Open map
PropertyLabsTacomaAddress intelligence

315 Martin Luther King Jr Way

Building permit intelligence · Tacoma, WA

198 at this address9 nearby within 500 m
At this address
198
Nearby (500 m)
9
Latest activity
Jul 17, 2026
Total permitted value
$36M

Permit history for 315 Martin Luther King Jr Way

  1. BuildingPermit IssuedProject value hiddenJul 17, 2026

    Install Neutralization Tank for Dialysis Machine in Commercial Building.

  2. Right-of-WayPermit IssuedProject value hiddenJul 15, 2026

    7/18/2026: Demo/ remove non-illuminated letter mounted to North and South sides of Tacoma General Hospital's "Sky Bridge" along J Street. No full street closures, only one lane at…

  3. BuildingPermit IssuedProject value hiddenJun 22, 2026

    Mechanical alterations to Cath Lab 5 - Related to BLDCA26-0020

  4. BuildingPermit IssuedProject value hiddenJun 18, 2026

    Replace existing two basin sinks with a single basin sink

  5. BuildingPermit IssuedProject value hiddenJun 15, 2026

    MODIFY THE EXISTING SPRINKLER SYSTEM TO ACCOMMODATE THE NEW WALLS AND CEILINGS.

  6. Right-of-WayPermit IssuedProject value hiddenJun 11, 2026

    Demo/ remove non-illuminated letter mounted to the over pass along J Street. ****Approved 6/12 for 6/12-6/15 2026-(3) extra Barricade days per approved TCP ****** Several lane and…

  7. BuildingPermit IssuedProject value hiddenJun 9, 2026

    MODIFY THE EXISTING SPRINKLER SYSTEM TO EXTEND PROTECTION INTO THE UNPROTECTED TUNNEL CONNECTING THE NEW MARY BRIDGE TO THE EXISTING TGH BASEMENT.

  8. Special EventPermit IssuedProject value hiddenApr 30, 2026

    05/02/2026 Mary Bridge Children's Hospital Grand Opening Celebration The new, long-awaited children's hospital will be opening soon. As part of the week-long celebration including…

  9. BuildingFinaledProject value hiddenApr 29, 2026

    Install 14 Backflows on mobile dialysis devices at medical center

  10. BuildingPermit IssuedProject value hiddenApr 23, 2026

    Alterations to the existing Cath Lab 5, located at Tacoma General Hospital. **Field Revision #1 : FRC26-0126 Approved 5.1.26 : Modification to the structural design.

  11. Right-of-WayPermit IssuedProject value hiddenApr 7, 2026

    In association with issued Sign Permit #SIGN26-0001, we have (4) lane/sidewalk closures required for the work. *EACH PHASE TO BE CLOSED SEPARATELY, NOT CONCURRENTLY* *10 BUSINESS D…

  12. SignPermit IssuedProject value hiddenMar 23, 2026

    Manufacture and install new signage across the entire property, including exterior walls - freestanding and wayfinding signs around the property - and parking garage wayfinding. Th…

  13. BuildingFinaledProject value hiddenMar 6, 2026

    REPLACE MEDICAL AIR MANIFOLD IN THE SAME LOCATION

  14. BuildingPermit IssuedProject value hiddenJan 30, 2026

    Modification to existing fire alarm system. Adding new notification and initiating devices to the Sleep Room TI space. Work is across 4 Pavilions: Rainier, Phillips, Olympic, & Com…

  15. BuildingFinaledProject value hiddenJan 29, 2026

    Remove 4 existing diffusers 1 existing grille, and replace with 6 new diffusers and 1 new grille. Install ductwork branch from existing trunk to new diffusers. ASSOCIATED PERMIT BL…

  16. BuildingFinaledProject value hiddenJan 22, 2026

    Replace one sink serving CT Room #1. Demolish existing medical gas piping. Tie-in new medical gas piping to main medical gas system piping. Addition of zone valve box and area alar…

  17. BuildingPermit IssuedProject value hiddenDec 12, 2025

    Mechanical work associated with Building Permit Record Number BLDCA25-0255.

  18. BuildingPermit IssuedProject value hiddenDec 10, 2025

    MultiCare Health System (Owner) is constructing a Combined Heat and Power (CHP) system at the existing Boiler House at Tacoma General Hospital. The project includes installing 2x 1…

  19. BuildingFinaledProject value hiddenNov 12, 2025

    Removal of CT imaging equipment, casework, flooring, and light fixtures. Installation of new CT equipment, additional lead shielding in some walls, new door, new casework, new floo…

  20. ePermitFinaledProject value hiddenAug 29, 2025

    MODIFY THE EXISTING SPRINKLER SYSTEM TO ACCOMMODATE THE NEW CEILING.

  21. BuildingFinaledProject value hiddenMay 16, 2025

    Remove existing supports for patient lift, install new supports and rails, install lift motor, charge from existing outlet. Anchor bolts will have special inspection.

  22. ePermitPermit IssuedProject value hiddenMay 9, 2025

    MODIFY THE EXISTING SPRINKLER SYSTEM TO ACCOMMODATE THE NEW WALLS AND CEILINGS.

  23. BuildingPermit IssuedProject value hiddenApr 2, 2025

    Installation of (2) new handwashing sinks within the consultation room of the new baby boutique. Installation of domestic water, waste and vent piping to serve the new sinks.

  24. BuildingPermit Fees DueProject value hiddenApr 1, 2025

    Interior alteration at TGH 3rd floor - Mother Baby Boutique. *** FRC25-0078 APPROVED 04-04-2025 Addition of a 2nd sink in the Consultation Room.***

  25. BuildingFinaledProject value hiddenMar 14, 2025

    Demo existing med gas lines to anesthesia and equipment booms. Run new CO2 line to the new anesthesia boom.

  26. BuildingFinaledProject value hiddenMar 12, 2025

    Replacement of the existing light booms in the existing LDRs #3 and #4 at Tacoma General Hospital.

