209 Martin Luther King Jr Way
Building permit intelligence · Tacoma, WA
- At this address
- 81
- Nearby (500 m)
- 7
- Latest activity
- Jul 17, 2026
- Total permitted value
- $21M
Permit history for 209 Martin Luther King Jr Way
- BuildingPermit IssuedProject value hiddenJul 17, 2026
Project scope includes: Remodel of existing Sterile Processing spaces. Adding a cart washer to the Decontamination side and reworking the layout and flow of processing. Adding an a…
- Right-of-WayPermit IssuedProject value hiddenJul 16, 2026
Remove the existing bus shelter and install the new bus shelter on the existing concrete pad. Shoulder will need to be closed for approximately 4 hours to accommodate the truck and…
- BuildingPermit IssuedProject value hiddenJun 24, 2026
Install floor sink in EQMEC 118 on level F
- BuildingPermit IssuedProject value hiddenJun 24, 2026
Modify existing sprinkler system for new tenant improvement at Commercial building.
- ePermitPermit IssuedProject value hiddenJun 8, 2026
Installation of supply pipe to built in fire suppression system inside of temporary trailer, for the hospital's use during construction.
- ePermitPermit IssuedProject value hiddenJun 3, 2026
Relocate one existing sprinkler for ceiling adjustments.
- ePermitFinaledProject value hiddenMar 20, 2026
Renovation to the PACU. Walls adjusted and moving fire alarm notification to cover areas. One new notification device from wall to ceiling mount.
- BuildingFinaledProject value hiddenMar 5, 2026
** reviewed under BLDCA25-0312** Demo 3 sinks, Replace 2 sinks
- BuildingFinal InspectionProject value hiddenFeb 11, 2026
Removal/replacement of existing casework in Staff Lounge, enlargement of Procedure Room, addition of Pre-Op holding bay, removal and replacement of sink in Soiled Utility and conve…
- BuildingFinaledProject value hiddenFeb 11, 2026
INSTALLATION OF 3 NEW TERMINAL UNITS
- Right-of-WayPermit IssuedProject value hiddenJan 7, 2026
Hoisting HVAC Equipment to the roof of Kaiser Permanente from South J Street.
- BuildingFinaledProject value hiddenNov 25, 2025
Two new duct detectors and control relays to provide AHU-6 and AHU-8 detection and shutdown. New modules to be tied into existing SLC loop. One new speaker to be installed on level…
- BuildingCancelledProject value hiddenNov 25, 2025
New duct detector and control relay for AHU-5 detection and shutdown. Will be tying into existing SLC loop.
- BuildingPermit IssuedProject value hiddenOct 30, 2025
Replace the building's chiller, add a low temperature chiller that serves the operating room and includes modifications to the HVAC serving the sterile processing department and MR…
- BuildingPermit IssuedProject value hiddenOct 29, 2025
REPLACE CHILLER, ADD A LOW TEMPERATURE CHILLER THAT SERVES THE OPERATING ROOM, AND MODIFICATIONS TO THE HVAC SERVING THE STERILE PROCESSING DEPARTMENT AND MRI AT KAISER PERMANENTE.…
- Right-of-WayPermit IssuedProject value hiddenOct 17, 2025
Hoisting HVAC equipment to the roof of Kaiser Permanente from South J Street. 2 day barricade 11/22/2025-11/23/2025
- BuildingFinal InspectionProject value hiddenSep 19, 2025
Kaiser Permanente Tacoma Medical Center will be utilizing a Temporary MRI Trailer for the duration of their MRI Replacement project. It will be located in the drive loop at the bui…
- BuildingFinaledProject value hiddenJun 6, 2025
Adding a Split-system unit to the WALAB space of the Kaiser Permanente clinic in Tacoma, WA. This will include one (1)M outdoor unit with two (2) heads inside the lab space. FLOOR:…
- BuildingFinal InspectionProject value hiddenJun 5, 2025
Replacement of lab equipment (Hematology and Chem-Immuno analyzer) and associated scope and anchorage at Kaiser Permanente Tacoma Medical Center.
- Right-of-WayClosedProject value hiddenNov 26, 2024
EXTENSION OF RUSE24-0317 For sidewalk barricade for parking access. APPROVED 30 DAY TCP, DATES: 11/23/24 - 12/2/24
- Right-of-WayClosedProject value hiddenOct 23, 2024
The intent of this project is to work on the exterior waterproofing of the Kaiser Permanent Medical Center on M.L.K. Street. Excavation on the corner of J and 3rd Street will be re…
- Right-of-WayPermit IssuedProject value hiddenOct 16, 2024
Tree replacement - Due to water infiltration maintenance issues, at and below grade waterproofing replacement is required that is impacted by the proximity of three existing trees…
- BuildingFinaledProject value hiddenOct 16, 2024
Re-locate/ re-pipe DI Water, relocate air compressor, relocate med gas & verify to parking stall. Install new scrubber sink & relocate existing anchored ultrasonic cleaner at Tacom…
- BuildingFinaledProject value hiddenOct 14, 2024
Replace equipment and modernize ASC space. Including mobile medical equipment replacement, OR flooring replacement, conversion of existing storage room to preoperative patient spac…
- Right-of-WayClosedProject value hiddenOct 10, 2024
Block off 3 parking spots for a 20 yard dumpster that will be in place till the end of November.
