245 Summer St has 205 municipal building permits on file in Ward 3. The latest recorded activity was a electrical permit dated Jul 8, 2026. Permits at this address represent $25MM+ in total declared construction value. PropertyLabs also identified 2 mapped permits within 500 m of this address.
Electrical
Fast Track Application
Fast Track Application
Fire Alarm
Fire Alarm
Fire Alarm
2 mapped permits within 500 m, shown on the intelligence map above.
12 other addresses on Summer St with municipal permit records in Boston.
This address has 205 permit records in PropertyLabs' public history and is located in Ward 3. The city figures below provide context without changing the focus of this exact-address record.
City coverage counts address-linked rows and does not add overlapping canonical tables. Rolling windows are inclusive, use UTC boundaries, and end Aug 1, 2026.
PropertyLabs compiled this permit history from municipal public records for Boston, MA. The latest recorded permit activity at 245 Summer St is dated Jul 8, 2026. Municipal records can be corrected or updated after publication.
See the contractors, applicants, permit holders, permit numbers, and project documents associated with 245 Summer St in the PropertyLabs platform, along with alerts when new permits are filed at this address.
Electrical
Electrical
Electrical
Renovations - Interior NSC
Renovations - Interior NSC
Electrical
Fire Alarm
Electrical
Replacement of existing Foam water Fire Suppression system which provides fire protection for fuel tanks that feed the emergency generator.
Low Voltage
Job #18338 Fidelity 2nd Floor Demo, make safe, and rework existing feeders for UPS system.
Job #18360 Fidelity 3rd Floor Demo existing furniture & install (1) duplex receptacle & (4) walker duct quad receptacles.
Renovations - Interior NSC
Electrical
Low Voltage
Electrical
Fast Track Application
Fire Alarm
Electrical
Demolition - Interior
Fast Track Application
Renovations - Interior NSC
Electrical
Plumbing
Fire Alarm
Electrical
Electrical
Renovations - Interior NSC
Electrical
Electrical
Electrical
Electrical
Fire Alarm
Electrical
Plumbing
Fast Track Application
Fire Alarm
Electrical
Fast Track Application
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Low Voltage
15673- FIDELITY 245 SUMMER STREET 3RD FLOOR DISCONNECT, REMOVE, & RELOTAE DEVICES TO SUPPORT DOOR RELOCTAION SCOPE
15663 245 Summer Street 5th Floor Electrical make safe demo, remove/relocate (3) exits, install new exit, power for card reader door
Build new demising walls on 5th Floor at 245 Summer including reworking of existing exit signs and relocating of sprinkler heads as required for coverage. E plans
Wire replacement hydraulic pumping units, install conduit for four(4) replacement vehicle barriers. terminate heat, proximity switches and manual controls.
Job #15567 Fidelity LL, 1, 15, & 16 floors Makesafe/disconnect existing conduit & provide new receptacles at existing locations.
Job #15570 Fidelity floors 2, 5, & 14 AV upgrades & power
Job# 21-0114-10 Fidelity 551 cables
Job #15525 Fidelity 1st floor Make safe demo & renovation
Job #15517 Fidelity 14th floor Furnish and install (2) rec wall wash fixtures & (6) artichoke fixtures.
Job #15483 Fidelity Makesafe electrical demo, barrier controller power, and barrier heater power.
Replacement of 2 existing fire pump controllers in basement for Fidelity.
Job #15411 Fidelity Install lobby dimmer switch and exterior receptacle.
Replace and Relocate 2 Fire alarm Control Panels & 1 jockey control panel, rewire 2 new pumps
Replacement of existing operable vehicle wedge barriers outside of the loading dock.
Job #15382 Fidelity 1st Floor Elevator machine room damper scope
Job #15382 Fidelity 1st Floor Elevator machine room damper scope
Job #15343/15344 Fidelity Floors 2, 9, 13, 14 Power & ring and string provisions for AV & data.
Offices, Research Lab, Commercial and Accessory Café; Certificate for;Offices 5th &; 9th floor-Only Alt 1038608 issued 2/4/20;
Job #15323 Fidelity 1st Floor Power Provisions for Lobby Digital Art Display
This is to amend our previous permit#ALT1038608. In this amendment, floors 6 and 8 were cancelled from the scope of the project. Floors 5 and 9 have stuck to the original plans.
