Building permit intelligence · Boston, MA
75 State St has 202 municipal building permits on file in Ward 3. The latest recorded activity was a lvolt permit dated Jul 23, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 3 mapped permits within 500 m of this address.
Low Voltage
Electrical
Fast Track Application
Low Voltage
Low Voltage
Low Voltage
3 mapped permits within 500 m, shown on the intelligence map above.
6 other addresses on State St with municipal permit records in Boston.
This address has 202 permit records in PropertyLabs' public history and is located in Ward 3. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 75 State St is dated Jul 23, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 75 State St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Plumbing
Plumbing
Plumbing
Low Voltage
Low Voltage
Low Voltage
Electrical
Electrical
Low Voltage
Low Voltage
Low Voltage
Fire Alarm
Fire Alarm
Fire Alarm
Electrical
Electrical
Plumbing
Plumbing
Fast Track Application
Fast Track Application
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Interior/Exterior Work
Electrical
Low Voltage
Low Voltage
Electrical
Fast Track Application
Fire Alarm
Plumbing
Low Voltage
Interior renovation to existing tenant space suite on 25th floor of commercial office building. No change in occupancy, use, or egress. No structural work. No renovation to exterio…
Renovations - Interior NSC
Low Voltage
Low Voltage
Low Voltage
Fire Alarm
Electrical
Plumbing
Fast Track Application
Install new meter, transformer, and panelboard to serve 10 new wall mounted EV chargers.
Install rack mounted UPS system and add two 208V branch panels. Demo existing UPS system and batteries. Add redundant receptacles to IDF closets on Floor 3, 4 and 5.
Low Voltage
Fast Track Application
Installation of Plumbing for a kitchen sink on the 25th floor.
Network wiring for BNP on 25th floor
New fire alarm devices being tied into an existing system on the 215th floor of 75 State Street for tenant BNP Paribas.
Expansion of 25th floor office space to include drywall partitions, flooring, ACT ceilings, paint, millwork, glass and new MEP fixtures and equipment to accommodate office layout.
Electrical Work Associates With New Tenant Fit Out On The 25th Floor
Drywall layout, and selective drywall framing, ACT grid, flooring, MEP makesafe and installation of rough wiring.
Offices, Store, Bank, Restaurant, and Wireless CommunicationCertificate for Offices - 28th FloorALT1536618 Issued 11/14/2023
AV cabling and Equipment upgrade. 25th floor. Gartner, Suite 2510
Offices, Store, Bank, Restaurant, and Wireless CommunicationCertificate;for Office Space - 25th FloorALT1526055 Issued 10/3/2023, SF1512787 Issued 8/10/2023, SF1529574 Issued 9/29/…
SIEM773 - Install low voltage controls for the HVAC system on the 28th floor.
Plumbing to restroom and lobby
Install new LED strip lights and change outlets to white
Network wiring on the 28th floor for JTC Group
Remodeling of existing bathrooms and corridors to improve finishes. Including demo, plumbing, electrical, drywall, tile, millwork, painting, glass and ceilings.
SIEM771 - Install low voltage controls on the 25th floor. Two FPBs, one EF, and relocate three thermostats.
Fit-out existing shell space on 28th floor- new office/conf rm layout. New reworked MEP's, FA/FP
Electrical fitout of portion of 28th floor including fire alarm
Electrical fitout of portion of 28th floor including lighting, power @ 75 State Street 28th Floor
New fire alarm devices being added to an existing system on the 28th floor of 75 State Street for tenant JTC Group.
site mobilization on 28th floor, layout,temp.utilities while waiting for full ALT # 1536618 (filed 10/17, Fast track) to be reviewed/approved.
Removal of core bathroom fixtures on the 23rd and 24th floors and replaced with new fixtures,
Offices, Store, Bank, Restaurant, and Wireless CommunicationCertificate for Spec Suite 2101 - 21st FloorALT1467705 Issued 5/9/2023
Interior demo only in tenant space on the 23rd and 24th floors. Demo of existing finishes, non structural partitions, minor MEP's. No FA work, no structural work, no change in use…
New fire alarm devices being added to an existing system at 75 State Street on the 25th floor for tenant Gartner.
New electrical circuits for receptacles and HVAC equipment. New light fixtures and controls.