- Right-of-WayClosedProject value hiddenSep 25, 2024
Dumpster placement at Commercial Building. Block off 3 parking spots on the east side of J St between Division and S 3rd St Includes 7 days of barricade per approved TCP.”
- Right-of-WayClosedProject value hiddenAug 27, 2024
Utilizing a boom truck from 3rd St to hoist roofing material to the roof. Uniformed Police Officers will be placed on the east and west end of the closure. Approximate duration in…
- BuildingFinaledProject value hiddenAug 8, 2024
Remove existing Radiology Machine and replace with Newer Radiology Machine at Tacoma General Hospital. **FRC24-0180 - 09/11/2024 - APPROVED: FIELD CHANGE: ASI-1 unistrut modificati…
- BuildingFinaledProject value hiddenJul 30, 2024
Roof Recover of entire roof area with FleeceBack TPO Membrane.
- BuildingFinaledProject value hiddenJun 17, 2024
Replace one of two sewage ejector pumps and the medical vacuum pump. **FIELD REVISION APPROVED 11/22/2024 - UPDATES TO ELECTRICAL,PLUMBING AND ARCHITECTURAL DRAWINGS TO REFLECT CHA…
- BuildingFinaledProject value hiddenApr 9, 2024
New control relays for access control interface associated with access control upgrade project. One relay provided per floor in the communications room to signal to access control…
- Right-of-WayClosedProject value hiddenMay 8, 2023
Street Use Permit for temp generator ROW for use for 1-day. JOB #1015891. Generator to be located in street, plywood bridge/ramp will cover cables that cross the sidewalk. Will be…
- BuildingFinaledProject value hiddenNov 18, 2022
REPLACE CHILLED WATER COIL IN AIR HANDLER AHU-5 THAT SERVES THE AMBULATORY SURGICAL SUITE. INSTALL ELECTRIC DUCT HEATER IN SUPPLY AIR FROM AHU-5. INSTALL UPSIZED CHILLED WATER PIPI…
- Right-of-WayPermit IssuedProject value hiddenAug 3, 2022
Install (2) temporary barricades across 3rd St for 3 days starting 8082022 to remove exterior signage and concrete foundation in order to allow Sound Transit to continue constructi…
- Right-of-WayPermit IssuedProject value hiddenApr 29, 2022
Barricade permit to hold area for Parking of two (2) food trucks along street curb to provide food for medical staff. Per approved and conditioned TCP. Private event, not open to p…
- BuildingFinaledProject value hiddenDec 23, 2021
Replacement of existing CT machine with new Canon CT machine; converting existing reading room into equipment room, and remodeling existing waiting space into new reading room. Wor…
- Right-of-WayFinaledProject value hiddenMay 10, 2021
Exterior driveway improvements - related to BLDCA20-0420
- BuildingExpiredProject value hiddenMar 26, 2021
Add relocate fire sprinkler at remodeled walls and ceilings to comply with NFPA 13-2016
- BuildingFinaledProject value hiddenMar 3, 2021
Modify exiting dual duct HVAC system. Remove and replace existing diffusers. Add (3) new VAV boxes for zoning. Add exhaust fan with HEPA filter, per plan. APPROVED UNDER Building P…
- BuildingFinaledProject value hiddenFeb 4, 2021
REMOVE PLUMBING FIXTURES AND CW, HW, VENT AND WASTE BRANCH PIPING BACK TO PIPE MAINS. ADD NEW SINKS AND WATER CLOSETS. ALL NEW PLUMBING FIXTURE CW, HW VENT, AND WASTE BRANCH PIPING…
- BuildingFinaledProject value hiddenJan 19, 2021
The project contains three components: the remodel for the Hematology-Oncology clinic on the northwest of the first floor, the expansion of the Urgent Care on the southeast of the…
- BuildingFinaledProject value hiddenDec 30, 2020
Installation of (3) new steam sterilizers on Level D with (1) integral steam generator. Installation of (1) new VAV and (5) new grilles. Modifications to associated steam, steam co…
- BuildingFinaledProject value hiddenOct 14, 2020
Replacement of two electric steam boilers that serve the CPD. Boiler replacements will be like for like equipment, per plan.