  27. ePermitFinaledProject value hiddenMar 3, 2025

    MODIFY THE EXISTING SPRINKLER SYSTEM TO ACCOMMODATE THE NEW WALLS AND CEILINGS - 4 HEADS

  28. BuildingFinaledProject value hiddenDec 30, 2024

    Provide and install a new automatic and manual fire alarm system and two-way communication system for tenant improvements for the new Mary Bridge Children's Hospital. Install (4) n…

  29. BuildingFinaledProject value hiddenDec 6, 2024

    ADDING 17 STEAM TO STEAM HUMIDIFIERS, A 466 POUND PER HOUR STEAM PRESSURE REDUCING STATION, AND ASSOCIATED STEAM PIPING. RELATED TO BUILDING PERMIT BLDCA24-0329

  30. BuildingFinaledProject value hiddenDec 4, 2024

    Replacement of the overhead booms in OR #7 on the 5th floor, including med gas outlets at Tacoma General Hospital.

  31. BuildingFinaledProject value hiddenNov 14, 2024

    Modifications to the medical gases supporting Procedure Room #3 at Tacoma General Hospital.

  32. BuildingFinaledProject value hiddenNov 7, 2024

    ADD HUMIDITY SYSTEMS AND CONTROLS TO LEVEL 2 AND 3 OF OLYMPIC PAVILION AND LEVELS 5-7 OF PHILIP PAVILION. WORK INCLUDES ADDING 17 STEAM TO STEAM HUMIDIFIERS, A 466 POUND PER HOUR S…

  33. BuildingFinal InspectionProject value hiddenNov 7, 2024

    INTERIOR ALTERATION OF APPROXIMATELY 49,067 SF TO ADD HUMIDITY SYSTEMS AND CONTROLS TO LEVEL 2 AND 3 OF OLYMPIC PAVILION AND LEVELS 5-7 OF PHILIP PAVILION. WORK INCLUDES MEP UPGRAD…

  34. BuildingFinaledProject value hiddenNov 7, 2024

    DEMO EXISTING COMPARMENT SINK, INSTALL NEW HAND SINK AND EYEWASH. BASEMENT: INSTALL NEW FLOOR DRAIN AND PLUMBING CONNECTION TO DOMESTIC WATER, WASTE, PURE WATER, AND COMPRESSED AIR…

  35. BuildingFinaledProject value hiddenOct 30, 2024

    Replacement of the overhead booms in OR #2

  36. BuildingFinaledProject value hiddenSep 5, 2024

    Alterations to the existing decontamination room, located on the the 5th floor of the Philip Pavilion at Tacoma General Hospital and decontamination room located in the basement to…

  37. Right-of-WayFinaledProject value hiddenAug 5, 2024

    Job# 106396716/MBr. Access gas main near property addressed at 315 MARTIN LUTHER KING JR WAY from short side main with one 4’x4’ hole in the grass surface at 300’ WCL of MLK JR WAY…

  38. Right-of-WayPermit IssuedProject value hiddenJul 17, 2024

    Remove and replace (1) damaged sidewalk panel located at 315 S J ST. Removal and replace area is 5'x10'.

  39. BuildingFinaledProject value hiddenJun 5, 2024

    INSTALL (1) 2-TON DUCTLESS SPLIT SYSTEM SERVING IT CLOSET

  40. BuildingFinaledProject value hiddenApr 15, 2024

    Dismantle existing rail system, install new supports and rails, with new hoist motor. Anchors will be in floor slab above, into the concrete beams. Expansion bolts will be used.

  41. Right-of-WayClosedProject value hiddenApr 15, 2024

    Placing Crane over MLK JR to remove old elevator equipment from the roof top of Commercial BLDG. One day barricade per approved TCP.

  42. Right-of-WayClosedProject value hiddenMar 20, 2024

    Crane service to remove old elevator parts off the roof top

  43. BuildingCancelledProject value hiddenJan 4, 2024

    Construct partition wall and install ICU door to separate PACU beds 7 through 9 from the other PACU beds on Philip level 5 for use by Mary Bridge Childrens Hospital pediatric patie…

  44. BuildingFinaledProject value hiddenDec 11, 2023

    For the purpose of elevator modernization: Add hat relays to existing MR, recall existing. Add pit heat in sprinkled pit. Add shunt monitoring

  45. BuildingFinaledProject value hiddenDec 11, 2023

    For the purpose of elevator modernization: Install elevator hat relays in the existing machine room, recall existing. Add heat detector to the sprinkled elevator pit. Install Shunt…

  46. BuildingFinaledProject value hiddenNov 22, 2023

    ADD (2) WAGD OUTLETS; ONE IN OR THREE AND ONE IN OR FOUR. ASSOCIATED WITH WORK PERMITTED UNDER PLMBC22-0314

  47. Right-of-WayPermit IssuedProject value hiddenOct 23, 2023

    Placement starts from MH 199 Pull (160) new 36ct fiber from MH 199 to MPOP through existing 4 conduit. Place (640) new 12ct fiber from MPOP to Cell Site through customer (ATT) prov…

  48. Right-of-WayCancelledProject value hiddenOct 4, 2023

    Removal of CyberKnife medical equipment from Tacoma General Hospital. Semi-trucks will be parked outside near the side walk for 3 days, taking up multiple parking spots, to allow f…

  49. BuildingFinaledProject value hiddenSep 26, 2023

    All of the work is completed, this project switched PM hands a couple of times and we’ve been having trouble getting the TAB scheduled with MHS as they have also had some personnel…

  50. Right-of-WayClosedProject value hiddenJul 6, 2023

    Barricade street for 350 ton crane hoisting equipment over the street (MLK JR) from lot. Includes 1 day barricade on 08/05/2023 per approved TCP.

  51. BuildingFinaledProject value hiddenJun 1, 2023

    INSTALL CHILLED WATER FAN COIL UNIT AND CHILLED WATER CONDENSATE PUMP

  52. BuildingFinaledProject value hiddenMay 11, 2023

    INSTALL (2) DUCTLESS SPLIT SYSTEM AC UNITS FOR IT EQUIPMENT ROOM. ASSOCIATED BLDG PERMIT BLDCA22-0458

  53. ePermitFinaledProject value hiddenApr 10, 2023

    MODIFY THE EXISTING SPRINKLER SYSTEM TO ACCOMMODATE THE NEW WALLS AND CEILINGS.

