60 State St has 218 municipal building permits on file in Ward 3. The latest recorded activity was a intren permit dated Jul 17, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 2 mapped permits within 500 m of this address.
Renovations - Interior NSC
Signs
Low Voltage
Low Voltage
Low Voltage
Renovations - Interior NSC
2 mapped permits within 500 m, shown on the intelligence map above.
6 other addresses on State St with municipal permit records in Boston.
This address has 218 permit records in PropertyLabs' public history and is located in Ward 3. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 60 State St is dated Jul 17, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 60 State St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Renovations - Interior NSC
Electrical
Electrical
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Electrical
Electrical
Electrical
Electrical
Plumbing
Plumbing
Plumbing
Renovations - Interior NSC
Renovations - Interior NSC
Electrical
Fire Alarm
Electrical
Fire Alarm
Fire Alarm
Electrical
Electrical
Fire Alarm
Fire Alarm
Fire Alarm
Electrical
Electrical
Low Voltage
Low Voltage
Low Voltage
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
Renovations - Interior NSC
60 State St Floors 25-32 scope of work includes MEP Makesafe, Flooring Removal, and Door Salvage.
Job #20942 WilmerHale Floors 25-32 UPS Reconfiguration Project
Add 1 CR 19th floor Replace 4 cameras 19th floor Add 1 CR 20th Floor Replace 8 camera 20th floor
Offices, Restaurant, Bank, Retail, Daycare , Event Space with Offices and Full Kitchen;Certificate For Offices on 19th &; 20th Floors;ALT-1763881 Issued 08/26/2025
S25-1109 - Electrician to connect modular workstation wiring to existing circuitry.
HVAC CONTROL WIRING ON THE 19TH & 20TH FLOORS
New lighting and lighting controls for partial renovation of Blackrocks office on the 19th floor
Installation of (4) new audio visual devices and (3) new control modules for Blackrock office renovation on the 20th floor
Replace 2 Electric Water Heaters on 27th Floor
install 4 toilets and 2 Lavs
Job #20025 Blackrock Phase 2 Floor 20 Tel-Data Install
OME JOB#25-090 60 State Street - The Steele Group. F&I new light fixtures in 1/2 of the space.
Offices, Restaurant, Bank, Retail, Daycare , event space with offices and full kitchen;Certificate for offices on the 22nd floor;ALT1707849 Issue on 05/20/2025 &; SF1704253 issued…
New lighting and lighting controls for Blackrock office renovation on the 20th floor
Job #20025 Blackrock Floors 19 & 20 Tel-Data Install
Audio Visual Refresh some rooms on 19 & 20
The project consists of interior finish changes to a commercial office on the 14th Floor of 60 State Street. Renovations include selective removal of finishes and new interior fini…
BlackRock - 20th floor renovation of offices & restrooms work includes: drywall, electrical/fire alarm, low voltage and power, sprinkler, rework HVAC. plumbing & finishes
Furniture feeds to 48 stations at OC and C Statistical Consultants.
Addition of water line for coffee maker
BlackRock - 19th floor Remove drywall of 2 existing office to add to open format offices, remove and replace existing carpets and lighting. finish work, relocate up to 4 sprinkler…
To provide CAT6A cabling for 130 Drops & Associated Keystone and Patch Panels
Erect 30x60 tent on 7/25/25, removal on 7/26/25.
The address is 53 State Street. 53 is not an available search filter.
Offices, Restaurant, Bank, Retail, Daycare , Event Space with Offices and Full Kitchen;Certificate for Office Space - 8th FloorALT1716758 Issued 5/14/2025 &; SF1703186 Issued 4/3/2…
Job #19494 Sam Adams Move (1) Receptacle
Job #19458 Sam Adams Install 2 Hardwired dedicated circs for heat lamp and move two existing receptacles in the kitchen
3 telecom drops on the 8th floor of 60 State St for tenant Later 8th Floor CZ-257720
The project is located at 60 State Street 22nd Floor. The project consists of alterations to an existing office space. It consists of new non-structural interior partitions includi…
OME JOB#25-040 60 State Street Linksquares - Subtenant #2. F&I (3) new strobe only devices into the existing system.
Interior office space renovation of the 8th floor of 60 State St. The renovation consists of adding (3) three offices/huddle rooms. Scope includes drywall, ACT, paint, flooring, gl…
Renovation of an existing space at 60 State St, 22nd floor
Installing new and relocating existing fire alarm devices in tenant space renovation on floor 22. (OC&C)
Install card access for 11 doors, 4 cameras, and 2 intercomms
OME JOB#25-040 60 State Street Linksquares - Subtenant #2. F&I (6) linear light fixtures, (3) wall occupancy sensors, (3) tv boxes with power in new offices.
