Building permit intelligence · Boston, MA
177 Milk St has 65 municipal building permits on file in Ward 3. The latest recorded activity was a viol permit dated Dec 17, 2024. Permits at this address represent $1MM–$5MM in total declared construction value. PropertyLabs also identified 14 mapped permits within 500 m of this address.
Application to Correct a Violation
Roofing
Roofing
Low Voltage
Electrical
Electrical
14 mapped permits within 500 m, shown on the intelligence map above.
6 other addresses on Milk St with municipal permit records in Boston.
This address has 65 permit records in PropertyLabs' public history and is located in Ward 3. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 2, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 177 Milk St is dated Dec 17, 2024. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 177 Milk St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Installation of Access security devices at Beal & Company Inc 177 Milk St Boston MA 02109 (8-01513-12)
Installation of CCTV security devices at Beal & Company Inc 177 Milk St Boston MA 02109 (8-01513-10)
Installation of Access security devices at Beal & Company Inc. 177 Milk St Boston MA 02109 (8-01513-11)
Office Building Certificate for the;Office on the;1st floor. ALT820718 -4/23/18 .
Installation of Access security devices at Beal & Company Inc 177 Milk St Boston MA 02109 (8-01513-09)
Add Fire Alarm Devices - (1) smoke detector, (1) RAI, (1) monitor module, (5) speaker/strobes
Tenant Fit
48 category 6 drops.
Installation of Access security devices at Beal & Company Inc 177 Milk St Boston MA 02109 (8-00156-20)
Make safe demolition and temporary lighting
Renovation
Build out of tenant space for "FCI" on the 1st floor. Work to include selective demo of finishes, new drywall partitions for new offices, new finishes, lighting, glass, cabinetry,…
Office Building Certificate for 7th Floor Office Space. ALT748825 Issued 8/30/17 ;
run water lie for coffee maker
OME JOB#17-280 Renovation of 7th floor - 177 Milk St. Add 17 tel/data outlets to offices
Add 14 Speaker/ Strobes to renovated office space on the 7th floor
Add 5 lighting fixtures, relocate 6 for new office layout. Add 22 outlets, 2 GFI outlets, and 2 TV backboxes. Tel/Data/AV by others
Interior office renovation on the 7th floor. Demolition of non-structural interior partitions, carpet, cabinetry and acoustical ceiling. Construction of new storage rooms, offices,…
Installation of Access security system devices at Beal & Company Inc 177 Milk St Boston, MA 02109 (8-00156-16)
Installation of Access security system devices at Beal & Company Inc 177 Milk St Boston MA 02109 (8-00156-14)
Wiring of 11 speaker/ strobes, 1 Ansul connection and 3 pull stations in ground floor kitchen/ television studio
All work on the 6th floor existing office suite. Modify existing conference room, ACT ceiling, remove existing closets, new carpet and paint in the entire suite.
Office Building C/O-For Office- first floor and mezzanine space -Only ALT 586668 5/111/16;issued, A633184 issued 9/15/16
Maintain swing of existing doors as shown - Historical Building. Delete folding partition. Modify HVAC layout per plan. cost reflected on Alt586668
Security & Surveillance System installation
we are installing 7 cat 5e low voltage voice cables for telephones
Wiring of new ground level kitchen and television production space
install gas line for 2 stoves
Install four sinks, three floor drains, threebay and hand sink
Installation of security system device
Office fitout of existing first floor and mezzanine space including new walls, finishes, equipment, millwork, Plumbing, Sprinkler, HVAC and Electrical work including fire alarm.
Demolition of existing finishes, installation of a new basement stairway, new finishes (walls, flooring, ceilings), as well as re-working existing MEP-FP. Please see attachments sc…
installation of security system device
Fitout of Commercial Realty office space
Office remodel power & lighting on the 2nd floor
Fire Alarm for 2nd floor remodel
Install truck mounted temporary generator for power to a commercial being filmed at this location 11/1/15
Phased, occupied renovation of the 2nd floor at 177 Milk Street Street. Work includes demolition of existing finishes, new finishes (walls, flooring, millwork) and reworked and new…
gas piping for boiler
Interior renovations of 177 Milk St, 2nd Floor to include demo of a wall to input a sidelight. Minor carpet/ceiling patching and painting
Mortar joint spot cutting and re-pointing on all elevations. Remove and replace exterior window perimeter sealants.
Boiler Room Upgrade - Replace existing boilers and pumps. Reuse / new feeds as required. Misc. Low Voltage HVAC Control Wiring AP 151980
Low Voltage HVAC Control Wiring ~ Love Joy Cooling Tower Job #14-1873 (PAG)
Low Voltage HVAC Control Wiring ~ LoveJoy Pavillion Job #14-1386 (PAG)
Install aditional Burglar alarm equipment 2 Devices
Install Burglar Alarm 5 Devices
Low Voltage HVAC Control Wiring ~ LoveJoy Wharf Job #13-0686 (PAG)
Furnish and install electrical work as needed for office space.
Renovate two extg. office sppaces. Remove existing millwork counters in one office and reinstall at Storage Room, install new door/frame/HDW, drywall, painting, carpet patch, some…
FIRE ALARM WORK
To wire new Dutless split AC
Phase 2 Lobby fit-out for new entry for 8th floor tenant. work Includes minor demolition, drywall, finishes, sprinkler relocations,electrical,FA ,relocation of stair between 7th an…
Install low voltage wiring for data network and telecommunications.
Furnish & install new Lighting, exit signs and power in Tenant space.
Install a dishwasher, floor drians,kitchen sinks, and a shower stall.
General renovation for new tenant on the 7th floor. Work includes new kitchenette and shower, metal stud and drywall partitions, flooring, painting,millwork electrical power and li…
Install four (4) light fixtures, two (2) switches & Heat receptacles.
Renovate existing open office into two private offices creating a smaller open office area. remove carpet and GWB partitions. construct new GWB partitions, new carpet,HM door frame…
install new gas line for boiler relocation
Electrical Permit · ELECTRICAL · Jul 30, 2026