  54. BuildingFinaledProject value hiddenMar 10, 2023

    Modify existing fire alarm system Multicare Tacoma Baker Bldg Mary Bridge Specialties Clinic Level 2 TI. Add (1) NAC panel, (1) smoke detector, (22) ceiling speaker strobes. Joint…

  55. BuildingFinaledProject value hiddenMar 10, 2023

    INSTALL (5) VAV BOXES AND (1) DUCTLESS AC SPLIT SYSTEM. INSTALL DUCTWORK, DIFFUSERS AND GRILLES PER PLANS.

  56. BuildingFinaledProject value hiddenMar 10, 2023

    INSTALL (2) WATER CLOSETS, (2) LAVATORIES, (9) EXAM ROOM SINKS, (1) MEDICATION ROOM SINK, (1) SOILED ROOM HANDWASH SINK, (1) SOILED ROOM DOUBLE SINK AND (1) KITCHEN SINK

  57. Right-of-WayClosedProject value hiddenFeb 28, 2023

    Close sidewalk/parking to replace glass on J St side of Tacoma General. Includes 1 day barricade on 02/28/2023 per TCP.

  58. Right-of-WayClosedProject value hiddenFeb 10, 2023

    Block sidewalk for one day on 2/11/2023 to park concrete truck to do pour into building for BLDCA21-0369.

  59. BuildingFinaledProject value hiddenJan 30, 2023

    Add (1) new WAGD outlet (TYP C-Section OR-3). Add (1) new WAGD outlet (TYP C-Section OR-4). Relocate existing ceiling and wall outlets 2nd floor CT-2 (O2, MA, MV). Relocate existin…

  60. Right-of-WayClosedProject value hiddenJan 18, 2023

    Block sidewalk for one day on 1/21/2023 to park concrete truck to do pour into building for BLDCA21-0369.

  61. BuildingFinaledProject value hiddenDec 9, 2022

    Modify existing fire alarm system Tacoma General Hospital, Parking Garage Levels P1-P3, replacing existing smoke detectors with high humidity heat detectors in same locations. (3)…

  62. BuildingFinaledProject value hiddenNov 18, 2022

    RELOCATE EXISTING MED GAS OUTLETS; VACUUM, IXYGEN & MEDICAL AIR. REPLACE SHOWER WITH LIKE-FOR-LIKE, WITH ANTI-LIGATURE FIXTURES AND CASING.

  63. BuildingFinaledProject value hiddenNov 10, 2022

    Renovation of an existing two bed patient room in the Mary Bridge Childrens Hospital for behavioral health safety concerns by replacing existing fixtures and hardware with anti-lig…

  64. BuildingFinaledProject value hiddenNov 8, 2022

    Modify existing fire alarm system at Multicare Tacoma Hospital Level 6 SASS Unit TI. (3) Smoke sensors. Joint venture between Johnson Controls Fire Protection and Madsen Electric.

  65. ePermitFinaledProject value hiddenOct 19, 2022

    Modify existing fire alarm system Multicare Tacoma Hospital, Rainier Pavilion, Basement Level, Clean & Soiled Uitility TI. Add (2) ceiling speakerstrobes. Joint venture between Joh…

  66. ePermitExpiredProject value hiddenOct 6, 2022

    MODIFY THE EXISTING SPRINKLER SYSTEM TO ACCOMMODATE THE NEW WALLS AND CEILINGS.

  67. BuildingFinaledProject value hiddenSep 28, 2022

    INSTALL NEW VAV TERMINAL UNIT WITH HOT WATER REHEAT COIL SERVING NEW CONFERENCE ROOM. INSTALL NEW RETURN AIR TERMINAL UNIT. ASSOCIATED DUCTWORK, PIPING DIFFUSER AND GRILLE ADDITION…

  68. BuildingFinaledProject value hiddenAug 23, 2022

    Upgrade existing Fire Alarm Control Panels with new 4100ES panel components, Multicare Tacoma Nodes 7 & 11 Phillips Pavilion. (2) FACP. Joint venture between Johnson Controls Fire…

  69. BuildingFinaledProject value hiddenAug 4, 2022

    Upgrade existing Fire Alarm Control Panel with new 4100ES panel components, Multicare Tacoma Node 9 Phillips Pavilion. (1) FACP, (1) Transponder. Joint venture between Johnson Cont…

  70. BuildingFinaledProject value hiddenJul 26, 2022

    ADJUST FIRE SPRINKLERS FOR NEW ACT CEILING ELEVATION CHANGES

  71. BuildingFinaledProject value hiddenJul 20, 2022

    INSTALL MEDGAS OUTLETS: (8) OXYGEN, (8) MEDICAL AIR, (8) MEDICAL VACUUM. INSTALL COMBINATION ZONE VALVE BOX AND AREA ALARM PANEL.

  72. BuildingFinaledProject value hiddenJun 27, 2022

    PROVIDE MEDICAL O2 AND VACUUM FROM EXISTING RISER TAPS ON 6TH FLOOR. INSTALL OXYGEN AND MEDICAL VACUUM WALL OUTLETS AT PATIENT BAYS. INSTALL ZONE VALVE BOX IN HALLWAY BEFORE ENTERI…

  73. BuildingFinaledProject value hiddenMay 20, 2022

    Adding new low wall exhaust in HD buffer room at Multicare Regional Cancer Center. Associated with approved permit MECH21-0193

  74. BuildingFinaledProject value hiddenMay 3, 2022

    Replace 3 patient lifts in the Olympic Pavilion - two on floor 4, one on floor 5. Remove the existing rail and support systems. Install new supports and rails so system will be rat…

  75. BuildingFinaledProject value hiddenMay 2, 2022

    Replace existing 2 Main and attach to existing branch lines exiting towards the corridor. Replace existing pendent coverage to accommodate new ceilings and walls.