Interior office space selective demolition of the 8th floor of 60 State St. Scope includes selective demo, and necessary make-safe of plumbing, mechanical and electrical requiremen…
This project is located on the 22nd floor of 60 State Street. Project is to include alterations to the existing office space including new non-structural interior partitions, glass…
Scope of work: Painting of common areas on the 9th floor, updated finishes in file room & pantry, replace existing sink, power modifications, upgrading existing light fixtures, no…
minor renovation to the 9th floor
Bank of America - Replace 15 existing light fixtures in ATM lobby, add 7 new cutoff wall pack fixtures, 2 entry recessed fixtures.
Offices, Restaurant, Bank, Retail, Daycare , Event Space with Offices and Full KitchenCertificate for Office Space - 8th FloorALT1627646 Issued August 08, 2024;
Install wiring within office cubicles on 8th floor for Linksquares
Low Voltage Wiring permit for SAP at 60 State St 7th Floor
11 telecom drops and 5 security devices on the 8th floor of 60 State Street for tenant LinkSquares Sublease CZ-247505/CH-246275
Offices, Restaurant, Bank, Retail, Daycare , Event Space with Offices and Full kitchenCertificate for Common Corridor on the 23rd floor;ALT 1599208 Issued 6/13/24
24-105 - LinkSqaures 8th Fl Tenant Fit Out Office Renovation - Fire Alarm Alterations
24-105 - LinkSquares office tenant fit out
HVAC CONTROL WIRING ON THE 8TH FLOOR
Interior office space renovation of a portion of the 8th floor of 60 State St. Scope includes new partitions, acoustical ceiling, finishes, and necessary make-safe of fire protecti…
Erect 20x60 and 30x60 tents on 8/9/24, removal on 8/10/24.
Installation of Plumbing for a Kitchen sink on the 8th Floor,
8 Security devices installed on the 23rd floor of 60 State St for tenant Lando Anastasi (TK246225)
Electrical Fire Alarm work for a Tenant Fitout on the 23rd Floor. Installation of a new Control Module and a speaker/strobe
Tenant ENI 19th Floor - Office Renovations of an existing office space, installing new light fixtures and power furniture feeds for office.
Interior office space selective demolition of the 8th floor of 60 State St. Scope includes selective demo, and necessary make-safe of fire protection, plumbing, mechanical and elec…
HVAC CONTROL WIRING ON THE 19TH FLOOR
Electrical Work Associated with Tenant Fitout on 23rd Floor. Adding new Exit Signs and receptacles.
Create new common corridor on the 23rd floor to include removal of existing finishes & new lighting, new & relocated sprinkler heads, new & relocated fire alarm devices, no plumbin…
Minor interior work in existing office space for tenant (ENI Next) on the 19th Floor to create a new office. Includes constructing a gyp soffit, installing acoustical ceiling, ligh…
Provide power to light pole in sidewalk at 60 State Street.. Install a handhole in the sidewalk and conductors to Eversource manhole. Install Htap and 30 amp fuse to power cellular…
Installation of (2) VAV boxes Installation of (2) communication wires back to IBAS main panel. @ 53 State Street Boston, MA
Offices, Restaurant, Bank, Retail, Daycare , Event Space with Offices and Full KitchenCertificate for Offices - 7th FloorALT1472414 Issued 6/7/2023 &; A1562492 Issued 3/14/2024
Provide card access takeover of existing card access system with new equipment for base building system and turnstiles.
S24-343 Provide Labor and Materials to install the manufacturers provided electrical interconnections between the added workstations using the provided circuitry.
Interior 7th Floor Core Men's and Women's Restroom Renovation. Scope includes selective demo, drywall, tile, painting, lighting, finish updates, and necessary fire protection, plum…
Installation of CCTV security devices at Lookout Inc 60 State St Suite 1910 Boston MA 02109 (8-61918-02)
Offices, Restaurant, Bank, Retail, Daycare , Event Space with Offices and Full Kitchen;Certificate for Offices - 21st FloorALT1502147 Issued 8/30/2023
To legalize existing outdoor seating
Installation of Access security devices at Lookout Inc 60 State St Suite 1910 Boston MA 02109 (8-61918-01)
Erect 12'x24'x24" platform on 3/3/24, removal on 3/6/24.
HVAC CONTROL WIRING ON THE 7TH FLOOR
Installation of plumbing for a tenant fit out on the 7th floor.,
OME JOB#23-147 60 State St 7th Fl Linksquares. F&I new fire alarm devices into the existing system on the floor.
OME JOB#23-147 60 State Street 7th Linksquares. F&I lighting, power, panelboards, & hvac power per the engineer's drawings.
OME JOB#23-114 60 State Street 7th Fl Landlord Electric Room. Demo (4) electric panels. Furnish and install (1) electric panel.