- BuildingFinaledProject value hiddenOct 12, 2020
Upgrade existing simplex fire system with new EST voice fire alarm system.
- ePermitFinaledProject value hiddenOct 8, 2020
Replacing an existing head piped head with 6 drop with a new hard-piped head with 20 drop for new alcove ceiling height.
- ePermitFinaledProject value hiddenOct 7, 2020
relocating 2 sprinkler heads as part of TI.
- BuildingFinaledProject value hiddenSep 10, 2020
Provide a cooling VAV with electric heat, ductwork modifications at commercial building for Kaiser Permanente.
- BuildingFinaledProject value hiddenAug 17, 2020
Replacement of an MRI Chiller located outside in a fenced in area for a like for like chiller, no change in fencing or general footprint of the new chiller, per plan.
- Right-of-WayFinaledProject value hiddenAug 14, 2020
Small boom-truck setting up on South J Street between MLK Jr Way & S. J St to lift & set cooling tower on grade to north. Contractor coordinating with Hospital for Garages and loca…
- BuildingFinaledProject value hiddenAug 3, 2020
Design for new carbon monoxide and nitrogen dioxide detector system throughout commercial garage structure. Installation of (2) new variable frequency drives tied to existing garag…
- ePermitCancelledProject value hiddenJul 27, 2020
Tenant Improvement involving 3 Fire Sprinkler Heads. 9566-005
- ePermitFinaledProject value hiddenJun 17, 2020
3rd floor remodel includes adding needed devices.
- Right-of-WayPermit IssuedProject value hiddenJun 11, 2020
Update ITintfrastructure for the 209 MLK building. New IT racks and cable. This construction project will require a dumpster to discard construction waste for one (1) month while a…
- BuildingFinaledProject value hiddenJun 1, 2020
TI - Replace wood doors with metal doors, add security bars to the interior side of existing pharmacy windows, and add security roll-down door in pharmacy queue area. No change to…
- Right-of-WayPermit IssuedProject value hiddenMay 7, 2020
Update ITintfrastructure for the 209 MLK building. New IT racks and cable. This construction project will require a dumpster to discard construction waste. This permit is for the s…
- BuildingFinaledProject value hiddenApr 27, 2020
SECOND FLOOR TENANT IMPROVEMENT: IN ROOM-W225 TO REPLACE EXISTING FLUOROSCOPY EQUIPMENT WITH NEW EQUIPMENT, NO UPDATES TO THE CEILING. ARCHITECTURAL, STRUCTURAL, ELECTRICAL AND PLU…
- BuildingFinaledProject value hiddenApr 23, 2020
Remove old grilles and replace with(6) HEPA grilles and diffuses. Provide and install (6) dampers as required.
- BuildingFinaledProject value hiddenMar 24, 2020
Provide one cooling only VAV with electric heat. Provide ductwork and GRDS . ProvideRelocate thermostat.
- BuildingFinaledProject value hiddenFeb 11, 2020
Minor Commercial Alteration including door replacement, wall patching, equipment relocation, replacement of acoustical ceiling panels & grids, and upgrades to existing mechanical a…
- BuildingExpiredProject value hiddenFeb 7, 2020
Replace ETO sterilizer with owner provided STERRAD sterilizer. Modify supply and exhaust air to sterilizer room to provide equipment cooling and maintain room pressurization, per a…
- BuildingExpiredProject value hiddenJan 6, 2020
ADDING FIVE SMOKE DETECTORS AT KAISER PERMANENTE LOCATION.
- BuildingFinaledProject value hiddenNov 8, 2019
Installation of fuel tank associated with BLDCA19-0024 and SDEV19-0163
- Right-of-WayPermit IssuedProject value hiddenAug 30, 2019
30 day barricade for generator in ROW. Applicant must apply for a ROCC permit if the generator is planning to remain after the month of September. (Renewal of RUSE19-0353)
- SiteFinaledProject value hiddenAug 13, 2019
Site work associated with replacement of exiting underground fuel tank with above ground fuel tank). Replace existing emergency generator day tank with new day tank and controls Re…
- BuildingFinaledProject value hiddenAug 13, 2019
Construction of a new architectural screen wall addition to surround a new above-ground fuel storage tank. Tied to SDEV19-0163
- Right-of-WayPermit IssuedProject value hiddenMar 5, 2019
Place a dumpster along the street for construction materials. 030419 - 040319. This permit is to continue permission to place a dumpster along the street after RUSE19-0041 expires.…
- Right-of-WayPermit IssuedProject value hiddenFeb 4, 2019
Place a dumpster along the street for construction materials.
