Building permit intelligence · Boston, MA
28 State St has 174 municipal building permits on file in Ward 3. The latest recorded activity was a electrical permit dated Jun 15, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 2 mapped permits within 500 m of this address.
Electrical
Electrical
Electrical
Electrical
Fire Alarm
Electrical
2 mapped permits within 500 m, shown on the intelligence map above.
6 other addresses on State St with municipal permit records in Boston.
This address has 174 permit records in PropertyLabs' public history and is located in Ward 3. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 28 State St is dated Jun 15, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 28 State St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Fire Alarm
Electrical
Fire Alarm
Electrical
Plumbing
Fast Track Application
Fast Track Application
Plumbing
Renovations - Interior NSC
Renovations - Interior NSC
Low Voltage
Low Voltage
Low Voltage
Plumbing
Plumbing
Plumbing
Plumbing
Electrical
Electrical
Electrical
Electrical
Renovations - Interior NSC
Electrical
Electrical
Renovations - Interior NSC
Fast Track Application
Low Voltage
Low Voltage
Low Voltage
Electrical
Fast Track Application
Fast Track Application
28 State St Evolution Credit Partners - Provide Labor and Materials to install the electrical interconnections for the added workstations using the provided circuitry
Low Voltage
Fast Track Application
Plumbing
16th floor - demo & temporary lighting, office fitout of lighting fixtures & controls, receptacles, mechanical power, 1 new panelboard fed off existing panel.
Low Voltage
Fast Track Application
Fast Track Application
HVAC CONTROL WIRING ON THE 16TH FLOOR
Fast Track Application
Fire Alarm
Fast Track Application
Plumbing
S24-899 - Connect workstation electrical to existing infrastructure wiring as specified. Approx 30 workstations
Fire Alarm
Fast Track Application
Spec Suite Renovation at 28 State 10th Floor.
HVAC CONTROL WIRING ON THE 28TH FLOOR
HVAC CONTROL WIRING ON THE 10TH FLOOR
Installation of Data for furniture
Offices, Stores and BankCertificate for Offices - 28th FloorALT1585394 Issued 4/10/2024 &; SF1586006 Issued 4/2/2024
Installing new fire alarm devices in tenant space on floor 28. (Spec Suite)
Installing new fire alarm devices in tenant space on floor 10. (Lubin Meyer)
Installing new fire alarm devices in tenant space on floor 40. (Lubin Meyer)
Installing new fire alarm devices in tenant space on floor 28. (Lathrop)
40th Floor - Installation of low-voltage telecommunications cabling.
10th Floor - Installation of low-voltage telecommunications cabling.
Job#24-085, 28 State Lubin & Meyers 10th Floor Tenant; Utility Meter 100A-277/480V 3P 4W, Tenant 100A-277/480V 3P 4W Dist. Panel, 30KVA Trans. Tenant 100A-120/208V Dist. Panel; Lig…
Job#24-084, 28 State Lubin & Meyers 40th Floor Tenant; Lighting, Lighting Controls, Branch Power Renovations for Tenant Space 40th Floor. Existing Distribution.
Job#24-083, 28 State Lathrop 28th Flr. Tenant; Lighting, Lighting Controls, Branch Power Renovations for Tenant Space 28th Floor. Existing Distribution
Low Voltage wiring permit for 37 sound masking speakers for Lathrop GPM at 28 State St 28th Floor
Installation of kitchen and wellness room in existing office space.
Network wiring for Lathrop on 28th floor
40th Floor- interior fit out in existing office space with architectural upgrades. MEP/FA/FP upgrades/alterations
10th Floor- interior renovations to an existing office space. Architectural upgrades & MEP/FP/FA alternations and upgrades.
Lathrop-New tenant renovation at a portion of a previous vacant suite. New office layout with offices, storage rooms, conference rooms and staff break area with standard office sui…
Installation of Plumbing for a kitchen sink on the 28th floor,
Installation of Plumbing for a kitchen sink on the 10th Floor,
Installation of Plumbing for a kitchen sink on the 40th Floor,
Build out of Spec Suite on the 28th floor to include new offices, conference room, call room and pantry/kitchen area, install new finishes, millwork, lighting, upgraded mechanical…
Renovation to the empty space into a Spec Suite.
