, in Tacoma. Work to be performed on Thursday, August 25th, between the hours of 0800 and 170…

  55. BuildingPermit IssuedProject value hiddenAug 18, 2022

    Replacement of fan coil and controls in room T1306 at SJMC.

  56. BuildingFinaledProject value hiddenAug 17, 2022

    South Pavilion 4th floor Acute remodel. Adding Detection, Audibility to remodel space

  57. Right-of-WayPermit IssuedProject value hiddenJul 22, 2022

    Painting curbs and crosswalks

  58. BuildingFinaledProject value hiddenJul 22, 2022

    Mechanical scope associated with BLDCA22-0044.

  59. BuildingFinaledProject value hiddenJul 19, 2022

    This project is an alteration of a portion of a former Hyperbaric Medicine Support Area in order to create new space for Employee Health Offices. Architectural Scope has already be…

  60. Right-of-WayPermit IssuedProject value hiddenJun 3, 2022

    Full flow of the fire pumps.1 day June 4, 2022

  61. BuildingFinaledProject value hiddenMay 23, 2022

    Level 2 Alteration (per IEBC) converting existing Orthopedic Treatment and Rehabilitation areas into new MedicalSurgical Patient Care Units and support areas. The work includes new…

  62. Right-of-WayPermit IssuedProject value hiddenMay 10, 2022

    Annual testing of the fire pump using fire hoses to flow from the roof.

  63. BuildingFinaledProject value hiddenApr 12, 2022

    ALTERATION OF PORTION OF LEVEL G, AT ST JOSEPHS MEDICAL CTR, INCLLUDING EXISTING HYPERGARIC MEDICINE SUPORT AREA TO CREATE NEW SPACE FOR EMPLOYEE HEALTH OFFICES. NOTE: APPROVED MEC…

  64. Right-of-WayPermit IssuedProject value hiddenMar 8, 2022

    Barricade for boom lift placements to remove and replace graphics at the Sky Bridges on J Street and I Street at CHI Franciscan - St. Joes Hospital. As per approved TCP (314-317 an…

  65. BuildingFinaledProject value hiddenMar 3, 2022

    Fire sprinkler TI; Addrelocate 11 sprinkler heads for the Level G Health area remodel. No change to hydraulic calcs.

  66. BuildingFinaledProject value hiddenDec 17, 2021

    Tee off of existing medical air line on 14th floor. Furnish and install two medical air ceiling outlets on LD1 and LD2. Furnish and install two medical air zone valve boxes for LD1…

  67. Right-of-WayPermit IssuedProject value hiddenOct 8, 2021

    Using mobile crane to aid in HVAC work at 1717 South J Street Tacoma WA 98045. will need to reserve parking, close sidewalk, and south J st for 6 hours

  68. BuildingFinaledProject value hiddenApr 7, 2021

    Replace 10 backflow assembly, part of the fire sprinkler system at St. Josephs Hospital.

  69. BuildingFinaledProject value hiddenFeb 10, 2021

    Replace 6 ton heat pump with new at commercial hospital St Joseph. New unit within 10% weight of old unit.

  70. BuildingExpiredProject value hiddenJan 8, 2021

    Temporarily placing a 8 x 24 modular office on the parking lot next to the ER entrance to create additional ER patient waiting andor triage space inside, while moving the valet par…

  71. BuildingFinaledProject value hiddenDec 30, 2020

    Renovation of one (1) existing storage room to accommodate a storage room and break room of approximately 468 square feet.

  72. BuildingFinaledProject value hiddenOct 26, 2020

    Tenant Improvement involving the installation of New Med. Gas Outlets. 9799-001

  73. BuildingFinaledProject value hiddenOct 26, 2020

    Tenant Improvement involving the addition of one humidifier in AC-1. 9150-001

  74. BuildingFinaledProject value hiddenOct 26, 2020

    Tenant Improvement involving the installation of one water supply to humidifier. 9150-001

  75. BuildingFinaledProject value hiddenOct 6, 2020

    ADDRELOCATE FIRE SPRINKLERS FOR T.I. WALLS & CEILINGS AT COMMERCIAL LOCATION FOR ST JOES MEDICAL CENTER.