Furnish & Install 26 data locations and pull security cable for 3 doors @ 75 State St Floor 25 TD
Installation of plumbing for a kitchen sink on the 25th floor,
Install 1 sink and 1 water heater on the 28th Flr
Build-out of 25th floor office tenant space. New finishes throughout, new MEP’s, rework of FA & FP.
Framing new offices, minor electrical work, preparing for build-out of 25th floor office tenant space. ALT1526055. No FA work to be done under this permit.
Renovation of the 1st floor lobby are power and lighting
New fire alarm devices being added to an existing system at 75 State Street for the Lobby.
Interior demolition only to prepare for future tenant fit-out. Demo of interior non-structural partitions, and finishes. No structural work. FA & FP to remain.
SIEM744 - Install low voltage controls for the 21st Floor HVAC.
Renovation to Lobby Area including replacement of storefronts from wood to aluminum system, metal panel wall cladding, glass rails. Fire protection limited to reconfiguration of ex…
Installation of Plumbing for a kitchen sink and a wellness room sink on the 21st floor,
Renovation of existing office space
New fire alarm devices being tied into an existing system on the 21st floor of 75 State Street for spec suite.
Renovations to the 9th floor suite
Offices, Store, Bank, Restaurant, and Wireless CommunicationCertificate for New Amenity Center 7th FloorALT1299013 issued 5/5/22
Build-out of 21st floor tenant spec suite, Suite 2101. Minor demolition, new finishes throughout, new MEP’s, rework of FA & FP.
Offices, Store, Bank, Restaurant, and Wireless CommunicationCertificate For Offices 29th FloorALT1295220 Issued 2/23/22, A1350127 Issued 7/27/22
Electrical demo and make safe of the 25th floor at 75SS.
Removal and disposal of interior finishes and non-load bearing partitions on the 25th Floor
Installation of the electrical interconnections between added workstations using provided circuitry - S23-132 - East Coast Office Installation - 75 State St. 29th Flr. "Optum Ventu…
Access Control System - 5 card readers, door release, and door switch.
Install low voltage cable and system components associated with an AV system upgrade at 75 State Street for Rockhill Management.
Low Voltage Wiring permit for Voice and Data and AV wiring for 79 locs for Optum Ventures at 75 State Street 29th Floor
installation of low voltage automation system at 75 State St. 29th Fl
New fire alarm devices being added to exiting system on the 29th floor at 75 State Street for tenant Optum Ventures.
28th floor-Removal and disposal of interior finishes and non-loadbearing partitions. E[plans];
Renovation of existing office space to new layout
installation of low voltage cat 6 plenum rated cabling ( NO LICENSE REQUIRED )
Renovation of Existing Conference Room on the 1st Floor of 75 State Street for Regus.
SIEM669 - Install low voltage controls for the HVAC system on the 7th floor.
Offices, Store, Bank, Restaurant, And Wireless CommunicationCertificate For 17th Floor OfficesALT1308190 Issued 3/23/2022
Office bathroom & Kitchen Fit-out
Amendment to ALT1295220. Updated Drawings show coordination between Architectural and MEP trades not previously shown on original drawings on 29th Floor.
Job #16339 Astria Therapeutics Make safe demo & renovations on level 14.
New fire alarm devices being added to an existing system on the 7th floor of 75 State Street for Roof Deck and Amenity Project.
provide wiring for 5 access doors
Selective demolition of (1) wall, patch, and paint (2) walls, and soffit affected by demo. Relocate (2) existing fire alarm devices to adjacent walls, and provide power to workstat…
Installation of Plumbing for a tenant fit out on the 7th floor.
Installing new lighting, lighting controls and branch power in 17,000 sf space @ 75 State Street, Boston MA., 7th floor. Partial interior renovation of floor plan, plus roof deck f…
Removal and disposal of carpet, acoustical ceiling tile/grid and non-load bearing partitions in tenant space on the 28th floor. Space will be left in shell condition for a TBD futu…
Tenant renovation on the 17th floor to include new lighting fixture and power installation.
New fire alarm devices being added to an existing system on the 17th floor of 75 State for tenant Stoneturn.