HVAC CONTROL WIRING ON THE 28TH FLOOR
HVAC CONTROL WIRING ON THE 21ST FLOOR
HVAC CONTROL WIRING ON THE 40TH FLOOR
Installation of Plumbing for a kitchen sink on the 28th floor,
Installation of Plumbing for a tenant fit out on the 21st floor,
Low Voltage Wiring permit for Edelman Financial Engines at 28 State St 21st Floor
Tenant Fit Out
Renovations of existing tenant space on the 28th floor to include new conference room, new glass side lites at offices, new flooring, patching of ceilings, adding lighting, rework…
Extension of existing 28th floor space for shifting of tenant suite, includes new ceilings, lighting & flooring, rework existing HVAC, sprinkler and fire alarm work, no plumbing. E…
Installing new fire alarm devices in tenant space on floor 28. (Evolution)
Installing new fire alarm devices in common area on floor 28. (CC, 28th Floor)
Prep selective removal of finishes and MEP make safe for the upcoming tenant fit out on the 28th floor, ALT# 1585394 has been submitted for the Fast Track Build Out.
Selective Prep Removal of finishes and MEP make safe for upcoming tenant suite/common corridor work on the 28th floor. ALT# 1585370 has been submitted for this upcoming project.
Installation of plumbing for two kitchen sinks,
Project located on the 21st floor at 28 State st for Edelman Financial.
Installing new fire alarm devices in tenant space (21st FL).
Complete demo and build out of existing tenant space on the 21st floor for new offices,meeting rooms, open area for workstations, new kitchen & wellness room, new finishes, lightin…
Pulling cable to renovate tenent space.
28 State St 20 & 21st Floor, Stair way lighting zone separation.
On floor 21 infill slab at demolished interior stair from floor 20 to 21, includes structural steel, drywall patching, minor lighting, 2 sprinkler relocates if needed, concrete wor…
Replace sealant at all locations at one elevation.
Offices, Stores, Bank;;Certificate for Offices - 10th FloorALT1459265 Issued 4/26/2023
27 telecom drops and 3 security devices on the 10th floor of 28 State Street for tenant Gordon Rees (MD236205)
HVAC CONTROL WIRING ON THE 10TH FLOOR
Installing new fire alarm devices in tenant space on floor 10. (Gordon & Rees)
OME#23-033 10th Floor Spec Suite & Common Area - 28 State St. 10F. Furnish and install (3) new 100/125 Amp utility meters.
Offices, Stores and Bank ;Certificate for Offices Floors 25th-27th; &;; 32nd-35th.ALT1037980 Issued January 21, 2020
Installation of plumbing for a kitchen sink on the 10th floor,
renovations of existing office space
Office renovation on the 10th floor to include: selective demolition, drywall, flooring, ceiling, millwork, painting, etc. Renovation includes new MEP systems (HVAC, electrical, pl…
Offices, Stores, Bank;;Certificate For Offices;10th Floor - Spec Suites ;;Alt 1427585 Issued 1/3/23
installation of 30 cat 6 plenum rated cables for wifi and lan use
3 security devices on the 9th floor of 28 State St for tenant SV Health Investors (MD-WO-47496)
3 security devices on the 10th floor of 28 State St for tenant Woodruff Sawyer (MD-WO47415)
installing basefeeds, receptacles and jumpers in 20 modular workstations
Offices, Stores, Bank ;Temporary Certificate For Offices Floors 25TH - 27TH And 32nd - 35TH Expires 6/6/22 Pending Completion Of Phase ProjectALT1037980 issued 1/21/20
installation of cat 6 cable for network use
Provide new mainline disconnects, car light disconnects, lighting, and branch circuit wiring related to elevator modernization, in accordance with all applicable NEC and ANSI regul…
HVAC CONTROL WIRING ON THE 10TH FLOOR
Installation of Plumbing for a kitchen sink on the 10th floor,
Low voltage building automation and controls @ SV Health, 9th Floor, 28 State Street
OME#23-030 SV Health - 28 State Street 9F. Furnish and install electrical lighting, devices and wiring per engineers drawings.
Offices, Stores, Bank;Certificate For Offices 15th Floor - OnlyALT1375566 Issued 8/29/2022
Renovations to existing tenant space on the 9th floor for "SV Health" to add new offices, copy room and coat closet includes new walls, finishes, glass & relocated HVAC and lightin…
Installing new fire alarm devices in tenant space on the 10th floor. (Spec Suite 2 & Common Area)
OME#23-033 Spec Suite #02 & Common Area - 28 State Street 10F. Furnish and install electrical lighting, gear, devices and wiring per engineers drawings.
Installation of one new camera and access control on 15th floor door. Cabling done by others.