  76. BuildingFinaledProject value hiddenSep 21, 2020

    T-Mobile is proposing to replace (6) existing antennas with (6) new antennas, (12) RRUs with (6) new RRUs, (3) Hybrid cables with (3) new hybrid cables, (6) COVPs with (6) new junc…

  77. BuildingFinaledProject value hiddenSep 11, 2020

    Commercial Tenant Improvement at St. Joseph Medical Center involving the installation of new exhaust fan, grilles and associated ductwork. 9634-001

  78. BuildingFinaledProject value hiddenSep 11, 2020

    Tenant Improvement involving the installation of one sink and eye wash station. 9634-001

  79. BuildingFinaledProject value hiddenSep 8, 2020

    ADD 2 SMOKE DETS AND RELOCATE 3 EXISTING SPEAKERSTROBES IN LAB AREA

  80. BuildingFinaledProject value hiddenAug 24, 2020

    Remove and replace mechanical units for patient room exhaust at St. Joseph Medical Center.

  81. BuildingFinaledProject value hiddenJul 16, 2020

    ADD FIRE ALARM MONITORING RADIO

  82. BuildingFinaledProject value hiddenJun 18, 2020

    TI on level 12 of the St. Joseph Medical Center Patient Tower.Convert 16 existing patient rooms into 15 NICU rooms and a staff lounge. An existing nurse station zone will be conver…

  83. BuildingFinaledProject value hiddenJun 12, 2020

    Add NAC panels, Relays, Pull Stations, Smoke Dets, Audible Bases, Annunciators to Floor 12 t.i. spaces.

  84. BuildingFinaledProject value hiddenMay 28, 2020

    Fire Sprinkler TI; add and relocate ssps for new remodel for the NICU on the 12th floor. 13 sprinkler heads total.

  85. BuildingFinaledProject value hiddenMay 6, 2020

    This project is a Tenant improvement of an existing Postpartum Care floor to become a Neonatal Intensive Care Unit (NICU) Floor (Level 2 Alteration per IEBC). Main Building Permit…

  86. Right-of-WayPermit IssuedProject value hiddenMay 1, 2020

    Barricade of street for Fire Pump Testing 5220

  87. BuildingFinaledProject value hiddenApr 3, 2020

    Replacement of existing water tanks with 2 new 200 gal. domestic water storage tanks and 2 new N+1 redundant semi-instantaneous domestic water heaters.. 118496-001

  88. BuildingFinaledProject value hiddenFeb 3, 2020

    Install new 4” Waste piping (including connection to existing riser) on Level 10. Install new 2” V, CW, HW and HWC piping (including connection to existing riser) on Level 11. Incl…

  89. BuildingFinaledProject value hiddenJan 29, 2020

    Remodel of the fire alarm system on the 11th floor

  90. ePermitFinaledProject value hiddenJan 22, 2020

    Add (1) sprinkler head. demo (1) sprinkler head, and relocate 3 existing heads to accommodate the new TI.

  91. BuildingFinaledProject value hiddenJan 13, 2020

    Install new exhaust duct to serve new soiled utility room - to be connected to existing exhaust riser located in existing chase. Install one new fire damper where the new duct pass…

  92. BuildingFinaledProject value hiddenJan 6, 2020

    TI (level 2 alteration per iebc) within 3 quads and the core of level 11 in the patient tower. The inpatient postpartum care unit will convert 22 existing behavioral health rooms o…

  93. BuildingFinaledProject value hiddenDec 26, 2019

    Relocate (1) grille and add 5 feet of associated duct-work.

  94. Right-of-WayExpiredProject value hiddenSep 24, 2019

    Access MH 582 and MH 634 to place and splice new fiber into existing conduit. No soft or hard surface disturbance. (see related previous permit RUTI19-0420) Includes 1 day barricad…

  95. Right-of-WayPermit IssuedProject value hiddenJul 22, 2019

    Tree pruning in the ROW. UPDATED: Approved for 092519 Originally Approved for 0826-08272019.

  96. Right-of-WayPermit IssuedProject value hiddenJun 14, 2019

    1 day barricade on Saturday, June 15, 2019, to replace window at St. Joseph on I street side per approved TCP.

  97. BuildingFinaledProject value hiddenJun 13, 2019

    Adjust sprinklers for removal of existing ceiling.