Offices, Research Lab, Commercial and Accessory café Certificate for Offices &; Food Storage Space-Lower Level Alt 1066492 issued 5/29/20
Job #14974 Fidelity 1st floor Remove & Deprogram FA control module (1) and remove & relocate existing FA pull station (1) on the Channel Side. Remove & relocate FA Pull station (1)…
20-0031-10 Fidelity-Art Storage Lower Level-12 cables
Job #15082 Fidelity Floors 2, 3, 5, 8-14 Install Fidelity COVID Tracing System Anchors Phase 2
243 Summer St. 2nd & 3rd floors-Amazon Boston-110 tel/data devices Job# 20-0151-10
JOB#15026 & 15027 FIDELITY- THINK SPACE & EGG ROOM REM &REPLACE (22) LED COV FIXTURES REMOVE & REPLACE (45) PENDANT FIXTURES & (23) PENDANT DOWN LIGHTS EXITING WIRING WILL BE USED…
JOB#15013 & 15024 FIDELITY INSTALL (3) DEDICATED OUTLETS FOR COFFEE MAKERS (1) RECEPTACLES FOR DIGITAL SIGNAGE
Modifications to two existing building entries to create environmentally controlled vestibules. Minor interior architectural modifications including new millwork and furniture.;;;;…
Job #14974 Fidelity 1st floor 245 Summer Entries Renovation
Job #14959 Fidelity floors 1, 4, & 7 Install power for a COVID Tracing System.
RENOVATION OF EXISTING OFFICE AND FOOD STORAGE SPACE. WORK INCLUDES CONSTRUCTION OF NEW INTERIOR PARTITIONS, LIMITED RECONSTRUCTION OF EXISTING CEILING TILES AND LIGHTING, ADDITION…
Job #14918 Fidelity Lower Level Renovation of Corp Art Area & cold storage area
Job #14918 Fidelity Lower Level Renovation in Corp Art Area & cold storage area.
Installation of card access and camera devices for security purposes on floors 5, 6, 8, and 9.
Install wiring within office cubicles on floors 5 - 9 for Fidelity
Job# 20-0031-10 Fidelity floors 5-6 & 8-9 1,485 cables
The project scope is to renovate finishes and re-work convenience power on portions of the 5th, 6th, 8th, &; 9th floor. There will be some selective partition demo, new flooring, t…
Demo and relocate one mothers room sink
Job #14721 Fidelity Renovation - 5th floor
Job #14721 Fidelity Renovation - 5th Floor
Job #14721 Fidelity Renovation - 8th Floor
Job #14721 Fidelity Renovation - 9th Floor
Offices, Research Lab, Commercial and Accessory Café; Certificate for:; Offices - 10th floor ALT1014831 - 11/1/19
Job #14701 Fidelity Remedial electric work 2nd floor
Job #14653 Fidelity 1st Floor Cafeteria equipment renovation & upgrade.
Job #14675 Fidelity 1st floor Electrical wiring for (3) new Vollrath kettles.
Job #14673 Fidelity 1st floor F/I (1) dedicated 40A circuit in kitchen for panini machine.
Project consists of removal of carpet flooring, and selective interior partition demolition. Work takes place on levels 5, 6, 8, and 9 of 245 Summer Street in Boston, MA.
Job #14623 & 14624 Fidelity Floors 5 & 9 Furniture & workstation disconnect & make safe.
Job #14600 Fidelity Furniture renovation 4th floor HR space
Job #14541 Fidelity 1st Floor F/I added outlets in the Cafe.
Job #14536 Fidelity 7th floor F/I (4) dedicated receptacles.
Job #14533/14534 Fidelity Floors 6 & 8 Demo & make safe power to cubicles & floor devices.
Job# 19-0524-10 Fidelity Investments 10th fl 490 cables
Job# 19-0523-10 Fidelity Investments 10 & 12th fl 96 cables
Job #14486 Fidelity 10th Floor Renovations
Job #14486 Fidelity 10th Floor Renovation
Fidelity - 10th Floor: Scope consists of re-working existing office space on the 10th Floor of 245 Summer Street for Fidelity investments (apprx. 18,100 SF). We will be removing fu…
Job #14497 Fidelity Renovation in Capital Markets disaster relief area lower level.
Job #14497 Fidelity Renovation in Capital Markets disaster relief area lower level.
Job #14492 Fidelity 10th floor Remove & replace (2) 100A MLO panels at FTR rooms.