10th Floor - Spec Suites -; Minor demolition, construct new interior walls, all new finishes (flooring, millwork, ceilings) and rework existing MEP's, Fire Alarm and Sprinkler syst…
Offices, Stores, BankCertificate For - Offices - 9th FloorALT1361325 Issued 7/21/2022
Offices, Stores, BankCertificate For Conference Room &; Kitchen On 9th FloorALT1361293 Issued 7/21/2022
In existing office space on the 16th floor, Demo of drywall partitions, patching of ceilings, replacement of glass for conference room, no sprinkler or fire alarm work.
Installing new smoke detector in electric room on the 15th floor. (Citizen's Bank)
22-0214-10 Citizens Bank 15th floor
13th Fl. UPS upgrade Add new UPS panels on 13 and 15th floors .Refeed existing equipment on 13
Demo/make safe, relocate existing light fixtures and controls. Add power for convenience and furniture locations
Demo/make safe, relocate existing light fixtures and controls. Add power for convenience and furniture locations
Installing new fire alarm devices in tenant space on floor 9. (Spec Suite)
Installing new fire alarm devices in tenant space on floor 9. (Conference Center)
Citizens Bank - 15th Floor -; Interior renovation of existing Office space on the 15th floor at 28 State St to include selective removal of finishes, new architectural finishes suc…
Installation of plenum rated cat 6 for network use
Installation of plumbing for a tenant fit out on the 9th floor
Installation of plumbing for a tenant fit out on the 9th floor
Installation of plumbing for a tenant fit out on the 29th floor
Plumbing
OME#22-151A Conference Center - 28 State Street 9th Floor. Furnish and install electrical lighting, wiring and devices per engineers drawings.
OME#22-151B Spec Suite - 28 State Street 9th Floor. Furnish and install electrical lighting, wiring and devices per engineers drawings.
Conference Center - 9th Floor -; On the 9th floor, Build out of new Conference Room &; pantry area, all new lighting, flooring, ceiling, glass fronts, millwork, added/relocated spr…
Spec Suite - 9th Floor -; Renovation of existing office space on the 9th floor, scope: install new drywall, paint, flooring, ceilings, lights, Kitchen millwork, plumbing, glass doo…
Installation of Plumbing for a sink on the 36th floor,
28 Street AHU 9th & 10th Fl. Power Wiring for (2) AHU's, (2) Disconnect Switches. AG-220349
Selective removal of architectural finishes on 10th Floor. Minor electrical and HVAC work.
Electrical make safe/Demolition of existing office space
Offices, Stores, BankCertificate for: Offices 29th &; 31st fl.ALT1212103 issued 9/15/21
Add two old work duplex receptacles. Relocate one light switch
Drill one boring to a depth of approximately 90 feet below ground surface for proposed elevator
28 State Street AHU 9th & 10th Fl . Misc. Low Voltage HVAC Control Wiring - AG - 220349
Interior office renovation on the 22nd Floor at 28 State Street to include minor selective removal of finishes, new architectural finishes such as carpet, paint, GWB patching, ACT,…
Offices, Stores, BankCertificate for: Lobby 1st floor-only;Alt1113379 - 10/19/20
Install wiring within office cubicles on 23rd floor for Bridge Bank
Network wiring for Hollister on 23rd floor
Renovation to the 28 State the 23rd Floor for Hollister.
Job# 21-0160-10 Hinkley Allen 31st fl Tel/Data only
This project consists of interior demolition applied for under separate short form permit, interior fit out consists of new ACT ceiling, new DFH, new GWB partitions and soffits, ne…
Installation of a card access control system on the 31st floor at 28 State Street for Murphy & King.
Plumbing renovation work for Citizens Bank
Offices, Stores, BankTemp. Certificate for: Lobby 1st floor East Side Phase 1- only Valid for 90 Days, Expires 11/12/21 pending completion of permitAlt1113379 - 10/19/20
Installation of (40) dual data locations - 50 pair voice feed cable across Hall.
renovation to the 31st floor and 29th floor
miscellaneous interior demolition including: carpet removal, demo & removal of doors and frames, and demo of drywall partitions
Installing new fire alarm devices. (Murphy & King)
S21-541 Installation of electrical interconnections between added workstations using provided circuitry
Installing new fire alarm devices in 23rd floor tenant space. (Bridge Bank)
Renovation of existing office space
Elec App. Per BPDA approval 4-22-21 replace signs for Citizens. E01 reface existing monument and remove electric components; E03, E05, E06 10" halo lit letter sets on backer panel;…
Plumbing renovation work for Bridge Street