Building permit intelligence · Boston, MA
296 State St has 115 municipal building permits on file in Ward 3. The latest recorded activity was a gen permit dated Jul 1, 2026. Permits at this address represent $5MM–$25MM in total declared construction value. PropertyLabs also identified 7 mapped permits within 500 m of this address.
Generators
Generators
Generators
Renovations - Exterior
Renovations - Exterior
Gas
7 mapped permits within 500 m, shown on the intelligence map above.
6 other addresses on State St with municipal permit records in Boston.
This address has 115 permit records in PropertyLabs' public history and is located in Ward 3. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 296 State St is dated Jul 1, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 296 State St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Gas
Plumbing
Gas
Plumbing
Electrical
Electrical
Generators
Electrical
Plumbing
Renovations - Exterior
Electrical
Yearly maintenance permit from 9/25/24 to 9/24/25 I believe this is a $310.00 charge.
S23-001 Furnish and Install new class II HVAC Controls infrastructure and circuity for the chiller plant to replace end of life and unsupported controls equipment
Plumbing
Gas
Low Voltage
Plumbing
Fire Protection/Sprinkler
Plumbing
Plumbing
Renovations - Exterior
Electrical
Fire Alarm
Fire Alarm
Fire Alarm
Electrical
Relocate 12 speaker strobes
wire 32 speakers
new lighting , lighting controls and speakers system in main ball room and adjacent area.
Boston Marriot Long Wharf - Remove and replace Ballroom acoustical ceiling. Coordinate new lighting HVAC and sprinkler locations.; ; ; ; ; ; ;E- Plans
Marriot Long Wharf Hotel: Renovation to guest elevator vestibule
Raise Ballroom guest elevator vestibule landing to align with Lower Lobby floor. Infill and relocate guest elevator opeings and controls to proper locations. Install new accessible…
In the main lobby. Install 8 recessed light fixtures
Front Desk Market - Remove and replace retail casework, lighting, and wall finishes. market space to be renovated including, Install new decoative barn door at Market entrance.
Disconnect and reconnect (2) AHU’s and (2) Exhaust fans serving kitchen Location: 1st floor mechanical room & roof. PP128
Swap out brown devices for white ones. Disconnect the 12 wall sconces. Store and reinstall when wall finish is done. Disconnect and remove 12 surface mount lights. Replace with rec…
Selective concrete repair, selective re-pointing of mortar joints, selective removal and re-caulking of joints, and re-coating of garage floor.
Update existing finishes in function room spaces; paint, wallcovering, carpet, and lighting.
Hotel, Retail, Restaurant, Parking Garage Certificate For (3) Additional Hotel Guest Rooms-;7th Floor - Only Alt 777385 issued 1/31/18
Temporary power distribution 9/29/19-10/5/19
Temporary power distribution 9/7/19-9/16/19
Temporary power distribution 8/19/19-8/25/19
Temporary power distribution 8/5/19-8/11/19
lighting retrofit , re lamp and re ballast only
Replacing 12" soil pipe in the mechanical area
Removal of basement drywall and exposed 12" sewer line for replacement.
Renovation of an existing hotel bar area with associated electrical wiring.
Starbucks renovation
Renovation of an existing Starbucks with associated electrical work in the lobby of the Boston Marriott Long Wharf Hotel.
Renovation of an existing Starbucks in the lobby of the Boston Marriott Long Wharf Hotel. Relocating 2 pull stations & adding 1 horn/strobe device to the existing fire alarm system…
STARBUCK Marriott Lobby Area-Replace mill-work, sink and upgrade finishes. All work will be in full compliance with 780 CMR,527 CMR, 521 CMR. No changes to egress or life safety sy…
Replace mill-work, sink and upgrade bar back finishes. All work will be in full compliance with 780 CMR,527 CMR, 521 CMR. No changes to egress or life safety system.
Hotel, Retail, Restaurant, Parking Garage Certificate for: ;Marriott Long Wharf - M Club - 1st floor Mezzanine Private Dining Area-Only Alt 797647 - 3/2/18
884737 - Long Wharf Marriot M Club - Install two new floor drains and associated piping for counter top units.
2 fire pits on outside deck
Replace 425 line voltage local smoke detectors
Marriott Long Wharf - M Club - 1st floor renovation for new mezzanine and ADA lift renovation to finishes, install drywall partitions to create a private dining area work includes…
1 st floor fire
1 st floor Marriott hotel
6th floor fire alarm
6th floor boston hotel
Marriott Long Wharf - Relocation of thermostats and replacement of controls on VAV Boxes
Prep demo for new M club space begin layout and framing for new space
Replace meeting room carpets replace wall covering in meeting room and ball room and replace lighting fixture.
