Tacoma building permits

Municipal permit coverage for Tacoma, WA; only records with valid coordinates are plotted.

85,097 address-linked rows1,934 filings in the trailing 90 days30 geocoded points shown
Address-linked dataset rows
85,097

Conservative non-additive count across canonical sources.

Trailing 90-day filings
1,934

Apr 21, 2026–Jul 19, 2026, inclusive.

Latest dated row displayed
Jul 17, 2026

Most recent activity, issue, or application date in the 30-row cohort below.

Equal-window filing comparison

The trailing 30-day window recorded 604 filings from Jun 20, 2026 through Jul 19, 2026. The immediately preceding 30-day window recorded 693 filings from May 21, 2026 through Jun 19, 2026.

Change: -13%

How to read these public statistics

City permitting reference

How permitting works in Tacoma

Tacoma uses a two-step permit process: a Land Use Permit (planning/zoning) followed by a Building Permit (construction code). Both are administered by Planning & Development Services. The Washington State Building Code (WSBC, 2021 editions) governs construction; the Tacoma Municipal Code (TMC) governs land use. Critical Areas Regulations protect Commencement Bay shoreline and wetlands; SEPA review applies to threshold projects. Design Review is required in Downtown (DT) and Urban Corridor zones. Permits are submitted through the CSS (Community Service System) portal.

Read the Tacoma permit process guide