  76. BuildingFinaledProject value hiddenApr 29, 2022

    INSTALLATION OF (2) VFDs, (2) PUMPS AND (5) CONTROL VALVES.

  77. BuildingFinaledProject value hiddenApr 28, 2022

    DEMOLISH EXISTING WATER CLOSET AND LAV IN UNISEX TOILET ROOM, DEMOLISH EXAM ROOM SINK AND STORAGE ROOM HAND SINK. INSTALL (6) NEW WALL MOUNT SINKS, (1) BREAK ROOM SINK AND (1) NEW…

  78. BuildingFinaledProject value hiddenApr 18, 2022

    SFS will provide new pendent sprinklers to accommodate new ceilings and walls, which will come off of existing sprinkler system.

  79. ePermitExpiredProject value hiddenApr 7, 2022

    Modify existing fire alarm system Multicare Tacoma Hosp, Ranier Pavilion, Basement Level, Clean & Soiled Uitility TI. Add (2) ceiling speakerstrobes. Joint venture between Johnson…

  80. Right-of-WayFinaledProject value hiddenMar 23, 2022

    110T Crane to hoist Elevator Equipment

  81. BuildingFinaledProject value hiddenMar 23, 2022

    INSTALL TERMINAL UNITS, SUPPLY DIFFUSER AND RETURNEXHAUST GRILLES (Related to BLDCA21-0472) 11-07-2022- APPROVED REVISION FOR CEILING COVER

  82. BuildingFinaledProject value hiddenMar 15, 2022

    Multicare Wound Care Plumbing - REMODEL OF EXISTING EXAM ROOMS & WAITING ROOM INTO WOUND CARE OUTPATIENT CLINIC, INCLUDING ASSOCIATED MECHANICAL (HVAC), ELECTRICAL, AND PLUMBING SY…

  83. BuildingExpiredProject value hiddenMar 9, 2022

    THE PROJECT SCOPE IS A RENOVATION OF AN EXISTING, UNUSED WAITING ROOM & RECEPTION AREA TO BECOME A WORKOFFICE SPACE FOR CATH LAB STAFF ON LEVEL 07 OF MULTICARE TACOMA GENERAL HOSPI…

  84. BuildingFinaledProject value hiddenMar 1, 2022

    CLINICAL ENGINEERING - REMODEL OF EXISTING OFFICES INTO OPEN WORK AREAS, MEDICAL EQUIPMENT REPAIR, PARTS STORAGE, TRAINING, PRIVATE OFFICES, AND BREAK ROOM. MECHANICAL (HVAC) AND E…

  85. BuildingFinaledProject value hiddenMar 1, 2022

    DEMO & REPLACE EXISTING HOT & COLD DUCTWORK FROM MAIN BRANCH TO AMU-13. REPLACE AMU-13 DUAL DUCT MIXING BOX.

  86. SiteClosedProject value hiddenFeb 24, 2022

    Tacoma Hilltop extension of Sound Transits light rail

  87. BuildingFinaledProject value hiddenFeb 11, 2022

    INSTALL (3) RESTROOM LAVATORIES, (3) WATER CLOSETS, (3) UTILITY SINKS, (1) KITCHEN SINK, (4) HAND-WASHING LAVATORIES, (2) REFRIGERATOR BOXES, (1) ICE-MAKER BOX, (1) FLOOR SINK, AND…

  88. BuildingFinaledProject value hiddenFeb 10, 2022

    Modification of Multicare Rainier Tower Node 5 Fire Alarm System. Remove and replace internal components of (1) existing FACP and (2) transponder panels with new 4100ES FACP. Joint…

  89. BuildingFinaledProject value hiddenJan 25, 2022

    REMODEL OF EXISTING SERVERY INSIDE OF TACOMA GENERAL HOSPITAL. NEW CASEWROK, FINISHES, AND EQUIPMENT INCLUDING ASSOCIATED ELECTRICAL AND PLUMBING SYSTEMS. NO STRUCTURAL WORK. NO EX…

  90. BuildingFinaledProject value hiddenJan 24, 2022

    REMOVE DIFFUSERS AND GRILLES IN THE AREA OF WORK WITH NEW CEILINGS. MODIFY AND INSTALL LOW PRESSURE DUCT WORK AND DIFFUSERS PER PLANS. INSTALL (3) NEW DIFFUSERS AND (3) NEW GRILLES…

  91. BuildingFinaledProject value hiddenJan 20, 2022

    Wound Care Relocation - REMODEL OF EXISTING EXAM ROOMS & WAITING ROOM INTO WOUND CARE OUTPATIENT CLINIC, INCLUDING ASSOCIATED MECHANICAL (HVAC), ELECTRICAL, AND PLUMBING SYSTEMS. N…

  92. ePermitFinaledProject value hiddenJan 17, 2022

    SMITH FIRE WILL RELOCATE 6 SPRINKLERS ON AN EXISTING SPRINKLER SYSTEM

  93. BuildingFinaledProject value hiddenJan 10, 2022

    Demo’ing and eliminating (1) floor sink. Relocating (1) floor sink as labeled and identified and tie into the existing waste and vent piping FRC22-0097 Approved 04202022 for REVISI…

  94. Right-of-WayPermit IssuedProject value hiddenDec 21, 2021

    Setting a 350T crane on S 4th St to hoist HVAC equipment to and from the roof. Full closure between S J st and S I st. Estimating an 8 hour day worth of hoisting. Includes 1 day ba…

  95. BuildingFinaledProject value hiddenDec 17, 2021

    Replace CT scanner, lap laser system and RPM camera. Install new Varian camera system, modify electrical and mechanical equipment as required. No changes to plumbing. Replace floor…

  96. BuildingFinaledProject value hiddenDec 13, 2021

    HVAC AND INTERIOR FINISHES UPDATED IN THE CLEAN AND SOILED UTILITY ROOMS. All APPROVED MECHANICAL, ELECTRICAL AND PLUMBING SCOPES REQUIRE SEPARATE PERMITS FOR FIXTURES AND EQUIPMEN…