Network wiring for LinkSquare on the 7th floor
Relocating fire alarm devices on the 21st Fl (Ameriprise).
Erect (2) 4x16x8", 12x16x16" and 4x16x32" platforms on 10/17/23, removal on 10/19/23.
Moving low voltage(access control) from one door to a newly install door. Moving Camera wiring and reception door release button due to construction
renovation to the 21st floor
: TD Demo and Furnish & Install 20 data locations @ 60 State Street Floor 21
Offices, Restaurant, Bank, Retail, Daycare, Event Space with Offices and full kitchen.Certificate for Office Space 14th &; 15th Floors.ALT1439189 Issued March 20, 2023
The project consists interior renovations to include updates to walls, flooring, ceiling, and architectural finishes as well as MEP upgrades. This project will include minor fire p…
Tenant Fit Out
Installation of Building Fire Alarm System
19th Floor Renovation to common corridor and lobby - new finishes (flooring, ceiling, millwork) and new and reworked MEPS
**Reference ALT1505719** 19th floor lobby & corridor renovation to include removal of ceilings, flooring, lighting, rough electrical , framing new ceilings and turn sprinkler heads…
S23-777 Provide Labor and Materials to install manufacturers jumpers between the added workstations using the provided circuitry
Interior office space build-out on the 7nd floor of 60 State St. Scope includes selective demo, millwork, DFH, glazing, drywall, ACT, flooring, painting, appliances and necessary f…
HVAC CONTROL WIRING ON THE 14TH & 15TH FLOORS
Offices, Restaurant, Bank, Retail, Daycare , Event Space With Offices And Full Kitchen;Certificate for Offices - 22nd FloorALT1408948 Issued 1/25/2023
Installing fire alarm devices in tenant space on floor 14 & 15. (Linksquares, PH2)
Installation of new 250A panelboard, 75KVA transformer and (10) EV Chargers
Install wiring within office cubicles on 2nd floor for Prologis.
Moving of two water closets one on the 14th floor one on the 15th floor,
Installation of data drops on floors 14 and 15 for the Linksquares project.
Selective remodel of tenant space on 14th and 15th floors
Offices, Restaurant, Bank, Retail, Daycare , Event Space With Offices And Full Kitchen;;Certificate For Office 15th FloorALT1423645 Issued 1/23/2023
Interior office space build-out on the 14th and 15th floors of 60 State St. Scope includes selective demo, millwork, DFH, glazing, drywall, ACT, flooring, painting, and necessary f…
Erect 8x16x24" high platform on 3/16/23, removal on 3/16/23.
Renovations on the 19th Floor to include building 2 new non bearing office partitions, add power, lighting and paint, new demountable front and relocate up to 2 sprinklers. Not str…
Offices, Restaurant ( w / Live Entertainment ), Bank, Retail, Daycare , Event Space with Offices and Full KitchenCertificate for Offices 35th FloorALT1318399 issued 5/9/22, A136032…
Installation of lights and wall switches on the 19th floor of 60 State Street.
Furnish & install 3 - data locations
Installation of the electrical interconnections between added workstations using provided circuitry. S23-254 Hub Office 60 State St, 15th Floor - "Linksquares" Workstation Electric…
Data cabling for Prologis workstations on 22nd floor
Data cabling for Prologis on 22nd floor
Sound management system for Prologis on 22nd floor
Offices, Restaurant, Bank, Retail, Daycare , Event Space With Offices And Full Kitchen;Certificate For Office - 21st FloorALT1395481 Issued 11/1/2022
Installation of two coffee sinks
Install wiring within office cubicles on 21st floor for Cross Country Consulting.
Install new Indigo Vision CCTV System and a new video intercom system at the front double doors
Prologis - 22nd Floor- Modification of office fronts. Replacement of finishes include millwork, carpet, ACT, paint. No structural work. Interior work only.
Installing new fire alarm device in storage room on the 15th floor. (Linksquares)
Interior office renovation on the 15th floor of 60 State Street to include selective demo, new architectural finishes including drywall and paint, and fire alarm work.
Installation of network locations on the 15th Floor.
OME#23-022 Prologis - 60 State Street 22F. Furnish and install fire alarm devices, wiring and programing per engineers drawings.
OME#23-022 Prologis - 60 State St. 2F. Furnish and install electrical lighting, wiring and devices per engineers drawings.
Installing card readers to secure door. Door Controllers to support card readers
Install new fire alarm devices in tenant space on floor 21. (Cross Country)
Offices, Restaurant, Bank, Retail, Daycare , Event Space With Offices And Full KitchenCertificate for: Offices - 22nd FloorALT1336271 Issued 6/24/2022
Install one 120/208 volt panel and 10 furniture feeds
Renovation to existing space to suite new tenant fit out.