  98. Right-of-WayPermit IssuedProject value hiddenMay 31, 2019

    Barricade to add window perf to both sides of the S J st sky bridge and also adding window perf to the S I st sky bridge. Shut down of one side of the street will be required at a…

  99. BuildingFinaledProject value hiddenMay 15, 2019

    TI Fire alarm project in EP Lab. Relocating Smokes & Strobes and adding A smoke and Relays for FSD protection.

  100. Right-of-WayPermit IssuedProject value hiddenMay 1, 2019

    Road closure on 542019 3am to 7am for fire pump testing. NO PARKING signs shall be placed at least 24 hours in advance.

  101. BuildingFinaledProject value hiddenApr 25, 2019

    T-Mobile is proposing to remove all lowband antennas (3). Install 1 Octoport (FFHH-65B-R3) antenna per sector (3 total), installed in the center position. Replace 3 FRLB with 3 AHL…

  102. BuildingFinaledProject value hiddenApr 12, 2019

    Plumbing work to support the renovation of the EP procedure room at St. Joseph Medical Center. Includes sink, lavatory, mop sink, floor drain, and the installation of a bedpan wash…

  103. BuildingFinal InspectionProject value hiddenApr 12, 2019

    Mechanical work per plans to support the renovation of the EP procedure room at St. Joseph Medical Center. Previously approved under building permit BLDCA18-0437. 12192019 Revised…

  104. Utility ConnectionFinaledProject value hiddenMar 25, 2019

    Repair 6 fire supply line. Emergency repair. Place in test and notify all parties per SOP.

  105. BuildingFinaledProject value hiddenMar 25, 2019

    Relocation of less than 6 sprinkler heads on the 14th floor of St. Josephs Medical Center.

  106. BuildingFinaledProject value hiddenMar 11, 2019

    Add and relocate sprinklers for TI walls and ceilings at SJMC EP Lab TI.

  107. BuildingFinaledProject value hiddenJan 31, 2019

    Installation of eight (8) patient lifts to the 3rd floor and upgrades to three (3) existing patient lifts to electronic. Then installation of eight (8) patient lifts to the 7th flo…

  108. BuildingFinaledProject value hiddenJan 25, 2019

    Replace AC-5 per plan in Mechanical room of St. Josephs Medical Center.

  109. BuildingFinaledProject value hiddenDec 11, 2018

    Replacement of (18) sinks like-for-like on the 14th Floor.

  110. Right-of-WayPermit IssuedProject value hiddenDec 4, 2018

    Two day barricade to block parking spaces for window maintenance. Per approved TCP, barricade on 120818 and 121518 from 7am - 6pm.

  111. BuildingFinal InspectionProject value hiddenNov 27, 2018

    On the 14th floor of the CHI St Joseph Medical Center two patient lifts will be added to two different patient rooms.

  112. BuildingFinaledProject value hiddenNov 20, 2018

    Interior renovation of existing spaces to create one EP procedure room (utilizing xray imaging equipment) and its associated control room. The immediate spaces affected (including…

  113. BuildingFinaledProject value hiddenNov 8, 2018

    Addition of new HVAC cooling units to serve existing server space due to addition of additional server racksloads at St. Josephs Hospital.

  114. BuildingFinaledProject value hiddenOct 2, 2018

    Demo existing supply air diffuser and install new exhaust air grille at St Joseph Hospital Commercial Building. Balance diffusers and exhaust grilles to values shown on the drawing…

  115. Right-of-WayPermit IssuedProject value hiddenSep 13, 2018

    One lane taper and sidewalk closure for window repair for one day 92718

  116. BuildingExpiredProject value hiddenJul 10, 2018

    T-Mobile is proposing to remove all lowband antennas (3), Install 1 OCTOPORT (FFHH-65B-R3) installed in the center position. Replace 3 FRLB with 3 AHLOA RRUs (remote radio units).…

  117. BuildingFinaledProject value hiddenJun 26, 2018

    Install two new sinks and one medical gas wall outlet for Triage Room improvments

  118. BuildingCert of Completion IssuedProject value hiddenJun 25, 2018

    REMOVAL REPLACEMENT OF EXISTING BI-PLANE IMAGING EQUIPMENT AND CONTROLS IN IR-1 ROOM AT ST JOSEPH MEDICAL CENTER.