  97. BuildingFinaledProject value hiddenDec 6, 2021

    INSTALL SUPPORTS AND RAILS FOR PATIENT LIFTS IN ROOMS 504, 538 AND 547 ON LEVEL 5 OF THE RANIER PAVILION AT TACOMA GENERAL HOSPITAL. NOTE: NO MECHANICAL OR PLUMBING WORK WAS REVIEW…

  98. BuildingFinaledProject value hiddenNov 3, 2021

    MODIFYING THE EXISTING SPRINKLER SYSTEM IN THE LEVEL2 OLYMPIC PAVILLION AREA OF WORK TO ACCOMMODATE THE NEW WALLS AND CEILINGS OF THE CLINICAL ENGINEERING REMODEL. 56 SPRINKLERS AR…

  99. BuildingFinaledProject value hiddenOct 28, 2021

    DEMO AND REMOVE EXISTING 500 TON CARRIER CHILLER WITH 134A REFRIGERANT AND REPLACE WITH NEW HIGH EFFICIENCY 500 TON YORK YMC2 CHILLER WITH 134A REFRIGERANT. RECONNECT EXISTING PIPI…

  100. BuildingFinaledProject value hiddenOct 22, 2021

    Replacing like-for-like sink at Tacoma General Hospital Pharmacy. 204141-002 NOTE: Related to MECHC21-0193.

  101. BuildingFinaledProject value hiddenOct 19, 2021

    REMOVE EXISTING FLUID COOLER. PROVIDE ONE FLUID COOLER, PROVIDE CONNECTION TO EXISTING CONDENSER WATER SYSTEM, MAKE-UP WATER, DRAIN AND OVERFLOW PIPING PER MANUFACTURES INSTALLATIO…

  102. BuildingFinaledProject value hiddenSep 28, 2021

    Correct airflows airflows and pressurization in particulars parts of Tacoma General Hospital. New ductwork; enlarging some chilled water piping; addition and relocation of supply a…

  103. Right-of-WayFinaledProject value hiddenSep 24, 2021

    Utilizing a 40T Truck Mounted Crane, hoisting units from grade at a radius of 70 - one day per approved TCP

  104. BuildingFinaledProject value hiddenSep 22, 2021

    Modify existing fire alarm system Multicare Tacoma Rainier Pavilion, Level 1 Area C, PHP-UP TI. (8) Devices. Joint venture between Johnson Controls Fire Protection and Madsen Elect…

  105. BuildingFinaledProject value hiddenSep 21, 2021

    Replace chilled water lines, install medical gases, and install hand wash sink.

  106. BuildingFinaledProject value hiddenSep 21, 2021

    Revise HVAC system to accommodate new CT Scanner equipment. No changes to air handler unit. Replacement of terminal units and ductwork only.

  107. BuildingFinaledProject value hiddenSep 21, 2021

    Install CT Scanner imaging equipment, install above ceiling supports, revise HVAC, install plumbing, replace lighting, replace ceiling, replace flooring, patch and paint walls. Plu…

  108. BuildingFinaledProject value hiddenSep 8, 2021

    REPLACE LAV AND WATER CLOSET, LIKE-FOR-LIKE. 11152021 (FRC21-0236) Relocation of med gases added to scope of work.

  109. BuildingFinaledProject value hiddenSep 7, 2021

    MODIFY THE EXISTING SPRINKLER SYSTEM TO ACCOMMODATE THE NEW WALLS AND CEILINGS IN MB LABS NW ATS AT TACOMA GENERAL HOSPITAL.

  110. ePermitFinaledProject value hiddenSep 1, 2021

    Smithfire will relocate 6 sprinklers into the new ceiling of the remodeled Biplane Room.

  111. BuildingFinaledProject value hiddenAug 26, 2021

    Provide (2) Medical Vacuum outlets. Refer to Building Permit BLDCA21-0052

  112. BuildingFinaledProject value hiddenAug 24, 2021

    MECHANICAL REVIEWED AND APPROVED UNDER PERMIT BLDCA21-0107. MECH SCOPE: REPLACE (1) VAV.

  113. BuildingFinaledProject value hiddenAug 23, 2021

    INSTALL LAV, SINK AND TOILET ASSOCIATED WITH BUILDING PERMIT BLDCA21-0158

  114. BuildingFinaledProject value hiddenAug 23, 2021

    Mechanical work associated with alterations to the existing biplane procedure room, control area, and equipment room at Multicare TG Hospital. 2nd & 3rd floor alterations. Mechanic…

  115. BuildingFinaledProject value hiddenAug 20, 2021

    Mechanical upgrades in association with HVAC Equipment. 204141-002

  116. BuildingFinaledProject value hiddenAug 18, 2021

    MODIFY THE EXISTING SPRINKLER SYSTEM TO ACCOMMODATE THE NEW WALLS AND CEILINGS.

  117. BuildingFinaledProject value hiddenJul 19, 2021

    Replace existing Fluoroscopy X-Ray with new. Revise wall in control room, replace faucet and add new control valve in duct. Plumbing and Mechanical Reviewed and Approved under BLDC…

  118. BuildingFinaledProject value hiddenJul 6, 2021

    Remodel of existing conference, bathroom, and locker rooms into open office areas, private offices, and workstations.