Job #14485 Fidelity Floors 10 & 12 Demo & make safe, new lighting control wiring for 3 devices.
Fidelity - Lower First Floor Level: Furnish and install a new partition to separate existing office space. Work to include patching of finishes as needed, reworked lighting, reloca…
Job #14440 Fidelity 8th floor Renovation to tenant space.
Job #14440 Fidelity 8th Floor Renovation in tenant space
Offices, Research Labs, Commercial, Accy Cafeteria Certificate for the 2nd floor Office ALT913196 issued: 2/8/19
Job #14352 Fidelity 1st Floor Replacement of damaged switchgear.
Job #14321 Fidelity Remove & replace existing exterior alley lighting & replace w/LED.
Job #14320 Fidelity 14th Floor F/I (1) WM6 ATC floor box w/branch wiring and under floor conduits.
Job #14319 Fidelity 6th floor copy room conversion.
Job #14309 Fidelity 1st floor Cafe Salad bar renovations
Renovations to existing office spaces to install new floor cores on floors 2, 3 and 8 for "Fidelity Real Estate Company."
Job #14282 Fidelity 13th Floor Workstation reconfiguration
Job #14255 Fidelity Floors 2, 3, & 8 F/I (23) new power floor cores, devices, and (2) receptacles.
Job #14264 Fidelity 3rd Floor (5) Cores in Walker duct w/power only.
Job #14180 Fidelity 3rd Floor Office Configuration
Job# 19-0209-10 7th Fl-Fidelity
Job #14102 Fidelity LL Chiller Plant De-energize (3) switchboards from Eversource vault for PM & installation of new sections of 3000A bus duct. Switchboards to be re-energized aft…
Job #14043 Fidelity 1st Floor Kitchen restoration project (waterproofing)
Job #14019 Fidelity Chiller plant De-energize main MSB-A & MSB-B
Job #14019 Fidelity Floors 1-14 Re-locate feeders floors 1-14 and install Bus Duct D
Job No. 884861 Install new sump pumps and associated piping.
Open walls for relocation of existing plumbing drains.
Renovations 80 voice/data locations Job# 19-0085-10
Minor renovations to existing second floor office space consisting of new lighting and power upgrades
Renovations to existing 2nd floor space with minor fire alarm modifications consisting of new speaker strobe and strobe only devices
Renovation to office space.
Interior Office renovations with repiping of approximately 70 sprinkler heads.
Job #13929 Fidelity Lower Level Remove all temporary wiring. Energize switch gear c. Re-terminate existing feeds.
Job #13928 Fidelity Lower Level Demo switch gear from fire in lower level.
Job #13885 Fidelity Basement Temp feeding (2) 3000A risers from existing swtichgear & clean & preventative maintenace on (2) 4000A switchboards
Job #13857 Fidelity 10th Floor Furniture Reconfiguration
Job #13860/13861 Fidelity 1st Floor Lobby Art Wiring
Fidelity 245 Summer St, 7th Floor 18-0013-10
water heater
Job #13852 Fidelity 7th Floor Executive Suite Renovation
Job #13852 Fidelity 7th Floor Executive Suite Renovation
Minor demolition and rework of existing partitions with minor mechanical and electrical modifications.
S19-048, connect jumpers, receptacles and plug in base feeds for office workstations @ 245 Summer St 7th floor.
Job #13770 Fidelity Floors 6 & 7 Video Upgrade
Job # 13762 & 13766 Fidelity 1st & 3rd Floors Power for projectors & screens
S18-245 Connect jumpers, receptacles and plug in base feeds for office workstations @ 245 Summer St 3rd floor.
Job #13542 Fidelity 6th Floor Agile Room Renovation
FIDELITY 245 SUMMER STREET, FLOOR 3 LOW VOLTAGE ELECTRICAL 300 VOICE/DATA RENOVATIONS JOB NUMBER 18-0172-10
Job #13489 Fidelity 8th Floor Convert stub to poke thru device
Offices, Research Labs, Commercial, Accy Cafeteria Certificate For: Offices - 10th Floor Alt809562 - 3/29/18 ;
Job #13420 Fidelity 5th Floor Copy/Print rm repurpose
S18-585, Connect jumpers, receptacles and plug in base feeds for office workstations @ 245 Summer St.