- BuildingFinaledProject value hiddenDec 17, 2018
Cosmetic upgrades to public areas on Level 1 through 4, and elevator lobbies on Levels FA through FD. Minor demolition and new construction included.
- BuildingFinaledProject value hiddenFeb 27, 2018
INSTALL (1) DUAL DUCT VAV BOX, NO SUPPLEMENTAL HEAT, NO FAN. ASSOCIATED DUCTS AND DIFFUSERS.
- BuildingFinaledProject value hiddenJan 27, 2018
INSTALL (1) DUAL DUCT VAV BOX, NO HEAT, NO FAN. DEMO (1) AND INSTALL (2) SUPPLY AIR DIFFUSERS. INSTALL (1) RETURN AIR GRILLE. MODIFY LOW AND MEDIUM PRESSURE DUCT. AIR BALANCE (2) V…
- BuildingCert of Completion IssuedProject value hiddenJan 23, 2018
Gamma Camera replacement, upgrades to lead shielding on walls. Minor modifications to room configuration. No change to use or occupancy. Confirmed that the building structure can s…
- Right-of-WayPermit IssuedProject value hiddenJun 12, 2017
Barricade permit for HVAC equipment in the ROW. 06172017
- BuildingFinaledProject value hiddenJun 7, 2017
Emergency replacement of Fan unit on roof of Group Health building.
- BuildingFinaledProject value hiddenMay 24, 2017
Demolish existing ETO Abater. Install new safe-cell II Model DR-50 ethylene oxide removal equipment and accessories. Provide ventilation, contaminated. Exhaust, and air balance of…
- BuildingFinal InspectionProject value hiddenMay 5, 2017
Installing Quantity 2: ½” RPBP (backflow prevention device)
- BuildingCert of Completion IssuedProject value hiddenFeb 27, 2017
Handrail extensions improvement for Group Health Tacoma Medical Center
- BuildingFinaledProject value hiddenFeb 22, 2017
Scope: (1) new pump, (1) new RPBFP, and (1) DI unit.
- SignExpiredProject value hiddenFeb 17, 2017
Remove 1 wall sign and install new Illuminated fascia sign in same location for Kaiser Permanente contractor license TUBEAD311QS
- BuildingExpiredProject value hiddenSep 16, 2016
PROVIDEINSTALL (1) NEW HUMIDIFIER IN EXISTING AHU SUPPLY DUCTWORK. PROVIDEINSTALL NEW DUCTWORK WHERE NECESSARY. PROVIDEINSTALL NEW STEAM AND CONDENSATE PIPING WHERE NECESSARY. PROV…
- BuildingExpiredProject value hiddenMar 24, 2016
Medical gas installation for Group Health
- Right-of-WayPermit IssuedProject value hiddenFeb 5, 2016
Barricade for crane placement for Group Health rooftop work. 2 days only, Feb 13th, 2015 and Feb 20th. Set-up our 40 ton Mobile crane on So J Street (west side Parking and travel l…
Development activity near 209 Martin Luther King Jr Way
7 mapped permits within 500 m, shown on the intelligence map above.
- 315 Martin Luther King Jr Way100 m away
Right-of-Way · Jul 15, 2026
- 315 Martin Luther King Jr Way145 m away
Building · Jul 17, 2026
- 315 Martin Luther King Jr Way145 m away
Building · Jun 22, 2026
- 902 Division Ave169 m away
Right-of-Way · Jul 16, 2026
- 1002 N 4TH St209 m away
Utility Connection · Jun 29, 2026
- 512 N K St393 m away
Building · Jun 30, 2026
- 124 Tacoma Ave S490 m away
Right-of-Way · Jul 15, 2026
209 Martin Luther King Jr Way in the Tacoma permit market
This address has 81 permit records in PropertyLab's public history. The city figures below provide context without changing the focus of this exact-address record.
- City address-linked rows
- 85,097
- City, trailing 90 days
- 1,934
- City, trailing 30 days
- 604
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 19, 2026.
Permit questions about 209 Martin Luther King Jr Way
- Are there building permits at this address?
- 209 Martin Luther King Jr Way has 81 municipal building permits on record, with the latest activity dated Jul 17, 2026.
- What construction activity is nearby?
- 7 mapped permits were found within 500 m of 209 Martin Luther King Jr Way.
- What is the declared permit value?
- Permits recorded at 209 Martin Luther King Jr Way represent $21M in total declared construction value.
About this address record
PropertyLab compiled this permit history from municipal public records for Tacoma, WA. The latest recorded permit activity at 209 Martin Luther King Jr Way is dated Jul 17, 2026. Municipal records can be corrected or updated after publication.
Contractors and applicants associated with these permits
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 209 Martin Luther King Jr Way in the PropertyLab platform, along with alerts when new permits are filed at this address.