  119. BuildingFinaledProject value hiddenJun 25, 2021

    REMODEL OF EXISTING 4TH FLOOR OFFICES AND EEG ROOMS. NO STRUCTURAL WORK. NO EXTERIOR WORK. SEPARATE PERMITS REQUIRED FOR ASSOCIATED MECHANICAL (HVAC), ELECTRICAL, AND PLUMBING WORK

  120. BuildingFinaledProject value hiddenJun 18, 2021

    DEMO EXISTING MEDIUM & LOW PRESSURE SUPPLY DUCT COMING OUT OF THE EAST SIDE OF THE MECHANICAL SHAFT. RE-USE THE EXISTING (2) VAV TERMINAL BOXES TO SERVE EXTERIOR ZONES. SUPPLY (3)…

  121. BuildingFinaledProject value hiddenJun 15, 2021

    Installation of a Sump Pump for storm water. Discharge of sump pump is connecting to an existing 6 storm line above the ceiling

  122. BuildingFinaledProject value hiddenJun 15, 2021

    REMODEL OF EXISTING 1ST FLOOR OPEN STORAGE SPACE INTO INDIVIDUAL OFFICES, OPEN OFFICE SPACE, AND SUPPORT SPACES FOR STAFF INCLUDING STAFF KITCHENETTE, CONFERENCE ROOM, AND TOILET R…

  123. BuildingFinaledProject value hiddenJun 1, 2021

    These plans detail out the new supply and return duct work that is associated with the HVAC Upgrade. Refer to Permit MECHC20-0334 for the new air handlers that will be installed by…

  124. Right-of-WayPermit IssuedProject value hiddenApr 20, 2021

    Dumpster placement (7 days) related to MSU Ramp and Deck, ASI 12. DEF20-0146 REVISED 42821: Extended to 14 days of placement REVISED 7921: Extended by an additional 30 days of plac…

  125. BuildingFinaledProject value hiddenApr 13, 2021

    Alterations to the existing biplane procedure room, control area, and equipment room at MultiCare TG Hospital. 2nd & 3rd Floor alterations. Note: All Mechanical, PlumbingElectrical…

  126. BuildingExpiredProject value hiddenJan 13, 2021

    REPLACE SUPPLY AIR HANDLER SF-2 AND RE-1 SCOPE: REPLACE RE-1 AIR HANDLER.

  127. BuildingFinaledProject value hiddenJan 13, 2021

    Modify existing fire alarm system Rainier Pavillion Sterile Storage and Decon. Basement Level and Temporary Power Trailer. (9) devices. Joint venture between Johnson Controls Fire…

  128. Utility ConnectionFinaledProject value hiddenJan 11, 2021

    Water connection from newly constructed MLK3rd St. Station to existing water main.

  129. Utility ConnectionFinaledProject value hiddenJan 11, 2021

    Surface water connection from newly constructed MLK3rd St Station to existing storm drain. Approved wComments 1. Work associated with Sound Transit project. To be installed per app…

  130. BuildingFinaledProject value hiddenDec 4, 2020

    Tenant Improvement involving the replacement of a Return Air Fan with a Fan Wall. 204808-001

  131. BuildingFinaledProject value hiddenOct 28, 2020

    SMITHFIRE WILL MODIFY THE EXISTING SPRINKLER SYSTEM TO ACCOMMODATE THE NEW CEILINGS. Expanded scope: involve installing a new temporary water supply line from the existing sprinkle…

  132. BuildingCancelledProject value hiddenOct 22, 2020

    Remove connection to existing medical booms. Re-route medical gas piping to existing relocated medical boom. No new outlets are being installed, per plan.

  133. BuildingFinaledProject value hiddenOct 20, 2020

    Plumbing associated with remodel of Existing Coffee Cafe inside of Tacoma General Hospital.

  134. BuildingFinaledProject value hiddenOct 20, 2020

    Remodel of existing coffee cafe inside of TG Hospital. New Casework, Finishes, and equipment including associated electrical and plumbing systems. No structural work, no exterior w…

  135. BuildingFinaledProject value hiddenOct 16, 2020

    Modify existing fire alarm system Multicare Tacoma General Hospital Levels 2, 3, Plastic Surgery and Urology TI. Joint venture between Johnson Controls Fire Protection and Ken Bobk…

  136. Right-of-WayFinaledProject value hiddenOct 2, 2020

    One day barricade on December 12, 2020. Phase -2 coming back to TG to lift HVAC Equipment to rooftop.

  137. ePermitFinaledProject value hiddenJul 28, 2020

    SMITHFIRE WILL MODIFY THE EXISTING SPRINKLER SYSTEM TO ACCOMMODATE THE NEW WALLS AND CEILINGS IN THE REMODELED CATH LAB SPACE.

  138. Right-of-WayPermit IssuedProject value hiddenJul 28, 2020

    Hoist elevator equipment for Kone Elevator Co & Tacoma General. Non-Arterial Street Closure Mobile crane to sit on J street between S 4th St & S 5th St Hoisting Elevator equipment…

  139. BuildingFinaledProject value hiddenJul 9, 2020

    Remodel Cath Lab 1 on Philip Level 7. Reroute medical gas piping. (Associated with BLDCA20-0158). 1212020 Revision to reroute medical gas piping.

  140. ePermitFinaledProject value hiddenJun 29, 2020

    SMITHFIRE WILL REPLACE (1) SPRINKLER IN A SHOWER WITH AN INSTITUTIONAL ANTI-LIGATURE STYLE SPRINKLER WITH THE SAME KFACTOR.

  141. Right-of-WayPermit IssuedProject value hiddenJun 25, 2020

    Barricade for crane hoisting new roof top unit and removal of temp AHU at TG Hospital. NO PARKING signs must be placed at least 72 hours in advance.

  142. BuildingFinaledProject value hiddenMay 12, 2020

    Remodel at Tacoma General Hospital. Replace existing equipment: three (3) steam sterilizers, three (3) washerdisinfectors, (1) sonic irrigator, one (1) conveyor system, one (1) low…

  143. Right-of-WayExpiredProject value hiddenMay 8, 2020

    Request access to MH 199 and MH 200 to splice exiting fiber into existing conduit. No hard or soft surface disturbance.

  144. BuildingFinaledProject value hiddenMar 4, 2020

    Replacement of existing medical vacuum system. Zero outlets. This is an equipment replacement of the vacuum pump only per plan.

  145. BuildingCancelledProject value hiddenJan 27, 2020

    TI to rooms 1-16 and Corridors 1 and 2 at 3rd floor of Tacoma General Hospital. Includes the following: • Glass door with badge reader (Entrance door 1) • Glass door with badge rea…

  146. BuildingFinaledProject value hiddenDec 18, 2019

    Install (1) 1 12 backflow preventer, per plan. Work approved on this permit is limited to installing a backflow preventer and piping in and out of a reverse-osmosis system.