  119. BuildingFinaledProject value hiddenJun 14, 2018

    Material finish remodel of 10,866 SF remodel of SJMC 14th floor LDR rooms and patient rooms and the addition of one triage station and toilet room in the existing triage room.

  120. BuildingExpiredProject value hiddenJun 6, 2018

    Parent Description: Remodel a portion of the existing first floor emergency department. Scope of work includes remodel existing security and discharge area including new ADA compli…

  121. BuildingFinaledProject value hiddenMay 8, 2018

    Replace AC-1 per plan in Mechanical room of St. Josephs Medical Center.

  122. BuildingFinal InspectionProject value hiddenMay 3, 2018

    Adding 4 smoke detectors and 2 strobes to TI Area

  123. Right-of-WayPermit IssuedProject value hiddenMay 1, 2018

    1 day barricade for fire pump testing.

  124. BuildingFinal InspectionProject value hiddenApr 23, 2018

    Remodel a portion of the existing first floor emergency department. Scope of work includes remodel existing security and discharge area including new ADA compliant counters. Finish…

  125. BuildingFinaledProject value hiddenApr 17, 2018

    Install (7) service sinks, (7) bathroom sinkLav, (1) mop sink, (1) drinking fountain, (1) ice maker, (8) dialysis box, (2) eye wash, (3) medical gas outlet & (1) medical gas system…

  126. BuildingFinaledProject value hiddenMar 26, 2018

    Mechanical units reviewed and approved under BLDCA17-0506

  127. BuildingFinal InspectionProject value hiddenMar 22, 2018

    Modify existing fire sprinkler system.

  128. BuildingFinaledProject value hiddenMar 20, 2018

    This project is to renovate former patient rooms in Quad A into new ICU patient rooms. This will include renovation of the central support core on the 5th floor to provide better s…

  129. Right-of-WayPermit IssuedProject value hiddenJan 2, 2018

    Barricade for lane closure during maintenance work on Sky Bridge at ST Joes for 2 weeks per approved TCP. (2 wks between 2818 - 3818)

  130. BuildingFinaledProject value hiddenDec 21, 2017

    Relocate sinks, install humidifiers, and one medical gas outlet.

  131. BuildingFinaledProject value hiddenNov 13, 2017

    Humidifiers and HVAC modifications associated with BLDCA17-0448

  132. Right-of-WayPermit IssuedProject value hiddenNov 3, 2017

    Barricade for 1 day for crane placement related to HVAC work at St Joes Hospital per approved TCP 112217

  133. BuildingFinaledProject value hiddenOct 31, 2017

    Adding Fire alarm detection to new Hybird OR area.

  134. BuildingCert of Completion IssuedProject value hiddenOct 30, 2017

    Remodel portion of existinr ER Dept & Radiology Dept converting some rooms to new CT room and Relocating associated equipment

  135. Right-of-WayPermit IssuedProject value hiddenOct 16, 2017

    Barricade for one day 101817 for lift placement per approved TCP.

  136. BuildingFinal InspectionProject value hiddenSep 22, 2017

    Modify existing fire sprinkler system

  137. BuildingFinaledProject value hiddenAug 23, 2017

    Add new soiled utility room to existing exhaust system, replace existing exhaust fan EF-4

  138. BuildingExpiredProject value hiddenAug 8, 2017

    Construction of additional wall heights, casework modifications, finish upgrades, patient room light upgrades. Mechanical, electrical, and plumbing work to be submitted under defer…

  139. BuildingFinaledProject value hiddenAug 8, 2017

    Replace 3 wall mount flush valve water closets with floor mount flush valve water closets. Install new flushing clinic sink.

  140. BuildingC of O IssuedProject value hiddenJul 26, 2017

    REMODELING OF EXISTING INTERIOR SPACE TO HYBRID OPERATING ROOM. RELOCATION OF EXISTING ANESTHESIOLOGIST STAFF WORK AND SLEEP ROOMS. PROJECT WORK AREA IS APPROX. 2,560 SF.

  141. BuildingFinaledProject value hiddenJun 22, 2017

    Scope of work is the replacement of an existing (failing) Medical Air Compressor with a new compressor, and associated work. New compressor is to be located in the lower level of t…

  142. BuildingFinaledProject value hiddenMay 2, 2017

    Removing and replace 2 existing plumbing fixtures on 1st floor Renial Dialysis.