HVAC CONTROL WIRING ON THR 22ND FLOOR
Renovation of existing space
Install wiring within office cubicles on 22nd floor for TriTower.
Service Ticket 366093 - (18) single Tele/data outlets and AV cable to three conference rooms.
Install wiring within office cubicles on 35th floor for Longfellow Real Estate Partners.
Office Renovation of the 21st Floor. New partitions, new finishes (flooring, glass, paint, millwork). Rework & New MEPs to accommodate new layout.
Interior office renovation on the 15th floor of 60 State Street to include selective demo, new architectural finishes including drywall and paint, No new fire alarm or sprinkler wo…
Offices, Restaurant ( w / Live Entertainment ), Bank, Retail, Daycare , Event Space with Offices and Full KitchenTemp. Certificate for:;Offices - 35th floor Valid;for 90 Days Expir…
DGI will be installing all AV systems and equipment for Longfellow Real estate. This includes office, large meeting rooms, Medium conference rooms, Reception areas and flex spaces.…
Cabling for 30 speakers Misc. AV cabling in 11 Rooms throughout the space @ 60 State Street, 35th Floor
Offices, Restaurant, Bank, Retail, Daycare , Event Space With Offices And Full Kitchen;Certificate For Offices - 36th And 37th FloorALT1323910 Issued 5/2/2022
DATA WIRING FOR TRITOWER FINANCIAL, 60 STATE STREET, 22ND FLOOR.
OME#22-162 Tritower Financial - 60 State Street 22F. Furnish and install electrical lighting, wiring and devices per engineers drawings.
Pothole repairs in Loading Dock followed by Waterproofing
OME#22-162 Tritower Financial Group - 60 State Street 22F. Furnish and install fire alarm devices and wiring per engineers drawings.
Job #16332 Sam Adams 1st floor Relocate (4) existing fixtures, install (5) new fixtures and (2) new switches.
Offices, Restaurant ( w / Live Entertainment ), Bank, Retail, Daycare , Event Space with Offices and Full Kitchen;Certificate for: Office(s) 13th Floor.ALT 1282341 issued 2/11/22,…
OME#22-148 Tritower Financial Demo - 60 State Street 22nd Floor. Demo and make safe with Temps.
Longfellow Real Estate - 35th Floor -; Additional work on Rooftop Terrace.; Provide wheelchair access onto terrace.; Modify existing Life Safety / Fire Alarm devices.; ; Work is be…
5 security devices on the 13th floor of 60 State St for tenant Alter Domus (JV)
Network wiring for Longfellow on 35th floor
Low Voltage Cabling for A/V 60 State Street 37th Floor Sidley Austin
Installing new fire alarm devices in tenant space on the 37th floor. (Sidley Austin)
HVAC CONTROL WIRING ON THE 35TH FLOOR
HVAC CONTROL WIRING ON THE 37TH FLOOR
Tritower, 22nd floor- Modification of offices and conferences rooms. Replacement of finishes include millwork, carpet, ACT, paint. No structural work. Interior work only.
Installing plumbing fixtures in bathroom on 37th floor
Install wiring within office cubicles on 13th floor for Alter Domus
36/37 floors low voltage data only 22-0170-10
Low voltage security system installation: Install new access control head end equipment to replace existing (no new wiring) at Longwood Venues 60 State Street, Boston Floors 33 & 3…
Renovation to the 35th Floor at 60 State Street for Longfellow.
Rework existing circuits for new offices
Renovation to the 35th Floor of 60 State Street for Longfellow.
Install pantry sink set up and wellness room sink set up as well as replace 6 water closets , 6 lavatories, and 3 urinals on 35th floor
Longfellow - 35th Floor -; Office Tenant fit-out on the 35th floor.; Work includes :; demo of existing space, surface prep, new drywall partitions, ACT, new lighting, millwork;and…
HVAC CONTROL WIRING ON THE 13TH FLOOR
Sidley Austin - 36 &; 37th Floors -; Office tenant renovations.; Work on the 36th floor will be minor in scope.; Work on the 37th floor will be a full fit-out.; ;Work includes: dem…
126 telecom drops on the 13th floor of 60 State St for tenant Alter Domus (RS227280)
Erect 12x20x 24" platform and (3) 8x12x12" high platforms on 4/11/22, removal on 4/12/22.
Installation of Plumbing for a Kitchen sink and wellness room sink on the 13th floor,
13th Floor. New interior fit-out of approximately 17,000 RSF of office renovation for Marketing Suite.;[ePlan] FT
OME 22-030 Renovation of 3/4 of the 13 Floor - Marketing Suite
OME22-030 Renovation of 3/4 of the 13th Floor
Minor demolition of existing non structural partitions and finishes. Layout and framing. Rough HVAC, rough electrical. Reference ALT1282341
Change Occupancy to include Live Entertainment - Sam Adams Tap Room