22 new data locations #T1078
Installation of a water line to a coffee maker on the 17th floor,
RENOVATION OF AN EXISTING OUTDOOR AMENITY SPACE AND CONSTRUCTION OF A NEW INDOOR AMENITIES CENTER. UPGRADE OF FINISHES THROUGHOUT THE OUTDOOR PATIO SPACE. RECONFIGURATION OF SPACE…
Expansion of existing tenant space on the 17th floor to include 4 new offices, storage & rework of existing IT room, all new finishes, ceilings, lighting, rework of existing HVAC s…
DEMO of branch power and lighting on the 28th floor
Renovations of existing space on the 29th Floor for Optum Ventures. Work includes removal of finishes, Drywall, Patching, Painting, Ceilings, Floorings, HVAC, Plumbing, Electrical,…
Installation of Cabling for Building Distributed Antenna System. Floor P5-29
Office, Retail Stores, Restaurant, BankCertificate for: Office(s) - 14th fl.ALT1163918 issued 3/30/21
Install 100 amp panel, install 2 ductless splits, and install outlets
Installation of CCTV security device at CDM 75 State St 7th Fl Boston MA 02109 (8-59628-10)
Install new Data cabling
Partial tenant fitout on 19th / 21st Floors. Minor rework of lights and power
Removal and disposal of interior finishes and non-load bearing partitions. This project is to provide demolition for a minor base building upgrade on the ground floor, 6th floor an…
Scope consists of removal of existing carpet, install new carpet, re-painting on19,20,21st floors. Electrical for new open office configuation on 19/21st floors
Installation of Access security device at CDM 75 State St 7th Fl Boston MA 02109 (8-59628-08&09)
17th Floor Make safe and Demolition
New fire alarm being tied into an existing system at 75 State Street for 14th Floor spec suite.
SIEM604 - provide electrician labor for the installation of 2 VAV boxes
Spec Suite and Corridor Renovation
Addition of a kitchenette to an office space.
Spec Suite - 14th Floor -; Interior Office Renovations. Work to include minor demolition, new GWB partitions, upgrading architectural finishes (ACT, flooring, paint, millwork, glaz…
Install wiring within office cubicles on 25th floor for BNP Paribus
Install wiring within office cubicles on 5th and 6th floors for Committee for Public Council Services
Offices, Store, Bank, restaurant and Wireless Communication.Certificate for the Offices on the 25th floor;ALT1118955 issued: 10/8/20
75 State Street - Chiller Replacement. Power wiring, rework existing feeders to (2) new chillers. Total Tons 600 -A.P - 208988
Offices, Store, Bank, Restaurant and Wireless Communication Certificate for the Offices on the 1st &; 2nd floors-Only; ALT927804 issued: 4/11/19 &; A1024559 issued: 12/18/19
Network wiring for BNP on 25th floor
New fire alarm devices on the 25th floor being tied into the existing system for tenant BNP Paribas at 75 State Street
Electrical work to install HVAC control wiring for (3) thermostats.
Installation of Plumbing for three kitchen sinks on the 25th floor,
Fitout of the 25th floor tenant space consisting of new lighting and power upgrades
Electrical work for 4th floor office fit up. Includes connection of (1) water heater (1.4kw).
control wiring for 7 fan bower boxes on 25th floor project. SIEM561
Electrical work for 5th floor corridor upgrade. Work will be performed at 15 Broad Street location.
Electrical work as required for office fit up at 15 Broad Street, 5th Floor. Includes (1) water heater (6kw) and (1) heat pump (2kw).
Renovation of the 5th floor corridor to include removal and replacement of ceiling tile & carpet and paint walls.
Renovation of existing 4th Floor Spec Suite space
BNP Paribas - 25th Floor -;; Office renovation;on the 25th floor. Construction of new offices, boardroom, conference rooms &; work stations. Work includes new drywall partitions, g…
Offices, Store, Bank, Restaurant and Wireless Communication Temporary Certificate for the Offices on the 1st &; 2nd floors.; Certificate expires on;December 1, 2020;pending complet…
Demolition of existing office space on the 5th floor. Selective removal of drywall, partition walls, ceiling tiles, carpet and lighting.