  143. BuildingExpiredProject value hiddenFeb 14, 2017

    Phase 2 - Relocate new QR concealed pendent sprinklers for tenant improvement work. Sprinkler system design per NFPA 13 2013. Existing system hydraulics are not affected by relocat…

  144. BuildingExpiredProject value hiddenFeb 14, 2017

    Phase 3 - Relocate new QR concealed pendent sprinklers for tenant improvement work.

  145. BuildingExpiredProject value hiddenFeb 14, 2017

    Phase 1 - Relocate new QR concealed pendent sprinklers for tenant improvement work. Sprinkler system design per NFPA 13 2013. Existing system hydraulics are not affected by relocat…

  146. Right-of-WayPermit IssuedProject value hiddenFeb 8, 2017

    Barricade for dumpster at commercial property. 21317-3317

  147. BuildingFinaledProject value hiddenFeb 1, 2017

    Remodel ceiling in portions of Tower 1st floor & South Pavilion 1st floor at St Joseph Hospital.

  148. Right-of-WayPermit IssuedProject value hiddenOct 10, 2016

    Barricade for work on sky-bridge at St. Joseph Medical Center

  149. BuildingFinaledProject value hiddenJun 14, 2016

    Installing (1) toilet, (3) lavs and (3) sinks as part of the Tenant Improvement of the Urology Department

  150. BuildingExpiredProject value hiddenMay 5, 2016

    Add remote power supply, sync module and 5 speakerstrobes for SJMC pathology TI.

  151. BuildingFinaledProject value hiddenApr 4, 2016

    Install 2 new lavs, and relocate 4 customer supplied grossing stations. Under ground waste will be relocated. Install new backflow preventor for modified industrial cold water line…

  152. BuildingExpiredProject value hiddenMar 21, 2016

    Small TI on level G, adding new speakerstrobes, relocating smokes and speakerstrobes

  153. BuildingExpiredProject value hiddenMar 21, 2016

    MODIFY EXISTING FIRE ALARM SYSTEM FOR TI on 9th floor quad B, of St Joes Hospital adding speakerstrobes, pull stations

  154. BuildingExpiredProject value hiddenMar 17, 2016

    Modify existing fire sprinkler system for TI for St Joes Medical Center Pathology Level G

  155. Utility ConnectionPermit IssuedProject value hiddenMar 15, 2016

    Installation of grease interceptor on Sanitary Sewer line for St Joes Dishroom Renovation. (Assoc w BLD 4-258604)

  156. BuildingExpiredProject value hiddenMar 2, 2016

    MODIFY EXISTING FIRE SPRINKLER SYSTEM FOR ST JOES MEDICAL CENTER H.I.M. RENOVATION TI

  157. BuildingExpiredProject value hiddenFeb 22, 2016

    MODIFY EXISTING FIRE SPRINKLER SYSTEM FOR ST JOES MEDICAL CENTER LEVEL 9E RENOVATION add and relocate sprinklers for tenant improvement walls and ceilings

  158. Right-of-WayPermit IssuedProject value hiddenFeb 9, 2016

    Barricade 21516-31416 to remove graphics from skybridge.

Development activity near 1717 S J St

2 mapped permits within 500 m, shown on the intelligence map above.

Explore all Tacoma permits

1717 S J St in the Tacoma permit market

This address has 158 permit records in PropertyLab's public history. The city figures below provide context without changing the focus of this exact-address record.

Full Tacoma permit report
City address-linked rows
85,097
City, trailing 90 days
1,934
City, trailing 30 days
604

City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 19, 2026.

Permit questions about 1717 S J St

Are there building permits at this address?
1717 S J St has 158 municipal building permits on record, with the latest activity dated Jul 17, 2026.
What construction activity is nearby?
2 mapped permits were found within 500 m of 1717 S J St.
What is the declared permit value?
Permits recorded at 1717 S J St represent $39M in total declared construction value.

About this address record

PropertyLab compiled this permit history from municipal public records for Tacoma, WA. The latest recorded permit activity at 1717 S J St is dated Jul 17, 2026. Municipal records can be corrected or updated after publication.