Job #13402 Fidelity 11th Floor Lock & Floor Device Wiring
FIDELITY INVESTMENTS 245 SUMMER STREET FLOOR 10 JOB NUMBER 18-0145-10 LOW VOLTAGE ELECTRICAL 100 VOICE DATA RENOVATIONS
Job #13389 Fidelity 7th Floor Copy Print Room Re-Purpose
FIDELITY INVESTMENTS 245 SUMMER STREET FLOOR 9 JOB NUMB ER 18-0146-10 LOW VOLTAGE ELECTRICAL 125 VOICE/DATA RENOVATIONS
Job #13351 Fidelity Project Mayflower - 10th Floor Renovation
Job #13351 Fidelity Project Mayflower - 10th Floor Renovation
FIDELITY INVESTMENTS 245 SUMMER STREET FLOOR 2 JOB NUMBER 18-0113-10 LOW VOLTAGE ELECTRICAL 98 RENOVATIONS VOICE/DATA CABLES
Fidelity -;9th Floor -; Renovations to existing Office.; ;Work includes new lighting, ACT, updating;;finishes and repositioning work stations and reworking offices layouts.; Modify…
Scope of work includes refresh of interior finishes as well as electrical and tel-data for furniture system reorganization.
Job #13312 Fidelity 3rd Floor Renovation to the 3rd Floor
Job #13312 Fidelity Renovation to 3rd Floor
Job #13313 Fidelity Renovation to 9th Floor
Job #13313 Fidelity Renovation to 9th Floor
S18-438, connect jumpers, receptacles and plug in base feeds for office workstations @ 245 Summer St 2nd floor.
Job #13317 Fidelity Lower Level Demo of Super Lan Rm A & B
Renovate elevator lobby
Fidelity -;3rd Floor -; Renovations to existing Office.; ;Work includes new lighting, ACT, updating;;finishes and repositioning work stations and reworking offices layouts.; Modify…
Job #13297 Fidelity 7th Floor 7th Floor Elevator Lobby Renovation
Job #13297 Fidelity 7th Floor 7th Floor Elevator Lobby renovation
Job #13291 Fidelity Floors 14, 7, 3, 1 UPS Conversion Project - Convert normal circuits to UPS (30 Connections)
Job #13276 Fidelity 11th Floor Renovation 11th Floor - Mall & Copy room conversion
Replacing tile, toilets, fixtures
Job #13270 Fidelity 6th Floor Renovation in 6th Floor Healthcare Center
245 Summer Street office space 179 cables low voltage electrical DAS work Job number 18-0066-10
Job #13237 Fidelity 14th Floor A/V Upgrade 14th Floor
We will be creating and open office floor plan along with updating the finishes in a portion of the 7th floor at 245 Summer Street for Fidelity.
Installation of card access devices for security purposes on the 2nd floor.
Installation of Card access, cameras, and intrusion devices for security purposes on the 7th Floor.
FIDELITY INVESTMENT 245 SUMMER ST 7TH FLOOR JOB NUMBER 17-0569-10 LOW VOLTAGE ELECTRICAL 100 VOICE/DATA CABLES
Job #13141 Fidelity 2nd Floor V02 Cold Storage Project
Job #13141 Fidelity 2nd Floor V02 Cold Storage Project
We are renovating to rooms to be converted to a secure data entry room for Fidelity Investments.
Job #13002 Fidelity 7th Floor Renovation to 7th Floor Exec. Suite
Job #13002 Fidelity 7th Floor Renovation in 7th Floor Exec. Suite
Job #13113 Fidelity 14th Floor UPS Conversion Project Remove & replace circuits
Job #13114 Fidelity 1st Floor Demo existing mail room to create new bike storage room @loading dock area
Job #13099 Fidelity 2nd Floor Add (2) receptacles for (2) TV's Add (3) Furniture Floor Cores & (1) outlet
Renovations to existing space to build new partitions in mail room on the first floor to convert additional space to bike storage, new drywall partitions, patching of all finishes,…
For removal of select demo in prep for ALT 756613.
Job #12975 Fidelity 12th Floor Fidelity V12E AV Upgrade. Install 2 Receptacle Outlets
Job #12917 Fidelity 3rd floor Replace existing 3rd floor FCAT lights
Job #12739 Fidelity B & 1st floor Run 3" EMT conduit from existing junction boxes
FIDELITY INVESTMENTS 245 SUMMER STREET LOW VOLTAGE CABLING DATA CABLING FOR 10TH FOR LOBBY AND PANTRYS JOB NUMBER 16-0419-10
POPUP Food Services