Renovation of existing 15 Broad St. tenant space
Removal and disposal of interior finishes and non-load bearing partitions. Intent of project is to leave the existing vacant tenant space in whitebox condition for a future build-o…
Network wiring for LEK Casting in 18th floor
Relocation of existing devices at 75 State Street on the 18th floor for tenant LEK.
Plumbing renovation at 75 State Street (LEK Consulting)
Renovation to the 18th Floor for LEK Consulting
Minor demolition in existing vacant office space on floor 14 at 75 State Street. Removal and disposal of interior finishes and non-load bearing partitions. Space to be left in whit…
Selective delolition and modifications to existing offices on 18th floor. Reuse existing MEP's,
Optum Ventures 29th Floor: Install (1) hard wired duress switch & (1) wireless duress switch at main reception desk. Both to be cabled back to control panel/input board in IDF clos…
Amendment to ALT927804. Interior renovations to include removal of GWB partitions,and relocating sprinkler heads. Construction to include new GWB partitions.Upgrading architectural…
New fire alarm devices added to the existing system on the 3rd, 4th, 5th floors of 75 State Street for tenant Santander. This is a phased project and color coded tier 2 drawings ar…
Renovation of Lobby includes removal and replacement of handrail at 2nd floor mezzanine with a curved glass handrail and install 2 new curved glass storefronts at 2nd floor mezzani…
S19-1041, connect jumpers, receptacles and plug in base feeds for office workstations @ 75 State St, 19th, 20th & 21st floors.
Install wiring within office cubicles on 3rd, 4th, and 5th floors for Santander
Plumbing renovation at 75 State Street (Santander 75 State)
SIEM 467 Santander Floors 3, 4 and 5. Relocate Tstats necessary for remodel.
install voice and data cables cat 5e 300 drops
Renovation to Santander on the 3rd, 4th and 5th Floor of 75 State. Project to consist of (8) Total Phases with a total of (14) Parts. Phase 1 - Part A, B and C, Phase 2, Phase 3 -…
Phase renovations to occupied office spaces on floors 3,4,5 Santander Bank, Demolition and fit out of office space , new flooring, tiles, painting, M/E/P's ,FF&;E in selective area…
Network Cabling on 1st & 2nd Floors.
New fire alarm devices being installed into an existing system at 75 State Street on the 1st and 2nd Floors for tenant Regus/Spaces.
Installation of Plumbing for three kitchen sinks and three Half Baths .
Control wiring for multiple fan powered boxes, exhaust boxes, heat pumps, and water meters.
Bank, Offices, Commercial Retail, Garage Certificate for;Offices, Conference Rooms;on 15th/16th floors-Phase -1-only Alt933168 issued 4/4/19 *Temporary certificate-expires-10/17/19…
Renovation to the 1st and 2nd floor of 75 State for Regus
S19-766, connect jumpers, receptacles and plug in base feeds for office workstations @ 75 State St, Hemenway and Barnes.
Expand access control in 18th floor.
low voltage control wiring for HVAC Floors 15 and 16
Offices, Store, Bank, Restaurant, and Wireless Communication Certificate for;Offices, Meeting areas-29th. fl.-Only Alt 934692 issued 3/28/19
low voltage wiring for HVAC controls
low voltage wiring for HVAC controls 29th floor
Low Voltage wiring permit for Optum Ventures at 75 State St 29th Floor
S19-684, connect jumpers, receptacles and plug in base feeds for office workstation wiring @ 75 State St Boston, 29th floor.
low voltage tel/data cabling at 75 State St. 29th floor
New alarm devices being added to an existing system on the 29th floor of 75 State Street for common areas.
Minor interior renovations to the 4th floor restrooms and common area to include construction of new GWB partitions, upgrading architectural finishes (paint, flooring, lighting), p…
New fire alarm being tied into an existing system on the 29th floor of 75 State Street for tenant Optum Ventures.
Furnish & Install ( 51) - 2 cat 6 wire on the 15th fl. Furnish & Install ( 8) - 2 cat 6 wire on the 16th fl
New fire alarm devices being tied into an existing system on floor 15 and 16 at 75 State Street for tenant Hemenway and Barnes.
Optimum Ventures 75 State Street, 29th Floor: :Low voltage wiring to install Access Control and Video Management System.
Recover the existing awning with new fabric.
kitchenette