  147. BuildingCancelledProject value hiddenNov 13, 2019

    Install the medical air compressor, receiver, dryer & filter provided by Roger’s Machinery and all the interconnecting piping between components and down the corridor and into the…

  148. BuildingFinaledProject value hiddenSep 11, 2019

    Plumbing associated with interior renovations of the existing Tacoma General Inpatient Pharmacy to create USP 797800 compliant compounding facilities (related to BLDCA19-0090).

  149. BuildingFinaledProject value hiddenSep 11, 2019

    Mechanical work associated with interior renovations of the existing Tacoma General Inpatient Pharmacy to create USP 797800 compliant compounding facilities (related to BLDCA19-009…

  150. BuildingFinaledProject value hiddenSep 6, 2019

    Modify existing fire alarm system Tacoma General Emergency Dept. 16 devices. Joint venture between Johnson Controls Fire Protection and Madsen Electric.

  151. ePermitFinaledProject value hiddenSep 4, 2019

    Modify existing fire alarm system to removerelocate (2) duct detectors, add new (2) duct detectors. Floor 6 S OR Humidifiers. Joint venture between Johnson Controls Fire Protection…

  152. Right-of-WayPermit IssuedProject value hiddenJun 19, 2019

    Placement of two dumpsters to provide service while the hospital compactor is out of service. June 20-24, 2019 per approved TCP.

  153. BuildingFinaledProject value hiddenMay 13, 2019

    Emergency panel replacement for Multicare Tacoma General Garage. Includes new fiber modules and IAM devices to replace existing. Required pull station at panel and exterior hornstr…

  154. BuildingFinaledProject value hiddenApr 19, 2019

    Interior renovations of the existing Tacoma General Inpatient Pharmacy to create USP 797800 compliant compounding facilities. FRC21-0057 (4721): Remove the below-floor shaft enclos…

  155. BuildingFinaledProject value hiddenApr 10, 2019

    As part of the MRI remodel project, Permit BLDCA18-0223, install a patient lift rail system and electrical charging system for a 700 capacity patient lift. Supports will be retrofi…

  156. BuildingFinaledProject value hiddenMar 26, 2019

    The Project consists of the alteration of floors 2 and 3 of the Milgard Pavilion to separate Tacoma General and Mary Bridge Childrens Hospitals EDs by floor. Includes remodel of 2n…

  157. BuildingFinaledProject value hiddenMar 15, 2019

    MODIFY THE EXISTING SPRINKLER SYSTEM TO ACCOMMODATE THE NEW WALLS AND CEILINGS

  158. BuildingFinaledProject value hiddenFeb 28, 2019

    Replace existing electric humidifiers and install new steam humidifiers and appurtenances. Modifications to existing duct work.

  159. BuildingFinaledProject value hiddenJan 9, 2019

    Modify existing fire alarm system Tacoma General Rainier for damper work adding (55) duct detectors. Joint venture between Johnson Controls Fire Protection and Madsen Electric.

  160. BuildingFinaledProject value hiddenDec 18, 2018

    Provide and install 2 LAVs, 2 WC, 11 Sinks - Medical Gas Provide and install 1 Zone valve box, 2 Area Alarms and 28 MG outlets. (Approved through BLDCA18-0223)

  161. BuildingFinal InspectionProject value hiddenDec 18, 2018

    Provide and install 4 VAVs 2 Pumps. This work was approved under BLDCA18-0223.

  162. BuildingFinaledProject value hiddenNov 5, 2018

    MODIFY THE EXISTING SPRINKLER SYSTEM TO RESOLVE CODE CORRECTIONS

  163. BuildingFinaledProject value hiddenOct 19, 2018

    MODIFY THE EXISTING SPRINKLER SYSTEM TO ACCOMMODATE THE NEW WALLS AND CEILINGS

  164. BuildingFinal InspectionProject value hiddenAug 2, 2018

    MODIFY THE EXISTING SYSTEM TO ACCOMMODATE THE NEW WALLS AND CEILINGS

  165. BuildingFinaledProject value hiddenJul 26, 2018

    Remodel of Ortho and diagnostic imaging to create space for new 3T MRI.

  166. BuildingFinaledProject value hiddenJul 12, 2018

    Provide and install (3) VAV and (1) Exhaust Fan - as approved under BLDCA17-0287

  167. Right-of-WayPermit IssuedProject value hiddenMay 18, 2018

    This work will remove and replace exterior signage on the exterior of Tacoma General hospital. 2 signage locations along MLK that will impact the ROW. At the corner of MLK and 5th…

  168. SignExpiredProject value hiddenMay 18, 2018

    Install two (2) single-faced, illuminated fascia signs for Mary Bridge Childrens Hospital.

  169. BuildingFinal InspectionProject value hiddenApr 19, 2018

    Add (1) sprinkler head to accommodate new door

  170. BuildingC of O IssuedProject value hiddenNov 21, 2017

    Remodel two ED Treatment Rooms to provide accommodation for psychiatric seclusion.

  171. BuildingExpiredProject value hiddenNov 20, 2017

    Communicate the latest Statement of Conditions, Fire & Life Safety drawings for Tacoma General Hospital to the authorities having jurisdiction. Make the following changes to damper…

  172. BuildingCert of Completion IssuedProject value hiddenNov 17, 2017

    Building maintenance projects (new ceilings, new doors, new lights, HVAC rebalance) in Central Processing, Birthing Suite, Intermediate Care Nursery. Contractor is Abbot Constructi…

  173. BuildingExpiredProject value hiddenAug 29, 2017

    Med gas rework

  174. Right-of-WayPermit IssuedProject value hiddenJul 7, 2017

    1 Week Barricade for Boom Lift in the ROW. 07132017-07202017

  175. ePermitClosedProject value hiddenFeb 8, 2017

    Add new bell and strobe to outside first floor oxygen storage room.