Install fiber optical into 213 rooms and install Corning GPON Network Equipment
Marriott Long Wharf - 7th Floor - Change Occupancy to include 3 additional Guest Rooms for existing Hotel Use.; There will be a;conversion from a concierge Lounge to 3 additional G…
Replacement of fixtures
7th floor - remove walls, flooring and finishes;and begin layout
Renovation of Guest rooms 1-7th floors paint and new carpet in corridors
1 st floor minor renovation to 413 rooms
Provide temporary 30kW diesel generator and all GFCI outlets for vendors at Chowderfest event at Christopher Columbus Park, adjacent Atlantic Ave. and Mercantile Street. All equipm…
To repair electrical work that was damaged by water.
Refeed the fire pump with MI Cable at the Long Wharf Marriot
Run power from a temporary generator to the fire pump motor controller
Strip and re roof.
Install Temporary banner per BRA stamped drawings.;Replace existing;perminant wall sign with new per BRA stamped drawings.Signs are for Retail;ticket sales space. "City View";
Masonry Wall Repairs
Install 2 120 volt 20 amp. circuits behind the laundry area for two new domestic hot water heaters.
erect pipe staging install metal at rear of building along roof line wet glaze slop windows on roof
install 2 gas water heaters
install 2 gas fired water heaters
LOCATION IS AT 66 LONG WHARF - Temp generator power for film production (AND ONLY GENERATOR POWER FOR PRODUCTION) Set 11-22-13
Window Recaulking & Masonry repointing.
We are installing heaters outside of the Marriot front doors for the valet people.
Repair concrete on garage floors. Repair masonry units as needed. Install waterproofing on garage floor.
Bond/ground temporary generator
Adding horn/strobe to the new public bathrooms
Wiring a new public bathroom
installing plumbing work for new rest room
installing 2 new public bathrooms in parking garage. including plumbing/electrical/HVAC/sprinkler/fire protection and arch. finishes. LPR BIN
Install an elevator recall system for the hydraulic elevator
Parking garage, Hotel, Retail, Restaurant/Lounge , function room;and fitness center, C/O-For Restaurant/Lounge- 2nd, fl., Function Room-2nd .fl.,;Fitness Center; &; Lobby- 1st.fl.-…
Install internally illum letter set to read: Marriott Long Wharf. Install two internally illum wall plaques at entrance. Install one set address numbers and letters. Per BRA Design…
Hotel, Retail, Restaurant, Parking Garage. C/O For:;Restaurant/Lounge 1st floor, Function room 1st.fl. -only **Temp. Cert. Expires - Nov. 27,2011 - pending completion of permit**
Install 2 floor drains, 1 hot water tank, 10 lavs, 1 slop sink, 5 urinals, 18 water closets on the 1st floor
Install new revolving entrance door, pavers, concrete slab flush to exterior and storefront on ground floor. Remove existing and install new exterior canopy. Install new steel over…
fire alarm
Install 1 disposer, 9 floor drains, 4 hand sinks on 1st floor Install 4 floor drains, 4 laundry trays, 2 shower stalls, 1 slop sink, 1 urinal, 3 water closets on the 3rd floor
fire alarm
Partial renovation 1st Floor Reception, Restaurant and Function Room
Partial renovation Ground Floor Lobby and add new Restrooms on 1st Floor
FIRE ALARM
Marriot Long Wharf Floors 1 &; 3 - Renovate existing reception area, restaurant and lounge, function room and the fitness center. work includes demolition, carpentry, drywall, carp…
add two pull stations change out three smoke detectors on existing wiring
partail renovation
Renovate lower lobby and first floor. Work includes new tile floor, new finishes, paint, new light fixtures, removal of existing skylight. Install new glass at escalator openings.…
- Install new through wall flashing at terrace window heads - Installation of new terrace waterproofing system at terraces - Installation of new pedestal paver system at terraces -…
; Parking garage, hotel, retail, Restaurant C/O- For (5) Meeting Rooms- 2nd fl.- Palm Garden Court -Only permit#0542, issued 10/2/09
Remove all the romex from the meeting space
Long Form/Alteration Permit · FSTTRK · Jul 21, 2026