  176. Right-of-WayCancelledProject value hiddenJan 19, 2017

    69 new 14 strand and lash 48ct fiber; 100 of overlash 48ct fiber; 19 directional bore, 12 trench - install 2conduit and pull 48ct fiber through.

  177. BuildingExpiredProject value hiddenJan 13, 2017

    REMOVE & RECYCLE EXISTING DUCTWORK INSTALL EXHUAST DUCT AND INSTALL CEILING DIFFUSERS

  178. ePermitClosedProject value hiddenNov 29, 2016

    Modify sprinkler system for code corrections

  179. BuildingC of O IssuedProject value hiddenOct 31, 2016

    Removal of existing equipment, ceiling and ceiling based fixtures; installation of new equipment, upgraded power, new door for equipment closet. Installation of new ceiling grid an…

  180. BuildingFinaledProject value hiddenAug 11, 2016

    Plumbing fixtures and med gas outlets for Olympic Imaging ( associated with BLDCA16-0198)

  181. BuildingFinaledProject value hiddenAug 11, 2016

    Mechanical units for Olympic Imaging (associated with BLDCA16-0198)

  182. BuildingC of O IssuedProject value hiddenAug 1, 2016

    Remodel exam rooms 5, 6 and 7 on the second floor of the Olympic Pavilion. Combine exam rooms 6 and 7 into one room. Replace imaging equipment in room 5 with Siemens YSIO. Replace…

  183. Right-of-WayPermit IssuedProject value hiddenJul 22, 2016

    TWO WAY LANE SHIFT AND SIDEWALK CLOSURE ALONG S. J ST., JUST NORTH OF S. 4TH ST Per approved TCP for work from 72516 to 72916

  184. Right-of-WayPermit IssuedProject value hiddenJun 20, 2016

    Barricade permit for placement of a crane, from 6 AM to 2 PM on Saturday, 62516.

  185. Right-of-WayPermit IssuedProject value hiddenJun 7, 2016

    Barricade for 1 month for construction project for Tacoma General Hospital Rainier Tower - Adolescent Behavioral Health per approved TCP 6816 - 7716 Then ROCC16-0050 MUST BE IN EFF…

  186. Right-of-WayPermit IssuedProject value hiddenMay 26, 2016

    Aerial work with cable installation,repair,removal

  187. Right-of-WayFinaledProject value hiddenMay 24, 2016

    Sidewalk repair and renovation. During this time 220 of sidewalk will be fenced off within the construction area. Barricade signs with Caution tape will encompass the area.

  188. BuildingExpiredProject value hiddenMay 19, 2016

    Modify existing fire alarm system in Rainier Bldg 2nd Floor Adolescent Behavioral Health Unit.

  189. BuildingExpiredProject value hiddenMay 17, 2016

    Modify the existing sprinkler system to accommodate the new walls and ceilings for Tacoma General Hospital Infusion Clinic.

  190. BuildingExpiredProject value hiddenMay 11, 2016

    Modify existing fire alarm system for HMICI relocation adding (1) NAC & (24) devices. Joint venture between SimplexGrinnell and Ken Bobko Electric.

  191. BuildingExpiredProject value hiddenMay 11, 2016

    Modify existing fire alarm system for Tacoma Gen Hospital 3rd floor M-wing Infusion Services TI.

  192. Right-of-WayPermit IssuedProject value hiddenMay 10, 2016

    TWO WAY LANE SHIFT AND SIDEWALK CLOSURE ALONG S. J ST., JUST NORTH OF S. 4TH ST Per approved TCP for work beginning 6202016

  193. BuildingExpiredProject value hiddenMay 2, 2016

    MODIFY EXISTING FIRE SPRINKLER SYSTEM FOR TACOMA GENERAL HOSP 6TH FL SERVER RM TI

  194. BuildingExpiredProject value hiddenApr 29, 2016

    Addrelocate 27 heads for HIM-CI - Level 1

  195. BuildingFinaledProject value hiddenMar 16, 2016

    MEC2016 315 MARTIN LUTHER KING JR WAY K-Wing mechanical upgrades for Tacoma General

  196. BuildingClosedProject value hiddenMar 16, 2016

    Structural upgrade for mechanical units - Multicare K-Wing (Assoc w 4-261662)

  197. Right-of-WayPermit IssuedProject value hiddenMar 15, 2016

    Barricade for one day 31916 for crane.

  198. Right-of-WayPermit IssuedProject value hiddenMar 4, 2016

    3-month barricade for construction project for Tacoma General Hospital Rainier Tower - Adolescent Behavioral Health The duration for the street parking and sidewalk closure is from…

Development activity near 315 Martin Luther King Jr Way

9 mapped permits within 500 m, shown on the intelligence map above.

Explore all Tacoma permits

315 Martin Luther King Jr Way in the Tacoma permit market

This address has 198 permit records in PropertyLab's public history. The city figures below provide context without changing the focus of this exact-address record.

Full Tacoma permit report
City address-linked rows
85,097
City, trailing 90 days
1,934
City, trailing 30 days
604

City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Jul 19, 2026.

Permit questions about 315 Martin Luther King Jr Way

Are there building permits at this address?
315 Martin Luther King Jr Way has 198 municipal building permits on record, with the latest activity dated Jul 17, 2026.
What construction activity is nearby?
9 mapped permits were found within 500 m of 315 Martin Luther King Jr Way.
What is the declared permit value?
Permits recorded at 315 Martin Luther King Jr Way represent $36M in total declared construction value.

About this address record

PropertyLab compiled this permit history from municipal public records for Tacoma, WA. The latest recorded permit activity at 315 Martin Luther King Jr Way is dated Jul 17, 2026. Municipal records can be corrected or updated after publication.

Contractors and applicants associated with these permits

See the contractors, applicants, permit holders, permit numbers, and project documents associated with 315 Martin Luther King Jr Way in the PropertyLab platform, along with alerts when new permits are filed at this address.

315 Martin Luther King Jr Way Building Permits — Tacoma, WA | PropertyLabs